Public tenders for energy in Sofia Bulgaria

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Works for complete or part construction and civil engineering work

„ЧЕЗ Разпределение България“ АД | Published March 21, 2017  -  Deadline April 20, 2017
cpvs
45200000

The subject of this contract is related to maintenance and repair of buildings and adjacent facilities rented or owned by the "CEZ Distribution Bulgaria" in the city. Sofia and Sofia region, Pernik, Kyustendil, Blagoevgrad, Pleven, Lovech, Vratsa Montana, Vidin.

"CEZ Distribution Bulgaria" held an open procedure for procurement Ref. № PPS 17-018 and subject: "Execution of construction works on the buildings and adjacent facilities rented or owned by the" CEZ Distribution Bulgaria "AD" in the city. Sofia and Sofia region, Pernik, Kyustendil, Blagoevgrad, Pleven, Lovech, Vratsa, Montana, Vidin.

The subject of this contract is related to maintenance and repair of buildings and adjacent installations. Given the wide variety of works and objects which may be awarded, the same can not be detailed in this notice. The main types of work which the contracting authority plans to be implemented referred to in the documentation sites, including, but not limited to are: brick and / or aerated concrete masonry, stucco, coverings, plaster and plastering, drywall, waterproofing, insulation , painting, replacement of windows, roofing and tinsmith works, installations - electrical and plumbing and more. A detailed description of the types of work is given in the bills of tender documentation. At this stage they can not identify their specific quantities

41 of the AP of EA as well as building units (rooms, facades, roofs and more. Items), representing site energy facilities having administrative, residential or other purposes unrelated to the distribution of electricity. Energy) in order to improve construction and structural condition of the buildings (parts of buildings) included therein and functional condition of the building systems, and hence working conditions and use for its intended purpose of these buildings, increasing their operational life and reliability.

All materials needed to perform the contract have an obligation to delivery of the selected contractor.

Training facilities building

Агенция „Митници“ | Published February 15, 2017  -  Deadline March 2, 2017
cpvs
45214800, 45311000, 45312100, 45320000, 45331000, 42512000, 45420000, 45421145, 45421146, 45430000, 45440000

Subject to the award of this contract is: "Reconstruction of an administrative building with ID 65677.1.88.4 in town. Svilengrad quarter." Petko Voyvoda "street." Asen Iliev "№ 4," Learning Centre ". With reconstruction activities are provided facilities for training of Agency "Customs" and places of their night. By creating a training center to satisfy the simultaneous achievement of the objectives of reducing funds for long-term mission of the Agency's staff and training them.

Reconstruction will be realized through the reorganization of existing premises and spaces, renovation of old flooring, tiling and plastering, implementation of measures to improve the energy efficiency of the building and building a system for central air conditioning of the building included the delivery of its constituent components (pipe network, end indoor and outdoor units, valves, air ducts, etc.).

Delivery of active power. Energy and choice of coordinator of standard balancing group for the sites own. of "BDZ-TP" LTD connected to elektrorazpred. networks of CEZ, EVN and Energo for a period 1d. "

БДЖ-Товарни превози ЕООД | Published February 16, 2017  -  Deadline March 13, 2017
cpvs
09310000

Public procurement: "Supply of active power and choice of coordinator of standard balancing group of objects owned by" BDZ - Freight services "connected to the distribution networks of CEZ, EVN and Energo for one year."

Renovation for Energy Efficiency of Residential Buildings in the territory of Sofia Municipality - district "Student" in six lots.

Столична община - район Студентски | Published February 16, 2017  -  Deadline March 16, 2017
cpvs
45210000

Renovation for Energy Efficiency of Residential Buildings in 6 lots: 1.Inzhenering (design and construction) "Building with Adm. address gr. Sofia, "Bug", bl. 21; 2.Inzhenering (design and construction) "Building with Adm. address Sofia, "Mladost 1" bl.103; 3.Izgotvyane conformity assessment of investment projects with the essential requirements for construction and construction supervision during the construction of "Building with Adm. address gr. Sofia jk "Bug" bl.21; 4.Izgotvyane conformity assessment of investment projects with the essential requirements for construction and construction supervision during the construction of "Building with Adm. address gr. Sofia jk "Mladost 1" bl.103; 5.Investitorski control during the design and construction of "Building with Adm. address Sofia, jk "Bug" bl.21; 6.Investitorski control during the design and construction of "Building with Adm. address gr. Sofia "Mladost 1" bl.103.

