Public tenders for energy in Sofia Bulgaria

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Preparation of a survey, technical passport and project for site: "Rehabilitation reception building Shumen station"

ДП Национална компания Железопътна инфрраструктура | Published July 16, 2018  -  Deadline August 22, 2018
cpvs
71310000

The main activities within the scope of the procurement are as follows: ACTIVITY I: Investigations and studies - compilation of the Results Report, preparation, coordination and registration of the Technical Passports for the building of the PZ, the external station toilet, pedestrian underpass, platforms and pedestrian coverage according to Regulation No 5 / 28.12.2006 on the technical passports of the constructions.For the IP of Shumen railway station there is an energy efficiency audit in the period 02.2009-04.2009. To carry out an additional check with a view to updating the measures. ACTIVITY II: Preparation of Technical project incl. parts specifications: Architectural, Constructional, Electrical, including: Silnikova and Slabotokova, Water Supply and Sewerage, Water Supply and Sewerage, EE, Geodesy, Park Development and Public Works, WB, WPO, WPD. Activities for coordination and approval of Technical project pursuant to the ZUT for issuance of Building Permit.

Preparation of an investment project for the project: "Renovation and modernization of holiday-house" Energo-2 "

Електроенергиен системен оператор ЕАД | Published June 21, 2018  -  Deadline August 20, 2018
cpvs
71323100

1. Preparation of an investment project for renovation and modernization of the buildings from the main development of the property envisaged for a resting place (service block with a classic restaurant, central hotel body and south wing), as well as the yard adjacent to the holiday station. The scope of the design work shall include at least the following design parts (minimum required design size): Part: Architectural; Part: Interior and Furnishings; Part: Constructive and constructive audit; Part: Water supply and sewerage; Part: Electrical - power, lighting, structural and earthing installations; Part: Electrical - external power supply; Part: Heating, Ventilation, Air Conditioning; Part: Energy Efficiency; Part: Park Development and Public Works; Part: Fire Alarm; Part: Fire Safety; Part: Safety and Health Plan; Part: Waste Management Plan; Part: Documentation. 2. Carrying out author's supervision during construction.

Diesel fuel delivery

Софийска вода АД | Published June 29, 2018  -  Deadline August 3, 2018
cpvs
09134200

The subject of the Diesel Supply contract is divided into the following lots: First Lot Item (OP 1) - Fuel Delivery for Diesel Engines with Biodiesel Content under the Renewable Energy Act. Second lot (OP 2) - Supply of diesel fuel for heating.

"Supply of medium and low voltage electric power and selection of a balancing group coordinator for the objects provided to the Bulgarian Metrology Institute"

Български институт по метрология | Published June 11, 2018  -  Deadline July 24, 2018
cpvs
09310000

Supply of net quantities of active electricity at medium and low voltage to the sites of the Bulgarian Institute of Metrology (BIM / Contracting Authority) and provision of services by acting as a coordinator of a standard balancing group under the Energy Act (EE), the Trading Rules with electricity (PTFE) and Electricity Measurement Rules (PIPE) and payment of all services used by the client as a final customer: "access to the electricity transmission and / or electricity distribution transmission of electricity through the transmission and / or distribution network and balancing responsibility, as well as settling the relations in connection with the payment of the amounts due for network services for the respective price period. The projected net active power consumption for 36 (thirty-six) months with the option provided is 3,720,000 kWh. , and without the option of 3,100,000 kWh.

Major overhaul / reconstruction of the "Faith, Hope, Love" Crisis Center

Столична община | Published June 21, 2018  -  Deadline July 24, 2018
cpvs
45000000

The scope of the public procurement includes activities in the following parts: Architecture; Constructive; Electro; Plumbing; HVAC; Fire alarm; Fire safety; Park building; Geodesy; Construction waste management plan; PSF; Energy efficiency. The object of the public procurement is with the following indicators: Built-up area - 505 sq.m .; Total built-up area - 1010 sq.m .; The property has an area of ​​3880 sq.m., of which the green areas are 1968 sq.m.

