Public tenders for energy in Sofia Bulgaria

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Works for complete or part construction and civil engineering work

„ЧЕЗ Разпределение България“ АД | Published March 21, 2017  -  Deadline April 20, 2017
cpvs
45200000

The subject of this contract is related to maintenance and repair of buildings and adjacent facilities rented or owned by the "CEZ Distribution Bulgaria" in the city. Sofia and Sofia region, Pernik, Kyustendil, Blagoevgrad, Pleven, Lovech, Vratsa Montana, Vidin.

"CEZ Distribution Bulgaria" held an open procedure for procurement Ref. № PPS 17-018 and subject: "Execution of construction works on the buildings and adjacent facilities rented or owned by the" CEZ Distribution Bulgaria "AD" in the city. Sofia and Sofia region, Pernik, Kyustendil, Blagoevgrad, Pleven, Lovech, Vratsa, Montana, Vidin.

The subject of this contract is related to maintenance and repair of buildings and adjacent installations. Given the wide variety of works and objects which may be awarded, the same can not be detailed in this notice. The main types of work which the contracting authority plans to be implemented referred to in the documentation sites, including, but not limited to are: brick and / or aerated concrete masonry, stucco, coverings, plaster and plastering, drywall, waterproofing, insulation , painting, replacement of windows, roofing and tinsmith works, installations - electrical and plumbing and more. A detailed description of the types of work is given in the bills of tender documentation. At this stage they can not identify their specific quantities

41 of the AP of EA as well as building units (rooms, facades, roofs and more. Items), representing site energy facilities having administrative, residential or other purposes unrelated to the distribution of electricity. Energy) in order to improve construction and structural condition of the buildings (parts of buildings) included therein and functional condition of the building systems, and hence working conditions and use for its intended purpose of these buildings, increasing their operational life and reliability.

All materials needed to perform the contract have an obligation to delivery of the selected contractor.

Training facilities building

Агенция „Митници“ | Published February 15, 2017  -  Deadline March 2, 2017
cpvs
45214800, 45311000, 45312100, 45320000, 45331000, 42512000, 45420000, 45421145, 45421146, 45430000, 45440000

Subject to the award of this contract is: "Reconstruction of an administrative building with ID 65677.1.88.4 in town. Svilengrad quarter." Petko Voyvoda "street." Asen Iliev "№ 4," Learning Centre ". With reconstruction activities are provided facilities for training of Agency "Customs" and places of their night. By creating a training center to satisfy the simultaneous achievement of the objectives of reducing funds for long-term mission of the Agency's staff and training them.

Reconstruction will be realized through the reorganization of existing premises and spaces, renovation of old flooring, tiling and plastering, implementation of measures to improve the energy efficiency of the building and building a system for central air conditioning of the building included the delivery of its constituent components (pipe network, end indoor and outdoor units, valves, air ducts, etc.).

Delivery of active power. Energy and choice of coordinator of standard balancing group for the sites own. of "BDZ-TP" LTD connected to elektrorazpred. networks of CEZ, EVN and Energo for a period 1d. "

БДЖ-Товарни превози ЕООД | Published February 16, 2017  -  Deadline March 13, 2017
cpvs
09310000

Public procurement: "Supply of active power and choice of coordinator of standard balancing group of objects owned by" BDZ - Freight services "connected to the distribution networks of CEZ, EVN and Energo for one year."

Renovation for Energy Efficiency of Residential Buildings in the territory of Sofia Municipality - district "Student" in six lots.

Столична община - район Студентски | Published February 16, 2017  -  Deadline March 16, 2017
cpvs
45210000

Renovation for Energy Efficiency of Residential Buildings in 6 lots: 1.Inzhenering (design and construction) "Building with Adm. address gr. Sofia, "Bug", bl. 21; 2.Inzhenering (design and construction) "Building with Adm. address Sofia, "Mladost 1" bl.103; 3.Izgotvyane conformity assessment of investment projects with the essential requirements for construction and construction supervision during the construction of "Building with Adm. address gr. Sofia jk "Bug" bl.21; 4.Izgotvyane conformity assessment of investment projects with the essential requirements for construction and construction supervision during the construction of "Building with Adm. address gr. Sofia jk "Mladost 1" bl.103; 5.Investitorski control during the design and construction of "Building with Adm. address Sofia, jk "Bug" bl.21; 6.Investitorski control during the design and construction of "Building with Adm. address gr. Sofia "Mladost 1" bl.103.