Construction / major renovation / reconstruction and implementation of measures to increase the energy efficiency of schools and kindergartens in Sofia Municipality, in 26 lots

Столична община | Published March 9, 2017  -  Deadline April 12, 2017
cpvs
45000000

Construction / major renovation / reconstruction and implementation of measures to increase the energy efficiency of schools and kindergartens in Sofia Municipality, in 26 lots. CMP must be met in accordance with the explanatory notes in all parts of objects investment projects (Appendix № 1) Bills of Quantities (Appendix № 2) and graphic materials (Appendix № 3) to this documentation. All building materials (products) that are used in the construction of stage performance must comply with Decree № RD-02-20-1 from 5 February 2015. the terms and conditions for use of construction products in the works of the Republic of Bulgaria.

Major upgrade of heating and ventilation system by building a central heating installation of heat pump Water-Land DG 89 "Bright rainbow" sq. Hostile and Shelter for stray dogs in the quarter. Seslavtsi region "Kremikovtzi" a program BG 04 "energy efficiency and renewable energy."

Столична община - Район "Кремиковци" | Published March 10, 2017  -  Deadline March 27, 2017
cpvs
45300000

All documents and applications, including and Bill of Quantities are posted on the buyer profile. Participants must provide evidence of conditions which must be met together with all duly completed sample documents posted on the buyer profile. If the participant fails to even one of the enclosed samples or provides evidence of the conditions to be met, the offer of the same candidate will be considered and evaluated.

"INCREASE ENERGY EFFICIENCY 44th University" NEOFIT BOZVELI "MUNICIPALITY -" Poduyane "

Столична община - район Подуяне | Published February 21, 2017  -  Deadline March 23, 2017
cpvs
45000000

Increasing the energy efficiency of 44 University "Neophyte Bozveli" Metropolitan Municipality - "Poduyane" includes the following works: 1. Thermal insulation of exterior walls; 2. Replacement of windows; 3. Thermal insulation of the roof; 4. Thermal insulation of floors; 5. Repair of internal heating; 6. Repair of electrical installation.

Insurance of property and responsibility of "Bulgargaz" EAD in three lots

Булгаргаз ЕАД | Published February 17, 2017  -  Deadline March 13, 2017
cpvs
66510000

By lot № 1 - insurance "liability" in connection with the activities performed by "Bulgargaz" EAD licensing activities under the Energy Act - public supply of natural gas. By lot № 2 - Insurance of inventories (natural gas) in Chiren underground gas storage and gas transit transmission system on the territory of Romania. By lot № 3 - Insurance of property, plant and equipment; Off-balance sheet assets and materials; of fixtures and fittings and computer equipment owned by "Bulgargaz" EAD.

Training facilities building

Агенция „Митници“ | Published March 7, 2017  -  Deadline March 9, 2017
cpvs
45214800, 45311000, 45312100, 45320000, 45331000, 42512000, 45420000, 45421145, 45421146, 45430000, 45440000

Subject to the award of this contract is: "Reconstruction of an administrative building with ID 65677.1.88.4 in town. Svilengrad quarter." Petko Voyvoda "street." Asen Iliev "№ 4," Learning Centre ". With reconstruction activities are provided facilities for training of Agency "Customs" and places of their night. By creating a training center to satisfy the simultaneous achievement of the objectives of reducing funds for long-term mission of the Agency's staff and training them.

Reconstruction will be realized through the reorganization of existing premises and spaces, renovation of old flooring, tiling and plastering, implementation of measures to improve the energy efficiency of the building and building a system for central air conditioning of the building included the supply of aggregate and components (pipe network, end indoor and outdoor units, valves, air ducts, etc.).