"Supply of active electricity high, medium and low voltage and inclusion in the balancing group of the objects of Sofiyska Voda AD"

Софийска вода АД | Published June 15, 2018  -  Deadline July 20, 2018
cpvs
09310000

Supply of active electricity high, medium and low voltage at freely negotiated prices according to the Energy Act and inclusion in the balancing group of the sites of Sofiyska Voda AD and coverage of their imbalances.

Insurance of property and employees of Bulgartransgaz EAD

Представляващият Булгартрансгаз ЕАД - изпълнителен директор | Published June 15, 2018  -  Deadline July 19, 2018
cpvs
66510000

Insurance of property and employees of Bulgartransgaz EAD (BTC) in 5 lots (OP): OP 1 General civil liability in connection with the licensing activities under the Energy Act, implemented by BTG: natural gas transmission, storage of GHG and in relation to professional liability as a builder and designer, OP 2 Goods-Stocks and BTG Assets: GG Insurance, incl. Buffer in: Chiren UGS, the national gas transmission network, transit network for transit transport and Insurance of buildings, machinery, equipment, off-balance sheet assets and materials, business equipment and computer equipment, costs of acquisition of tangible fixed assets, OP 3 Motor vehicles of BTC: Full Casco Insurance, Motor Vehicle Accident Insurance and Obligatory Motor Third Party Liability Insurance, OP 4 Occupational accident at BTC, OP5 BTG employees on business trips or trainings and specializations abroad.

"Investment design and exercising of author's supervision of the site:" Overhaul of the buildings in the Center for the Protection of the Environment in Pazardjik at the Academy of the Ministry of Interior "

Академия на МВР | Published June 19, 2018  -  Deadline July 12, 2018
cpvs
71220000

1. Preparation of an investment project: - Feasibility studies - Preparation of an investment project in conceptual, technical and detailed design phases (working drawings and details) for the implementation of the project in five stages; - Investigation of energy efficiency and certification - Implementation of the obligations of the CONTRACTOR as a Designer during the construction and commissioning of the site in accordance with the Bulgarian legislation in force Removal by the CONTRACTOR at his own expense of the shortcomings of the project established during the execution of the inspections carried out by the Contracting Authority and / or the Consultant, assessing the conformity of the project with the essential requirements for the construction works and the Technical Control under the "Constructive" part of the TDA, including even during construction. - Assume responsibility for the quality of the Project during the execution of the construction and during the warranty period. 2. Author's supervision;

Renovation for energy efficiency of a multifamily residential building on the territory of the Studentski district by NEMEMS - engineering (design and construction) for bl. 103, bc "Mladost 1", Sofia

Столична община - район Студентски | Published June 27, 2018  -  Deadline July 11, 2018
cpvs
45210000

The subject of this contract are renovation works for energy efficiency of multifamily residential buildings on the territory of Sofia Municipality in connection with the "National Energy Efficiency Program of Multifamily Residential Buildings" adopted by Decree № 18 / 02.02.2015. - engineering (design and construction) for a building with administrative address: bl. 103, bc "Mladost 1", Sofia, entered into service in 1979, consisting of 153 apartments, 18 (17 + technical floor) above ground floors. The total built-up area is 15660 sq.m.

Implementation of measures to increase the energy efficiency of municipal properties on the territory of the Serdika District Administration by lots.

Кметът на Столична община-район Сердика | Published June 5, 2018  -  Deadline July 9, 2018
cpvs
45260000

The activities subject to the contract include the implementation of energy efficiency measures and the execution of construction and civil engineering works on sites - municipal property in separate lots. The full description of the separate item is given in the Technical Specification - item 5.1, item 5.2 and item 5.3 of the approved documentation.