Construction / major renovation / reconstruction and implementation of measures to increase the energy efficiency of schools and kindergartens in Sofia Municipality, in 26 lots

Столична община | Published March 9, 2017  -  Deadline April 12, 2017
cpvs
45000000

Construction / major renovation / reconstruction and implementation of measures to increase the energy efficiency of schools and kindergartens in Sofia Municipality, in 26 lots. CMP must be met in accordance with the explanatory notes in all parts of objects investment projects (Appendix № 1) Bills of Quantities (Appendix № 2) and graphic materials (Appendix № 3) to this documentation. All building materials (products) that are used in the construction of stage performance must comply with Decree № RD-02-20-1 from 5 February 2015. the terms and conditions for use of construction products in the works of the Republic of Bulgaria.

Construction work

Столична община | Published March 9, 2017  -  Deadline April 11, 2017
cpvs
45000000

Construction / major renovation / reconstruction and implementation of measures to increase the energy efficiency of schools and kindergartens in Sofia Municipality, in 26 lots.

CMP must be met in accordance with the explanatory notes in all parts of objects investment projects (Appendix № 1) Bills of Quantities (Appendix № 2) and graphic materials (Appendix № 3) to this documentation.

All building materials (products) that are used in the construction of stage performance must comply with Decree № RD-02-20-1 from 5 February 2015. the terms and conditions for use of construction products in the works of the Republic of Bulgaria.

The subject of this contract is construction / major renovation / reconstruction and implementation of measures to increase the energy efficiency of schools and kindergartens in Sofia Municipality, in 26 lots.

CMP must be met in accordance with the explanatory notes in all parts of objects investment projects (Appendix № 1) Bills of Quantities (Appendix № 2) and graphic materials (Appendix № 3) to this documentation.

All building materials (products) that are used in the construction of stage performance must comply with Decree № RD-02-20-1 from 5 February 2015. the terms and conditions for use of construction products in the works of the Republic of Bulgaria.

Construction work

Столична община — район Възраждане | Published March 14, 2017  -  Deadline April 18, 2017
cpvs
45000000, 71500000, 71520000

Renovation for Energy Efficiency of Residential Buildings in the territory of Sofia Municipality area "Vazrzazhdane" in conjunction with "National Programme for Energy Efficiency of Residential Buildings", adopted by Decree № 18 / 02.02.2015 laying on lots:

1. Lot 1 - Perform construction activities building with administrative address: c. Sofia district "Renaissance" jk "Zone B-19" street. "Three ears" № 107.

2. Lot 2 - Supervision of works during construction of the building with administrative address: c. Sofia district "Renaissance" jk "Zone B-19" street. "Three ears" № 107 (for Lot 1).

3. Lot 3 - Investment control during construction of the building with administrative address: c. Sofia district "Renaissance" jk "Zone B-19" street. "Three ears" № 107 (for Lot 1).

Renovation for Energy Efficiency of Residential Buildings in the territory of Sofia Municipality area "Vazrzazhdane" in conjunction with "National Programme for Energy Efficiency of Residential Buildings", adopted by Decree № 18 / 02.02.2015 laying on lots:

1. Lot 1 - Perform construction activities building with administrative address: c. Sofia district "Renaissance" jk "Zone B-19" street. "Three ears" № 107.

2. Lot 2 - Supervision of works during construction of the building with administrative address: c. Sofia district "Renaissance" jk "Zone B-19" street. "Three ears" № 107 (for Lot 1).

3. Lot 3 - Investment control during construction of the building with administrative address: c. Sofia district "Renaissance" jk "Zone B-19" street. "Three ears" №107 (at Lot 1).

Construction work

Столична община — район Надежда | Published March 14, 2017  -  Deadline April 13, 2017
cpvs
45000000, 71315000, 71521000, 71247000

61 ".

61 (at Lot 1). "

61 (at Lot 1).

61. Work projects needs renovation should be drawn up under SPA, Decree № 4 of 2001 on the scope and content of investment projects and related secondary legislation in the relevant parts in relation to the eligible and selected for funding activities. Projects should be accompanied by detailed bills of quantities for the relevant parts. Works should be carried out to introduce energy efficiency measures - measures should be implemented in accordance with this documentation.

1 LSP (by issuing Permission to use / Certificate of commissioning).

Scrutiny of the design and construction process, incl. Control of quantity, quality and compliance of the performed construction works and construction products used in the project documentation and contracts for execution.