"Execution of works on implementation of energy efficiency measures for the needs of the prison Vratsa and Lovech prison" in two lots

ДП ФОНД ЗАТВОРНО ДЕЛО | Published February 27, 2017  -  Deadline March 29, 2017
cpvs
45000000

"Execution of works on implementation of energy efficiency measures for the needs of the prison Vratsa and Lovech prison" in two lots: Lot 1. "Performing works on the implementation of energy efficiency measures for the needs of the prison Vratsa" Lot 2. "Performing works on the implementation of energy efficiency measures for the needs of the prison Lovech"

Execution of construction works for a major update of the envelope of Education Block 3, upgrading the lighting system and repair in classrooms in Block 1i..prod.v VI.3)

Технически университет - София | Published February 28, 2017  -  Deadline April 6, 2017
cpvs
45000000

Renovation and modernization of material-technical base in bl.3 and bl.1 by: 1.Izpalnenie of energy saving measures: Thermal isolation in bl.3 of: 10313,6 m2 exterior walls and 317,0 m2 floor bordering the outside air with thermal insulation product based on polyurethane; 266 m2 external walls with mineral wool, 3527,20 m2 roof slab of warm flat roof in sections B, C and D of bl.3-in insulation product based on extruded polystyrene (XPS); 2160 m2 attic plate of cold flat roof of Building A in-bl.3 with mineral wool. Replacement of 1346,4 m2 windows. 2.Vatreshen repair of 9 classrooms and two lecture halls in bldg. 3 and 4 lecture halls in bl.1: Plastering, priming and painting with latex paint on walls and ceilings 4030 m2, laying new flooring linoleum-1708 m2, repairing flooring (Schlei, grouting and polishing) -354 m2, etc. . ancillary works. 3. Establishment of local high with-me air conditioning in 4 lecture halls in bl.1 and two lecture halls in bl.3 each with a flow injection / suction-7000/6600 m3 / hour.

Electricity

„Топлофикация София“ ЕАД | Published February 10, 2017  -  Deadline March 13, 2017
cpvs
09310000

The subject of this contract is: "Supply of net active electric energy balance group coordinator for the needs of" District Heating Sofia "AD."

Projected quantities are specified in the developer.

The order should be implemented according to the requirements described in the documentation for procurement and technical specifications of the client.

"Supply of net active electric energy balance group coordinator for the needs of" District Heating Sofia "AD."

Estimated amounts and volume of the contract are specified in the documentation for tenders published on the buyer profile - www.zop.toplo.bg

,, MAKING construction supervision contract to OBJECT: "MEASURES TO IMPROVE ENERGY EFFICIENCY FOR UNWE GR. SOFIA, housing" A "," B "and" E ""

Университет за национално и световно стопанство (УНСС) | Published February 9, 2017  -  Deadline March 7, 2017
cpvs
71520000

The object of this contract is: ,, MAKING construction supervision contract to OBJECT: "MEASURES TO IMPROVE ENERGY EFFICIENCY FOR UNWE GR. SOFIA, housing" A "," B "and" E "" - ESM1 - thermal insulation of exterior walls, ESM2 - thermal insulation of roofs, ESM3 - thermal insulation of floors, ESM4 - Replacing old windows with a system of PVC profile and staklopaket.Zadalzheniya contractor 1. to prepare final reports to establish suitability for use of facilities and receipt of the permit / Certificate / for use of same; 2. To prepare and coordinate all acts and protocols under SPA and Ordinance № 3 / 31.07.2003. of Works, on drawing up acts and protocols during construction; 3. compile all the necessary documentation during the construction process - acts, records, tests and measurements, certificates of inputs, declarations of conformity, etc., And inform the Contracting Authority of missing documents as well ..

"Supply of net active electric energy balance group coordinator for the needs of" District Heating Sofia "AD"

Топлофикация София ЕАД | Published February 9, 2017  -  Deadline March 14, 2017
cpvs
09310000

The subject of this contract is: "Supply of net active electric energy balance group coordinator for the needs of" District Heating Sofia "AD." Projected quantities are specified in the technical specification of the Employer. The order should be implemented according to the requirements described in the documentation for procurement and technical specification of the Employer.

Delivery of energy WIRING low voltage and choice of a balance group coordinator for the needs of "Markets East" EAD

Пазари Изток ЕАД | Published March 13, 2017  -  Deadline April 4, 2017
cpvs
09310000

Edmetat of the contract is delivery of net electricity low voltage for individual market sites owned and managed by "Markets East" EAD, which are as follows: Administrative building "Markets East" EAD Market "Sitnyakovo" Marketplace "Slatina" , Market "Silver" Market "Roman wall" Market "Before bl.58" Market "approach TU" Market "Pavlovo" Market "Buxton" Market "Vihren" Market "Dragalevtsi" Market "Chickweed" , Hali "Musagenitsa".

