Call +44 800 9755 164

Public tenders for energy in Svilengrad Bulgaria

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyBulgariasvilengrad

"Performing works - Energy Efficient measures of the project" Municipal Administration "Svilengrad" project "Energy efficiency in buildings, providing administrative services"

Община Свиленград | Published December 19, 2016  -  Deadline February 8, 2017
"Performing works - Energy Efficient measures of the project" Municipal Administration "Svilengrad" project "Energy efficiency in buildings, providing administrative services", Contract № BG16RFOP001-2.001-0074-C01, financed by OPRD 2014-2020 . The project envisages construction works in the implementation of measures for energy efficiency of a building - project "Municipal administration - Svilengrad." The building site of the works has a total area - 4222.30 m2

"Construction work for the implementation of energy efficiency measures on the subject:" Kindergarten Clover "in the city. Svilengrad

Община Свиленград | Published December 19, 2016  -  Deadline January 23, 2017
"Construction work for the implementation of energy efficiency measures on the subject:" Kindergarten Clover "in the city. Svilengrad in the project" Energy efficiency in buildings in educational infrastructure "BG16RFOP001-2.001-0054-C01", financed under Priority Axis 2 OP "Regions for growth" 2014-2020. " The project envisages construction works in the implementation of measures for energy efficiency building -TSDG "Clover" with area 1815.83 m2.

Performing works - Energy Efficient measures of the project "Municipal Enterprise - Development and landscaping" Svilengrad "

Община Свиленград | Published January 9, 2017  -  Deadline February 15, 2017
Performing works - Energy Efficient measures of the project "Municipal Enterprise - Development and landscaping" Svilengrad "project" Energy efficiency in buildings, providing administrative services ", Contract № BG16RFOP001-2.001-0074-C01, financed by OPRD 2014 -2020 works object Municipal enterprise "Improvement and landscaping" Svilengrad are in accordance with approved investment project in the implementation of energy efficiency measures.

Construction supervision in carrying out construction works - Energy efficient measures on the subject: "Municipal administration" in the town. Svilengrad "

Община Свиленград | Published December 16, 2016  -  Deadline January 24, 2017
Construction supervision in carrying out construction works - Energy efficient measures on the subject: "Municipal administration" in the town. Svilengrad "project" Energy efficiency in buildings, providing administrative services ", Contract № BG16RFOP001-2.001-0074-C01, funded by OPRD 2014-2020, supervision of works: supervision is implemented in mandatory coverage as required by TDA requirements of Regulation № 3 of 2003 on drawing up acts and protocols during construction, taking into account the requirements of the Ordinance on essential requirements for construction and conformity assessment of construction products and all laws and regulations in the construction sector in Bulgaria. Contractor shall be responsible for the activities and obligations as a participant in the investment process stipulated in art. 166 and Art. 168 of the SPA as well as those arising from Art. 178 of TDA.

Construction work

Община Свиленград | Published January 6, 2017  -  Deadline February 23, 2017

Performing works - Energy Efficient measures of the project "Municipal Administration" in the town. Svilengrad "project" Energy efficiency in buildings, providing administrative services ", Contract № BG16RFOP001-2.001-0074-C01, financed by OPRD 2014-2020

The project envisages construction works in the implementation of measures for energy efficiency of a building - project "Municipal Administration - Svilengrad." The building site of the works has a living area - 4 222.30 m 2 .

Construction work

Община Свиленград | Published December 20, 2016  -  Deadline February 6, 2017

"Performing works - Energy Efficient measures of the project" Municipal Administration "in the town. Svilengrad" project "Energy efficiency in buildings, providing administrative services", Contract № BG16RFOP001-2.001-0074-C01, financed by OPRD 2014-2020 .

The project envisages construction works in the implementation of measures for energy efficiency of a building - project "Municipal Administration - Svilengrad." The building site of the works has a living area - 4 222.30 m 2 .

"Performing works - Energy Efficient measures of the project" Municipal Administration "in the town. Svilengrad" project "Energy efficiency in buildings, providing administrative services", Contract № BG16RFOP001-2.001-0074-C01, financed by OPRD 2014-2020 .

The project envisages construction works in the implementation of measures for energy efficiency of a building - project "Municipal Administration - Svilengrad." The building site of the works has a living area - 4 222.30 m 2 .

The project envisages construction works in implementation of energy efficiency measures project "Municipal Administration - Svilengrad." The project is set and providing accessible environment for people with disabilities, fire safety measures. The main measures foreseen include: thermal insulation on the inside of exterior walls of the building, heat and hydro isolation on the roof, replacing windows, building a system for opolzotvoryavane,na renewable Sources Photovoltaic installation, building air-conditioning. It is envisaged that the supply and installation of heat pump, Air cooled unit - chiller. The project also provides for the replacement of existing lighting installation and construction of lightning protection installation. All types and quantities of works are specified in the investment project and KS, part of the documentation for the procurement and major in technical specification.

