Public tenders for energy in Veliko-trnovo Bulgaria

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyBulgariaveliko-trnovo

Delivery of active electrical energy and fulfillment of the functions of a standard balancing group coordinator for the needs of "V & K Yovkovtsi" OOD, Veliko Tarnovo in the Svishtov operation area.

Водоснабдяване и канализация Йовковци ООД | Published May 25, 2017  -  Deadline June 28, 2017
cpvs
09310000

The object of the public procurement is to provide a supply made by purchasing active electricity and performing the functions of a standard balancing group coordinator with a place of execution up to 2 pcs. Objects (2 measurement points) for medium voltage (MV) and 8 pcs. Sites (8 measuring points) for low voltage (LV) in the Svishtov exploitation area of ​​"V & K Yovkovtsi" OOD, Veliko Tarnovo for securing the economic activity of the Company, according to the conditions of the Contracting Authority, detailed in the announcement and the documentation To participate. The technical specification enclosed with the documentation for participation details the sites, the total cost and the monthly electricity consumption for the previous five calendar months for all the detached sites in the Svishtov region of "V & K Yovkovtsi" Ltd. as well as the requirements of the Contracting Authority for execution Of the order. Term of performance of the order - until 01.01.2018, starting with the date of registration of the first registered schedule.

Electricity

Община Велико Търново | Published December 19, 2015
Winner
„Енерго — Про Енергийни услуги“ ЕООД
cpvs
09310000

The order aims choice of electricity supplier and balance group coordinator for the needs of Veliko Turnovo Municipality. The scope of the contract will be selected provider of electricity. Energy projects implemented in the technical specifications of the contract and will perform the same activity - a balance group coordinator.

Electricity

Община Велико Търново | Published August 15, 2015  -  Deadline September 28, 2015
cpvs
09310000

The order aims choice of electricity supplier and balance group coordinator for the needs of Veliko Turnovo Municipality. The scope of the contract will be selected provider of electricity. Energy projects implemented in the technical specifications of the contract and will perform the same activity - a balance group coordinator.

Electricity

Великотърновски Университет „Св. Св. Кирил и Методий“ | Published December 6, 2016  -  Deadline January 10, 2017
cpvs
09310000

The subject of the contract is the choice of provider net active electric power and performing the duties of a balance group coordinator for the needs of the 25 sites of the University "St. St. Cyril and Methodius ", which are described in the technical specification documentation of the contract. The estimated amount of electricity to be delivered in 12 months, is defined in terms of power consumption in the last 12 months totaled 1,618,268 kWh kWh. The estimated amount of electricity does not commit the Contracting Authority to acquire.

Upon delivery must be delivered electricity with quality and procedures as provided for in the Energy Act (EA) and other legislation governing the public relations related to the supply of electricity (including regulations under the Energy Act, the Rules trading electricity (PTEE) and rules for measuring the quantity of electricity (Piquet). as "a balance group coordinator" contractor should take responsibility for balancing include contracting in the balancing energy market as a participant (indirect member ) standard balancing group without sponsor to pay a fee to participate, and provide forecasting consumption contracting authority, including the administration of hourly schedules for consumption sponsor.

Selection of Active Net Electricity Provider and Low Voltage Balancing Coordinator for the needs of KOT- V. Tarnovo EOOD

Комплексен онкологичен център-Велико Търново ЕООД | Published September 26, 2017  -  Deadline October 19, 2017
cpvs
09310000

The subject of the order is the purchase of electricity by purchase. The order includes selecting a net active power provider, a standard balancing group coordinator, full administration of the information stream with ESO AED and OM and taking the cost of imbalances for the healthcare facility. The electricity supply must be in compliance with the applicable regulations: the Energy Act, the Electricity Trading Rules and the Electricity Measurement Rules. Regarding the planning and negotiation of the specific net active electric power quantities The participant selected as a contractor will sign a combined Supply Contract within the meaning of the PTFE - the Contracting Authority pays the Contractor a general invoice the amount of the amount consumed l. energy and network charges, including "excise tax" and "tax obligations to society."