Renovation for Energy Efficiency of Residential Buildings in the territory of Sofia Municipality area "Vazrzazhdane" in conjunction with "National Energy Efficiency Program

Столична община - район Възраждане | Published March 13, 2017  -  Deadline April 19, 2017
cpvs
45000000

Renovation for Energy Efficiency of Residential Buildings in the territory of Sofia Municipality area "Vazrzazhdane" in conjunction with "National Programme for Energy Efficiency of Residential Buildings", adopted by Decree № 18 / 02.02.2015g., On lots: 1 . Lot 1 - Perform construction activities building with administrative address: c. Sofia district "Renaissance" jk "Zone B-19" street. "Three ears" №107, 2. Lot 2 - Supervision of works during construction of the building with administrative address: c. Sofia district "Renaissance" jk "Zone B-19" street. "Three ears" №107 (in separate pozotsiya 1) 3. Lot 3 - Investment control during construction of the building with administrative address: c. Sofia district "Renaissance" g. k. "Zone B-19" street. "Three ears" №107 (in separate pozotsiya 1)

Choosing a contractor to perform work on upgrading the energy efficiency NPEEMZHS the territory of Sofia Municipality, "Triaditza" in lots

Столична община - район Триадица | Published March 13, 2017  -  Deadline April 19, 2017
cpvs
45000000

Execution of works, implementation of construction supervision and exercise of investment control in the implementation of the National Programme for Energy Efficiency of Residential buildings in the area Triaditca 3 multifamily buildings in nine lots. Through the contract will be carried out renovation of multifamily residential buildings to provide better living conditions for citizens in multifamily buildings, thermal comfort and higher quality of living environment. Details of the nature and volume of activities is presented in Section II. 2.4.) Of the notice.

"Renovation for Energy Efficiency of Residential Buildings in the territory of Sofia Municipality area" Hope "in conjunction with" National Energy Efficiency Program ... "

Столична община - район Надежда | Published March 14, 2017  -  Deadline April 18, 2017
cpvs
45000000

Lot №1: "Engineering (design and construction)" Building an administrative address gr. Sofia, rn "Hope" jk "Leo Tolstoy", bl. 61 "Lot №2:" Preparing conformity assessment of investment projects with the essential requirements for construction and construction supervision during the construction of "Building an administrative address gr. Sofia rn rn" Hope "g .k. "Leo Tolstoy", bl. 61 (at Lot 1) "Lot №3:" Investment control during the design and construction of "Building an administrative address gr. Sofia, rn" Hope "jk "Leo Tolstoy", bl. 61 (at Lot 1)

The subject of the contract is "Preparing Ordinance on the conditions and terms of preparation and verification reports of supplier of liquid fuels and energy from non-biological origin for transport and assessment of the impact of the draft Order '

Министерство на околната среда и водите /МОСВ/ | Published March 7, 2017  -  Deadline March 14, 2017
cpvs
90721200

The opening of tenders will be carried out under Art. 97, para. 3 PPZOP on 15/03/2017 at 10:00 pm at the premises of the Ministry in the city. Sofia, bul. "Maria Louisa" № 22. Employer provides a free, full electronic access to the call for collection of offers, together with the attached to her information, samples and a draft contract on the buyer profile at: www.moew.government.bg/pkf/view1view.php?showdetail=&id=207

Delivery, removal and installation of three-phase oil-filled power transformers lowering 110kV / Medium Voltage (MV) and all the necessary auxiliary equipment

ЧЕЗ Разпределение България АД | Published March 6, 2017  -  Deadline April 7, 2017
cpvs
31170000

Scope: a. construction of a new transformer 110kV / MV in factory b. the full test in the factory; c. rigging, transportation and installation of a new transformer 110 kV / MV on a temporary foundation in storage. Based on the Principal; d. dismantling of existing transformer 110 kV / MV in this energy facility; e. rigging, transportation and installation of disassembled transformer of permanent foundation in this energy site to a temporary base in the warehouse. Based on the Principal; f. rigging, transportation and installation of a new transformer 110 kV / MV foundation of a temporary to a permanent foundation in this energy project of the Employer; g. supply of auxiliary equipment h. full completion, attach electrical connections side 110 kV / MV and control circuit protection, alarm and monitoring system for gas analysis, etc; i. conduct full electrical measurements and tests j. conducting 72 hour tests under pressure and load k. training and commissioning.