"Implementation of engineering (design, construction, supervision) project" Library, Svilengrad "Project BG16RFOP001-2.001-0055-S01

Община Свиленград | Published December 22, 2016  -  Deadline February 6, 2017
"Implementation of engineering (design, construction, supervision) project" Library, Svilengrad "Project BG16RFOP001-2.001-0055-S01" Energy efficiency in building cultural infrastructure-Library, Svilengrad Operational Programme "Regions in growth "2014-2020,

Construction work

Община Свиленград | Published January 7, 2017  -  Deadline February 17, 2017

"Implementation of engineering (design, construction, supervision) Object Library, c. Svilengrad" Project BG16RFOP001-2.001-0055-S01 "Energy efficiency in building cultural infrastructure, library, city. Svilengrad under the" Regions for Growth "2014-2020,"

Construction work

Община Свиленград | Published December 20, 2016  -  Deadline January 20, 2017

"Construction work for the implementation of energy efficiency measures on the subject:" Kindergarten Clover "in the city. Svilengrad in the project" Energy efficiency in buildings in educational infrastructure "BG16RFOP001-2.001-0054-C01", financed under Priority Axis 2 OP "Regions for growth" 2014-2020. "

The project envisages construction works in the implementation of measures for energy efficiency building - Kindergarten "Clover" with area 1 815.83 m 2 .

"Construction work for the implementation of energy efficiency measures on the subject:" Kindergarten Clover "in the city. Svilengrad in the project" Energy efficiency in buildings in educational infrastructure "BG16RFOP001-2.001-0054-C01", financed under Priority Axis 2 OP "Regions for growth" 2014-2020. "

The project envisages construction works in the implementation of measures for energy efficiency building -TSDG "Clover" with area 1 815.83 m 2 .

The project is set and providing accessible environment for people with disabilities, fire safety measures. The main measures foreseen include: thermal insulation of external walls of the building, heat and hydro insulation of the roof, window replacement, installation of a new boiler plant with a boiler with a combined burner construction of a new water system for domestic use. It is envisaged that the supply and installation of highly selective solar collectors. The project also provides for the replacement of existing lighting installation, building fire alarm system, construction of lightning protection installation. All types and quantities of works are specified in the technical specification, investment project and KS, part of the documentation on the contract.

Construction work

Община Свиленград | Published December 22, 2016  -  Deadline February 2, 2017

"Implementation of engineering (design, construction, supervision) Object Library, c. Svilengrad" Project BG16RFOP001-2.001-0055-S01 "Energy efficiency in building cultural infrastructure, library, city. Svilengrad under the" Regions for Growth "2014-2020,"

The subject of the contract includes the execution of engineering (design, construction, supervision) in the implementation of energy efficiency measures and repairs on site "Library, located on the boulevard." Bulgaria "№ 26" in the town. Svilengrad. The building is monolithic, and has 3 floors, one semi-underground, attic and a separate tower on the north facade. The building has an area of ​​1890 square meters The envisaged activities are: Development of technical projects in compliance with legal requirements. Performing works - The main measures envisaged and repairs include: thermal insulation of the building, boiler, heating and ventilation systems, roof repairs, new interior joinery, repair of staircase railings, finishing premises - wall, floor and ceiling coverings, El . and plumbing and bathrooms. The project is set and providing accessible environment for people with disabilities, and implementation of all support activities and finishing repairs. Making supervision during the execution of works on site. All kinds of activities are listed in Energy and technical inspection in public procurement documentation and technical specification.

"Implementation of engineering (design, construction, supervision) for" Residential building located on the street. "Strashimir Dochkov" № 18, Svilengrad, implemented a project BG16RFOP001-2.001-0155-C01

Община Свиленград | Published December 22, 2016  -  Deadline February 2, 2017
Area: 2893 kv.m.Predmeta OP includes execution of engineering (design, construction, supervision) in the implementation of energy efficiency measures on the subject: Residential building located on the street. "Strashimir Dochkov" №18, g. Svilengrad ".Predvizhdani activities are: Development of technical projects in compliance with legal iziskvaniya.Izvarshvane of CMP-main measures foreseen include: thermal insulation of external walls of the building, heat and hydro isolation on the roof, replacement of windows, thermal insulation of pod.Proekta also provides for the replacement of existing lighting installation in the common areas and construction of lightning instalatsiya.V project is at stake and ensuring an accessible environment for people with disabilities, and implementation of all accompanying deynosti.Osashtestvyavane of supervision during the execution of works on site .All types of activities listed in Energy and technical inspection, documentation on public procurement in the technical specification