Activities under the Project "Development of Modern Educational Infrastructure in Veliko Tarnovo" under Priority Axis 1 "Sustainable and Integrated Urban Development" of OPRD 2014-2020

Община Велико Търново | Published December 14, 2017  -  Deadline January 17, 2018
cpvs
45000000

The subject of this public procurement contract is the Activities for the implementation of the Construction and Repair Works for the reconstruction and modernization of the buildings and the adjacent spaces of the educational institutions under the "Development of Modern Educational Infrastructure in Veliko Tarnovo" under Priority Axis 1 "Sustainable and Integrated Urban Development" of the Operational Program "Regions in Growth 2014-2020" by lot: OP No 1 - Reconstruction and Modernization of Alen Mak; OP no. 2 - Reconstruction and modernization of "Vodavoda" DG; OP № 3 - Reconstruction of Sofia University "Vladimir Komarov"; OP 4 - Reconstruction, Modernization and Implementation of Energy Efficiency Measures at Sofia University "G. St. Rakovski "and" Sports School - Veliko Tarnovo "; OP 5 - Reconstruction and Implementation of Measures for Energy Efficiency of "Prolet" SG. A participant may bid only for one lot.

"Selection of Electricity Provider and Balancing Group Coordinator for Power Supply for Sites Owned by MOBAL" Dr. Stefan Cherkezov "AD"

Многопрофилна областна болница за активно лечение Д-р Стефан Черкезов АД | Published October 16, 2017  -  Deadline November 17, 2017
cpvs
09310000

Selection of electricity supplier and balancing group coordinator for powering of objects owned by Dr. Stefan Cherkezov AD MOBAL. The contractor supplies for a period of 12 (twelve) months of net active electrical energy and a balancing group coordinator for 8 low-voltage objects, for the needs of MTC "Dr. Stefan Cherkezov" AD. Estimated electricity for one year: about 1 944 880 (one million nine hundred and forty-four thousand eight hundred and eighty) kWh / year.

District heating

Национална агенция за приходите — ТД на НАП Велико Търново | Published April 28, 2017  -  Deadline May 30, 2017
cpvs
09323000

Supply of heat for the needs of Montana Office at the TD of NRA Veliko Tarnovo in the administrative buildings on 11 Lyuben Karavelov Str. And 3 "Jeravica" Square for a period of 24 months as of 3.2.2018.

Supply of heat for the needs of Montana Office at the TD of NRA Veliko Tarnovo in the administrative buildings on 11 Lyuben Karavelov Str. And 3 "Jeravica" square for a period of 2 years, providing in the heated rooms a temperature, according to the norms, With tolerances. The inclusion of the heating of consumers during the heating season (for the heating season is considered the period from 1.11. To 31.3.) Is performed when the average daily outdoor air temperature in 3 consecutive days is less than +12 ° C; Switching off heating during the heating season by raising the average daily outdoor temperature in 3 consecutive days above +12 ° C or at the written request of the developer outside the heating season. Maintenance, repair and adjustment of the facilities in the boiler plants, in accordance with the technical rules and norms for design, construction and operation of the facilities and facilities for production, transmission and distribution of thermal energy, determined by the ordinances under Art. 83, para. 1, item 2 and art. 125, para. 4 of the Energy Act.

Electricity

Национален военен университет „Васил Левски“ | Published April 29, 2017  -  Deadline May 31, 2017
cpvs
09310000

The subject of the procurement includes the supply of net active electrical energy for the needs of NSA "Vasil Levski" in the region of Veliko Tarnovo and Shumen district, provision of a service for consumption forecasting as well as preparation of schedules by the balancing group coordinator , Their submission, adjustment of the submitted schedules, liability for balancing and all activities related to participation in the contracting authority's electricity market.

The scope, scope and requirements for the performance of the public procurement are detailed and regulated in Section I. Technical specifications of procurement documentation.

- Preparation by the Contractor of the daily hourly load schedules and covering their imbalances and the parameters for their formation over the term of the contract. This daily schedule will be a common type of expected hourly energy load. The daily schedule is 24 hours, starting from 00:00 to 24:00 for the day.

- Submission by the Contractor of the hourly daily delivery schedules of ESO, in accordance with the provisions of the ATEX. Timely administration of schedules and exchange of information with ESO EAD.

- Coordination and balancing of the net electricity.

- Signing electricity delivery schedules through the Web Portal. Generate different reports - graphical and table representation of agreed and measured quantities of electricity, unbalances.

- Monitor the hourly measured amounts of electrical energy in tabular and graphical form.

- Maintenance and transmission by the Contractor of an electronic data base for the hourly and monthly electricity consumption of the region of Veliko Tarnovo and Shumen.

- Providing assistance in the process of registration of the site of the Contracting Authority.

- The participant should have a built-in point tracking system that allows on-line access for users.