Major upgrade of heating and ventilation system by building a central heating installation of heat pump Water-Land DG 89 "Bright rainbow" sq. Hostile and Shelter for stray dogs in the quarter. Seslavtsi region "Kremikovtzi" a program BG 04 "energy efficiency and renewable energy."

Столична община - Район "Кремиковци" | Published March 10, 2017  -  Deadline March 27, 2017
cpvs
45300000

All documents and applications, including and Bill of Quantities are posted on the buyer profile. Participants must provide evidence of conditions which must be met together with all duly completed sample documents posted on the buyer profile. If the participant fails to even one of the enclosed samples or provides evidence of the conditions to be met, the offer of the same candidate will be considered and evaluated.

Roof-framing work

ДП „Национална компания „Железопътна инфраструктура“ | Published February 24, 2017
Winner
ДЗЗД Консорциум „Железопътни сгради“, ЕИК 176 426 060
cpvs
45261100

Subject of the contract is construction of a new administrative building to serve the activities of the Subregion electricity Kaspichan to Energy Sections Gorna Oryahovitsa. The new building will be located on the site of the existing three-storey building after its demolition.

The new single-storey building will be prefabricated type, situated on the site of the existing, maintaining warm relationship with the existing workshop and the existing basement. The workshop will be separated from the main building with joint.

The building will be with dimensions of 24.60 meters long and 12.60 meters wide. The built-up area will be equal to that of the existing - 310 m 2 .

The building will have administrative - service function garage jeep, storage of combustible materials and room accommodation with toilet and bathroom.

The subject of the order includes the following activities:

- Demolition of the existing three-storey building from level 0 up;

- Reconstruction of the workshop to form the joint between the new building and workshop;

- Repair workshop;

- Renovation of the basement;

- Repair hall located within the subregion;

- Demolition and reconstruction of pavements around the building.

Construction work

Столична община — район Красно село | Published February 17, 2017
Winner
„Динел СН“ ЕООД
cpvs
45000000, 71520000, 71521000, 71500000

Renovation for Energy Efficiency of Residential Buildings in the territory of Sofia Municipality area "Krasno Selo" in conjunction with "National Programme for Energy Efficiency of Residential Buildings", adopted by Decree № 18 / 02.02.2015, the more lots :

1. Lot № 1 - Construction activities for "building with administrative address city. Sofia, bul." Hristo Botev "№ 35.

2. Lot № 2 - Supervision of works during the construction of "Building an administrative address gr. Sofia, bul." Hristo Botev "№ 35 (in Lot 1).

3. Lot № 3 - Investment control during construction of "Building an administrative address gr. Sofia, bul." Hristo Botev "№ 35 (in Lot 1).

Construction activities for "building with administrative address city. Sofia, bul." Hristo Botev "№ 35.

Construction supervision during the construction of "Building an administrative address gr. Sofia, bul." Hristo Botev "№ 35.

Investment control during construction of "Building an administrative address gr. Sofia, bul." Hristo Botev "№ 35.

Construction work

Столична община — район Изгрев | Published February 21, 2017  -  Deadline March 20, 2017
cpvs
45000000, 45200000, 71200000, 71530000

The object of this order are activities upgrading the energy efficiency of multifamily buildings on the territory of Sofia Municipality in conjunction with "National Energy Efficiency Programme" in lots.

According to the documentation.

Petroleum products, fuel, electricity and other sources of energy

Министерство на икономиката по Рамково споразумуние на ЦОП | Published February 21, 2017
Winner
„Петрол“ АД
cpvs
09000000

Delivery of automotive fuel through cards for cashless payment needs of the Ministry of Economy Lot 1 with subject: "Supply of automotive fuel through cards for cashless payment" under the Framework Agreement № CPOR-48 / 30.12.2016, the award of a centralized procurement.

Delivery of automotive fuel through cards for cashless payment for the Ministry of Economy.

"INCREASE ENERGY EFFICIENCY 44th University" NEOFIT BOZVELI "MUNICIPALITY -" Poduyane "

Столична община - район Подуяне | Published February 21, 2017  -  Deadline March 23, 2017
cpvs
45000000

Increasing the energy efficiency of 44 University "Neophyte Bozveli" Metropolitan Municipality - "Poduyane" includes the following works: 1. Thermal insulation of exterior walls; 2. Replacement of windows; 3. Thermal insulation of the roof; 4. Thermal insulation of floors; 5. Repair of internal heating; 6. Repair of electrical installation.