"Implementation of engineering (design, construction, supervision) for" Residential building located on the street. "Septemvriitsi" № 12, Svilengrad, implemented a project BG16RFOP001-2.001-0155-C01

Община Свиленград | Published December 22, 2016  -  Deadline February 1, 2017
Area: 2840 square meters The subject of the OP include: engineering (design, construction, supervision) in the implementation of energy efficiency measures at the site "Residential building located on the street." Septemvriitsi "№ 12" .Predvizhdani activities are: Development of technical projects subject to regulatory requirements. Perform CMP-main measures foreseen include: thermal insulation of external walls of the building, heat and hydro isolation on the roof, replacement of windows, thermal insulation of pod.Proekta also provides for the replacement of existing lighting installation in the common areas and construction of lightning protection installation. The project is set and providing accessible environment for people with disabilities, and implementation of all accompanying deynosti.Osashtestvyavane of supervision during the execution of works on site. All kinds of activities are listed in Energy and technical inspection, documentation on public procurement in the technical specification.

Implementation of engineering (design, construction, supervision) project "Residential building located on the street." Skobelev "№ 29, Svilengrad, implemented a project BG16RFOP001-2.001-0155-C01"

Община Свиленград | Published December 22, 2016  -  Deadline February 15, 2017
Area: 3009 kv.m.Predmetat OP includes execution of engineering (design, construction, supervision) in the implementation of energy efficiency measures an object-residential block, located on the street. "Skobelev" № 29 ".Predvizhdani activities They are: Development of technical projects in compliance with legal iziskvaniya.Izvarshvane of CMP-main measures foreseen include: thermal insulation of external walls of the building, heat and hydro isolation on the roof, replacement of windows, thermal insulation of pod.Proekta also provides replacement existing lighting installation in the common areas and construction of lightning instalatsiya.V project is at stake and ensuring an accessible environment for people with disabilities, and implementation of all support activities. Making supervision during the execution of works on site. All kinds of activities are listed in Energy and technical inspection, documentation on public procurement in the technical specification.

Construction work

Община Свиленград | Published January 6, 2017  -  Deadline February 20, 2017

Area: 2840 square meters subject of OP include: engineering (design, construction, supervision) in the implementation of energy efficiency measures at the site "Residential building located on the street." Septemvriitsi "№ 12". Envisaged activities are: Development of technical projects in compliance with legal requirements. Perform CMP-main measures foreseen include: thermal insulation of external walls of the building, heat and hydro isolation on the roof, replacement of windows, thermal insulation of floors. The project also provides for the replacement of existing lighting installation in the common areas and construction of lightning protection installation. The project is set and providing accessible environment for people with disabilities, and implementation of all support activities. Making supervision during the execution of works on site. All kinds of activities are listed in Energy and technical inspection, documentation on public procurement in the technical specification.

Construction work

Община Свиленград | Published January 6, 2017  -  Deadline March 1, 2017

Area: 3009 square meters object OP includes execution of engineering (design, construction, supervision) in the implementation of energy efficiency measures an object-residential block, located on the street. "Skobelev" № 29 ". Envisaged activities are: Development of technical projects in compliance with legal requirements. Perform CMP-main measures foreseen include: thermal insulation of external walls of the building, heat and hydro isolation on the roof, replacement of windows, thermal insulation of floors. The project also provides for the replacement of existing lighting installation in the common areas and construction of lightning protection installation. The project is set and providing accessible environment for people with disabilities, and implementation of all support activities. Making supervision during the execution of works on site. All kinds of activities are listed in Energy and technical inspection, documentation on public procurement in the technical specification.

"Implementation of engineering (design, construction, supervision) for" residential block, square. Prostor, bl.4, Svilengrad, implementing the project BG16RFOP001-2.001-0154-C01

Община Свиленград | Published January 12, 2017  -  Deadline March 6, 2017
The subject of the contract includes the execution of engineering (design, construction, supervision) in the implementation of energy efficiency measures at the site "Residential building, located in the square. Prostor, bl. 4 g. Svilengrad Envisaged activities are: Development of technical projects in compliance with legal requirements. Perform SMR- main measures foreseen include: thermal insulation of external walls of the building, heat and hydro isolation on the roof, replacement of windows, thermal insulation of floors. The project also provides for the replacement of existing lighting installation in the common areas and restoration of lightning protection installation. The project is set and providing accessible environment for people with disabilities, and implementation of all support activities. Making supervision during the execution of works on site. All kinds of activities are listed in Energy and technical investigation, documentation and teh.spetsifikatsiya. Area of ​​2523m2.