Preparation of an investment project for Kindergarten in UPI II - (for ODS) (ID with identifier 68134.4334.9449), square 109, m. Ovcha Kupel - 1 ", Ovcha Kupel district, Sofia - first stage"

СО-район Овча купел | Published June 6, 2018  -  Deadline July 3, 2018
cpvs
71320000

The execution of the contract includes: elaboration of an investment project in a working phase, which should contain the following parts: Part: Architectural; Part: Engineering geology and hydrogeology; Part: Constructive; Part: Electrotechnical, incl. External power supply; Part: Fire Alarm; Part: Water Supply and Sewerage; external S & T networks; Part: Heat Supply, Heating, Ventilation and Air Conditioning; Part: Energy efficiency and energy savings of the building; Part: Assessment of compliance with Art. 169, para 1, item 6 of the TDA; Part: Geodesic - Vertical Planning; Part: Park Development and Public Works; Part: Technological; Part: Safety and Health Plan; Part: Fire Safety; Part: Building Waste Management Plan; Part: Accounting documentation - Quantitative - value account for all parts of the project. The investment project should be coordinated with the operating enterprises and the institutions required by the laws and regulations.

"Selection of a contractor of the CEM for introducing measures for energy efficiency, modernization, repair and reconstruction of the site of Incineration and Plastic Surgery Clinic in UMBALS" N. I. Pirogov "EAD"

УМБАЛСМ Н.И. ПИРОГОВ ЕАД | Published June 8, 2018  -  Deadline July 2, 2018
cpvs
45400000

"Introduction of measures for energy efficiency, modernization, repair and reconstruction of the site of Incineration and Plastic Surgery Clinic in UMBALS" N. I. Pirogov "EAD"

"Subscription service of air conditioning and ventilation systems and machines" for "St. Ivan Rilski "EAD, Sofia

Университетска многопрофилна болница за активно лечение /УМБАЛ/ Свети Иван Рилски ЕАД - София | Published May 21, 2018  -  Deadline June 27, 2018
cpvs
50700000

The order includes one item "Subscription service for air conditioning and ventilation systems and machines" with 218 rows. Subscription service services include performing technical examinations, prophylaxis and diagnostics, checking the technical and operational capabilities of air conditioning and ventilation systems and machines, maintaining a dossier, and any emergency repairs, replacement of filters / defective parts / securing parts the safe, faultless and trouble-free operation of 183 items. climatic split with wall type, 2pcs. Air Split Split Column Type, 2 pcs. Climate Split Systems Channel Type, 26 pcs. Cassette / Ceiling / Type 3 cl. chiller, 5 pcs. climate cameras and1 pcs. energy saving block. The supply of spare parts / filters is not included in the subject of the order. Participants can bid for one or more rows. Ranking will be done for each row.

Supply of low-voltage electricity at freely negotiated prices for the needs of VFU "Luben Karavelov", by a balancing group coordinator.

Висше строително училище Любен Каравелов | Published May 11, 2018  -  Deadline June 19, 2018
cpvs
09310000

Supply of low-voltage electricity at freely negotiated prices for the needs of VFU "Luben Karavelov", by a balancing group coordinator. The projected quantity of electricity to be delivered over the term of the contract (12 months) is determined on the basis of the energy consumed in 2017 and previous years and amounts to 1 700 000 kWh of low voltage. Low voltage supply is provided for the following facilities: VFU "Luben Karavelov", Sofia 1373, 175 Suhodolska Street, with two measuring points described in the documentation.

Implementation of construction and assembly works for energy efficiency of SBALOZ EOOD

Специализирана болница за активно лечение на онкологични заболявания ЕООД гр. София | Published May 4, 2018  -  Deadline June 5, 2018
cpvs
45200000

The subject of the public procurement is the execution of construction and assembly activities, which will ensure the increase of the energy efficiency of the building of SBALOZ, Sofia. The Energy Efficiency Project was developed in line with the activities set out in an Energy Efficiency Report, which examines the current situation and recommends appropriate energy efficiency measures to achieve energy savings on the site.