- The participant should declare the number of members joining ...

"Selection of electricity supplier and balancing group coordinator for the needs of Veliko Turnovo Municipality"

Община Велико Търново | Published September 1, 2017  -  Deadline October 6, 2017
cpvs
09310000

The subject of the contract includes: The supply of electricity in quality and order, as provided by the Energy Act (EE) and other regulations regulating the public relations related to the supply of electricity. Balancing Group Coordinator Sending by the Contractor the hourly daily delivery schedules of ESO, in accordance with the provisions of the ATEX; Registering electricity delivery schedules through the Web Portal .; Monitor the hourly measured amounts of electricity in tabular and graphical form; Maintenance and transmission by the Contractor of an electronic data base for the hourly and monthly electricity consumption of the Municipality of Veliko Tarnovo; Providing assistance in the process of registration of the object of the Contracting Authority on the liberalized electricity market. The contractor is responsible for administering schedules and exchanging information with ESO.

"Selection of electricity supplier and balancing group coordinator for the needs of Veliko Turnovo Municipality"

Община Велико Търново | Published July 6, 2017  -  Deadline August 10, 2017
cpvs
09310000

The subject of the contract includes: Supply of electricity in quality and order, as provided by the Energy Act (EE) and other regulations regulating the public relations related to the supply of electricity. Balancing Group Coordinator Sending by the Contractor the hourly daily delivery schedules of ESO, in accordance with the provisions of the EUTL; Register electricity delivery schedules through the Web Portal .; Monitor the hourly measured amounts of electricity in tabular and graphical form; Maintenance and transmission by the Contractor of an electronic data base for the hourly and monthly electricity consumption of the Municipality of Veliko Tarnovo; Assisting in the process of registration the object of the Contracting Authority on the liberalized electricity market. The contractor is responsible for administering schedules and exchanging information with ESO.

Choosing a contractor to carry out engineering project "Building a crisis center for people."

Община Велико Търново | Published February 20, 2017  -  Deadline April 5, 2017
cpvs
45211200

Activities subject of the contract includes design - developing a "working draft" of the two-storey houses, which will serve as a crisis center for persons with a total capacity of 30 people and approximate / Indicative area of ​​365 sq m house. The houses should be designed and constructed as passive housing in order to reduce overhead costs in the operation of buildings. The operating investment project should include: Architectural part; Part DESIGN; Electrical projects; Part HVAC; Part of Water; Part ENERGY EFFICIENCY; Part Park layout and landscaping; Part Geodesy; Part FIRE SAFETY; Part PBZ; Part PUSO; Part budget documentation. A more detailed presentation of the required contents of the parts contained in the technical specifications. The contract includes the execution of works according to the developed and approved by the Principal detailed design and exercising supervision.

Selection of a contractor for carrying out independent construction supervision and evaluating the conformity of the projects in connection with the project "Building a crisis center for persons" by positions:

Община Велико Търново | Published September 1, 2017  -  Deadline October 5, 2017
cpvs
45211200

The subject matter of the procurement includes designing a "project" of two two-storey houses that will perform the function of a crisis center for persons with a total capacity of 30 people and an approximate / indicative built-up area of ​​365 sq.m per house. The houses should be designed and built as passive dwellings in order to reduce the overheads in the operation of the buildings. The working investment project should include: Part of ARCHITECTURAL; Part CONSTRUCTION; Part ELEKTRO; Part HVAC; Part water; Part ENERGY EFFICIENCY; Part Parking and landscaping; Part Geodesy; Part FIRE SAFETY; Part BWP; Part PUSO; PART COVER DOCUMENTATION. A more detailed presentation of the required content of the individual parts is contained in the technical specifications. The order also includes the execution of the construction works according to the design work and the author supervision exercised and approved by the Contracting Authority.

Electricity

Многопрофилна областна болница за активно лечение „Д-р Стефан Черкезов“ АД | Published October 14, 2017  -  Deadline November 16, 2017
cpvs
09310000

Selection of electricity supplier and balancing group coordinator for powering of objects owned by Dr. Stefan Cherkezov AD MOBAL.

The contractor shall deliver for a period of 12 (twelve) months, the net active electrical energy and the balancing group coordinator for 8 low-voltage objects, for the needs of MTC "Dr. Stefan Cherkezov" AD.

Estimated amount of electricity over 1 year: about 1 944 880 (one million nine hundred and forty-four thousand eight hundred and eighty) kWh / year.