"Implementation of engineering (design, construction, supervision) for" residential block, square. Prostor, bl.5, Svilengrad, implementing the project BG16RFOP001-2.001-0154-C01

Община Свиленград | Published January 13, 2017  -  Deadline March 7, 2017
The subject of the contract includes the execution of engineering (design, construction, supervision) in the implementation of energy efficiency measures at the site "Residential building, located in the square. Prostor, bl. 5 g. Svilengrad Envisaged activities are: Development of technical projects in compliance with legal requirements. Perform SMR- main measures foreseen include: thermal insulation of external walls of the building, heat and hydro isolation on the roof, replacement of windows, thermal insulation of floors. The project also provides for the replacement of existing lighting installation in the common areas and restoration of lightning protection installation. The project is set and providing accessible environment for people with disabilities, and implementation of all support activities. Making supervision during the execution of works on site. All kinds of activities are listed in Energy and technical investigation, documentation and teh.spetsifikatsiya.RZP 2617 m2.

"Implementation of engineering (design, construction, supervision) for" residential block, square. Prostor, bl.6, Svilengrad, implementing the project BG16RFOP001-2.001-0154-C01

Община Свиленград | Published January 13, 2017  -  Deadline March 9, 2017
The subject of the contract includes the execution of engineering (design, construction, supervision) in the implementation of energy efficiency measures at the site "Residential building, located in the square. Prostor, bl. 6 g. Svilengrad. Envisaged activities are: Development of technical projects in compliance with legal requirements. Perform SMR- main measures foreseen include: thermal insulation of external walls of the building, heat and hydro isolation on the roof, replacement of windows, thermal insulation of floors. The project also provides for the replacement of existing lighting installation in the common areas and restoration of lightning protection installation. The project is set and providing accessible environment for people with disabilities, and implementation of all support activities. Making supervision during the execution of works on site. All kinds of activities are listed in Energy and technical investigation, documentation and teh.spetsifikatsiya. Area of ​​2595 m2.

Construction work

Община Свиленград | Published December 22, 2016  -  Deadline February 13, 2017

Area: 3009 square meters object OP includes execution of engineering (design, construction, supervision) in the implementation of energy efficiency measures an object-residential block, located on the street. "Skobelev" № 29 ". Envisaged activities are: Development of technical projects in compliance with legal requirements. Perform CMP-main measures foreseen include: thermal insulation of external walls of the building, heat and hydro isolation on the roof, replacement of windows, thermal insulation of floors. The project also provides for the replacement of existing lighting installation in the common areas and construction of lightning protection installation. The project is set and providing accessible environment for people with disabilities, and implementation of all support activities. Making supervision during the execution of works on site. All kinds of activities are listed in Energy and technical inspection, documentation on public procurement in the technical specification.

Area housing block: 3009 square meters covered by the contract include: implementation of engineering (design, construction, supervision) in the implementation of energy efficiency measures at the site "Residential building located on the street." Skobelev " № 29 ". "Envisaged activities are: Development of technical projects in compliance with legal requirements. Perform SMR- main measures foreseen include: thermal insulation of external walls of the building, heat and hydro isolation on the roof, replacement of windows, thermal insulation of floors. The project also provides for the replacement of existing lighting installation in the common areas and construction of lightning protection installation. The project is set and providing accessible environment for people with disabilities, and implementation of all support activities. Making supervision during the execution of works on site. All kinds of activities are listed in Energy and technical inspection, documentation on public procurement in the technical specification.

Construction work

Община Свиленград | Published December 22, 2016  -  Deadline January 30, 2017

Area: 2840 square meters subject of OP include: engineering (design, construction, supervision) in the implementation of energy efficiency measures at the site "Residential building located on the street." Septemvriitsi "№ 12". Envisaged activities are: Development of technical projects in compliance with legal requirements. Perform CMP-main measures foreseen include: thermal insulation of external walls of the building, heat and hydro isolation on the roof, replacement of windows, thermal insulation of floors. The project also provides for the replacement of existing lighting installation in the common areas and construction of lightning protection installation. The project is set and providing accessible environment for people with disabilities, and implementation of all support activities. Making supervision during the execution of works on site. All kinds of activities are listed in Energy and technical inspection, documentation on public procurement in the technical specification.

Area housing block: 2840 square meters covered by the contract include: implementation of engineering (design, construction, supervision) in the implementation of energy efficiency measures at the site "Residential building located on the street." Septemvriitsi "№ 12 ". Envisaged activities are: Development of technical projects in compliance with legal requirements. Perform SMR- main measures foreseen include: thermal insulation of external walls of the building, heat and hydro isolation on the roof, replacement of windows, thermal insulation of floors. The project also provides for the replacement of existing lighting installation in the common areas and construction of lightning protection installation. The project is set and providing accessible environment for people with disabilities, and implementation of all support activities. Making supervision during the execution of works on site. All kinds of activities are listed in Energy and technical inspection, documentation on public procurement in the technical specification.