"Reconstruct the heating. the instinct of all hulls and remake-res. works at the school. Corps A at 27th Secondary School / 27SU /, with a reconstruction of heating. instigation, according to art. the energy outline prepared in 2012. "

Столична община район Люлин | Published May 4, 2018  -  Deadline June 4, 2018
cpvs
45331100

Reconstruction of the heating installation of all hulls and repairing of the building A of 27 Secondary School / 27СУ / in connection with the reconstruction of the heating installation, according to the energy audit in 2012, in UPI II-for school, with identifier KK and KK 68134.4360.408, district 10, "Lyulin-6" m., Sofia, 4, Polkov Nikolay Popov Str., Ж.к. "Lyulin" - 6 m.

Implementation of measures to increase the energy efficiency of municipal properties on the territory of the Serdika District Administration by lots.

Кметът на Столична община-район Сердика | Published May 4, 2018  -  Deadline June 4, 2018
cpvs
45260000

The activities subject to the contract include the implementation of energy efficiency measures and the execution of construction and civil engineering works on sites - municipal property in separate lots. The full description of the separate item is given in the Technical Specification - item 5.1, item 5.2 and item 5.3 of the approved documentation.

BP 1004 / UK. - Enhancement of energy efficiency and repair on the third floor of the academic corpus of "G. S. Rakovski "

Военна академия Г. С. Раковски | Published April 23, 2018  -  Deadline May 31, 2018
cpvs
45400000

The activities related to the subject matter of the contract are the execution of construction and assembly works and repair works to be carried out on the construction site determined on the basis of the investment project approved by the Contracting Authority and the Technical Specification of the Types of Works and include the following main activities: repair of the roof and roof structure of the educational corpus of BA "G. Rakovski ". 2. Construction of a lightning protection installation. 3. Installation of suspended ceilings and replacement of existing lighting with energy-saving. 4. Replacement of existing external joinery on the façades of the building of the educational corpus of the " Rakovski ". 5. Internal repairs on the third floor of the building of the educational corpus of BA "GS". Rakovski ".

Renovation for energy efficiency of multifamily residential buildings on the territory of the Slatina District of Sofia, in connection with the "National Energy Efficiency Program of Multifamily Residential Buildings"

Столична община-район Слатина | Published April 16, 2018  -  Deadline May 30, 2018
cpvs
45211000

Renovation for energy efficiency of multifamily residential buildings on the territory of the Slatina District of Sofia, at the peak with "NEMES", by lot: Lot # 1 - Construction and assembly works of a building with admin. address: Sofia, Slatina district, "Hubavka" № 5; Separated item № 2-Carrying out of construction and assembly works of a building with adm. address: Sofia, "Slatina" district, zh.k. "Yavorov", bl.54, ent.A and ent. B, lot № 3-Exercise of construction supervision during construction of a building with adm. address: Sofia, "Hubavka" № 5 (under OP no. 1) Lot No 4 - Exercise of construction supervision during the construction of a building with adm. address: Sofia, Bulgaria "Yavorov", bl.54, entrance A and entrance B (under OP No 2), lot № 5 - Investor's control during the construction of a building with adm. address: 5 Hubavka Str., Sofia (under OP no. 1), lot № 6 - Investor's control during the construction of a building with admin. address: Sofia, "Yavorov" District, bl.54, entrance A and entrance B (under OP No.2).

Supply of Low and Medium Voltage Electricity and Choosing a Balancing Group Coordinator for the needs of NATFA Krustyo Sarafov

Национална академия за театрално и филмово изкуство /НАТФИЗ/ Кръстьо Сарафов | Published May 3, 2018  -  Deadline May 29, 2018
cpvs
09310000

The subject of the contract is the supply of electricity to the free market at freely negotiated prices according to Art. 100, Art. 101, Art. 102 and Art. 103 of the Energy Act and the Directive for the supply of the objects of NATFA, located in Sofia, 111, GS Rakovski Str. and Studentski Grad, block № 29. Selection of a contractor for the supply of net active electric energy, who is also the coordinator of a standard balancing group, for low and medium voltage, with full administration of the information flow with ESO and bearing the costs of imbalances for the objects of NATFA "Kr. Sarafov ". The forecast supply quantity for electricity over the term of the contract is 2 500 MWh.