"Selection of Electricity Provider and Balancing Group Coordinator for powering of objects owned by Dr. Stefan Cherkezov JSC MOBILE".

Delivery of net electricity and coordinator of a balancing group under the conditions of a liberal market for the needs of the Center for Mental Health V. Tarnovo EOOD.

Център за психично здраве /ЦПЗ/ Велико Търново ЕООД /предишно наименование - Областен диспансер за психични заболявания със стационар /ОДПЗС/ - Велико Търново ЕООД/ | Published August 7, 2017  -  Deadline August 21, 2017
cpvs
09310000

Short description The delivery of net electricity and a balancing group coordinator under the conditions of a liberal market for the needs of the Center for Mental Health V.Tarnovo Ltd. Veliko Tarnovo for a period of 12 months, according to the terms of the technical specification. The procedure is carried out for the purpose of choosing an active electric energy supplier and a medium voltage balancing coordinator for one site within the territory of the "Center for Mental Health V.Tarnovo" Ltd. Veliko Tarnovo. The participant should provide the Contracting Authority with a forecasting service and balancing responsibility. The price should include active electricity, balancing costs, and costs of the Participant to provide the services described above. The Contracting Authority will not pay a fee for participation in a balancing group. The volume of the order can be estimated on the basis of what is stated in the Documentation as well as published in the buyer's customer consumption profile in kWh of the Employer for a 12 month period which is 271.3 MWh

Architectural, construction, engineering and inspection services

Община Велико Търново | Published November 29, 2017
Winner
„Никифоров Студио“ ЕООД
cpvs
71000000

For each of the lots: in execution of the assigned public procurement contract, the Contractor shall carry out complete, adequate and fully compliant with the requirements of the Assignor for the exercising of author's supervision during the execution of the construction and installation works on the investment project in all their individual parts, in the design phase, until the issuance of "Permission to use" respectively "Certificate of putting into operation". The subject of this procurement for each item includes the following activities: Visiting the site (building) during the exercising of the author's supervision; Assistance of the Assignor - Veliko Tarnovo Municipality in the realization of the project; Expert activities and consultancy; Preparation and validation of executive documentation; Participation in admission committee (s).

Lot 1 - Estimated value - BGN 24 693.40 excluding VAT. Exercise of author's supervision of activities for carrying out construction works on sites: Object 1 "Improvement of the urban environment in hc. "Cholakovtsi", Veliko Tarnovo: reconstruction and rehabilitation of streets, pedestrian alleys and sidewalks incl. energy saving street lighting and an affordable environment (Phase 1). Estimated value: BGN 14,548.48 without VAT Object 2: "Aleksandar" quarter of "Cholakovtsi" - Buzludzha district, Veliko Tarnovo incl. energy-saving street lighting and an affordable environment. "Estimated value: 10 144,92 BGN without VAT.

Construction work

Община Велико Търново | Published October 22, 2016
Winner
„Промишлена енергетика-ВТ“ АД, ЕИК: 104002900
cpvs
45000000, 45300000, 45331000

OP1: The project developed measures prescribed in detailed energy audit.

1. Heating installation. The heating system is water-pump 75/60 ​​° C. Provided heaters are steel radiators with a height of 500 mm. Two pipe distribution network, radiation scheme. That will be mounted under the ceiling in the basement and will be filled with polypropylene pipes stabilized. By collectors in the boiler powered 4 heating branch. By way valves branches managed by internal and external temperature, will ensure pofasadno regulate the installation depending on external conditions. The distribution network in the basement insulation is provided. Vertical pipes will be installed outdoors in all rooms. At each heater will be installed radiator valve inlet and shut off the exit. When passing through construction elements of the building, the pipes will be installed in casing and two layers of insulation to prevent deformation. The distribution network provided U-joints in places referred to in the drawings. On the risers are provided for ball valves with discharger. Radiators in the distribution network will be drained by secret taps to drain. The installation will be evacuated by manual and automatic air vents installed on each radiator and the high points of the distribution network.

2. Boiler. Boiler installation is an existing, completed in 2012. Installed 2 boilers with a capacity of 310 kW, and 160 kW. Replaced collectors existing branches are mounted pumps and three-way valves. Pump is installed to power the boilers. In the collectors are made conclusions about additional 2 branches being mounted cranes respective conclusions. Will be installed pumps, three-way valves, check valves and valves for the other two branches of the installation.

3. The control system of the boiler and room temperatures. To provide automatic control of the boiler will be installed ...