Insurance of property and responsibility of "Bulgargaz" EAD in three lots

Булгаргаз ЕАД | Published February 17, 2017  -  Deadline March 13, 2017
cpvs
66510000

By lot № 1 - insurance "liability" in connection with the activities performed by "Bulgargaz" EAD licensing activities under the Energy Act - public supply of natural gas. By lot № 2 - Insurance of inventories (natural gas) in Chiren underground gas storage and gas transit transmission system on the territory of Romania. By lot № 3 - Insurance of property, plant and equipment; Off-balance sheet assets and materials; of fixtures and fittings and computer equipment owned by "Bulgargaz" EAD.

Training facilities building

Агенция „Митници“ | Published March 7, 2017  -  Deadline March 9, 2017
cpvs
45214800, 45311000, 45312100, 45320000, 45331000, 42512000, 45420000, 45421145, 45421146, 45430000, 45440000

Subject to the award of this contract is: "Reconstruction of an administrative building with ID 65677.1.88.4 in town. Svilengrad quarter." Petko Voyvoda "street." Asen Iliev "№ 4," Learning Centre ". With reconstruction activities are provided facilities for training of Agency "Customs" and places of their night. By creating a training center to satisfy the simultaneous achievement of the objectives of reducing funds for long-term mission of the Agency's staff and training them.

Reconstruction will be realized through the reorganization of existing premises and spaces, renovation of old flooring, tiling and plastering, implementation of measures to improve the energy efficiency of the building and building a system for central air conditioning of the building included the supply of aggregate and components (pipe network, end indoor and outdoor units, valves, air ducts, etc.).

Electricity

„Пета МБАЛ — София“ ЕАД | Published March 3, 2017
cpvs
09310000

The subject of the contract is delivery of net active electric power and the choice of a balance group coordinator in a liberalized market needs "Fifth Hospital - Sofia" AD.

The Contractor shall provide the sponsor balancing and forecasting of consumption, administering hour schedules and information exchange.

The scope of the contract includes delivery of a net amount of electrical energy and coordination of balancing group of building "Fifth Hospital - Sofia" AD, c. Sofia, bul. "Nikolay G. Stoletov" № 3 67A- measuring points.

The subject of the contract is delivery of net active electric power and the choice of a balance group coordinator in a liberalized market needs "Fifth Hospital - Sofia" AD. The Contractor shall provide the sponsor balancing and forecasting of consumption, administering hour schedules and information exchange. The scope of the contract includes delivery of a net amount of electrical energy and coordination of balancing group of building "Fifth Hospital - Sofia" AD, c. Sofia, bul. "Nikolay G. Stoletov" № 3 67A- measuring points. Requirements for performance of the contract. Upon execution of the contract the contractor is obliged: -to delivered to sponsor the necessary quantities of electricity, in compliance with the Energy Act, rules for electricity trading (PTEE) The rules for measuring the quantity of electricity (Pique) and all applicable regulations; -to the supply of energy.

Programming services of packaged software products

Министерство на енергетиката | Published March 4, 2017
cpvs
72210000, 79400000, 79410000, 71354000, 30000000, 48000000, 60400000, 09310000, 39000000, 45000000, 30231300, 30213300, 30213100, 30232110, 30232150, 30216110

The contract aims to develop software for entering, storing and processing in dialog mode data collected by energy companies.

The order aims drafting of the National Plan for Energy and Climate Change to 2030 within the EU governance.

Drafting of the National Plan for Energy and Climate Change to 2030 in the framework of governance and the EU.

The contract aims to develop finance-economic and production analysis concession "Chelopech" to achieve a balance from amongst the benefits and risks for the state and the concessionaire.

Development of finance and economic analysis and production concession "Chelopech" to achieve a balance from amongst the benefits and risks for the state and the concessionaire.

The contract aims to select a contractor for the conclusion of a Framework Agreement for the identification and analysis of the contents of useful components, bulk density, moisture, etc., As well as performing mine surveying measurements in 2 lots.

Identification and analysis of the contents of useful components, bulk density, moisture, etc .; the assessment of holder / concessionaire methodology of sampling, analysis and control, etc .; Processing the results of control measurements, preparation of relevant graphic materials, analyzes and proposals and others.

Performing mine surveying measurements: determination of the actual state of mine workings and engineering infrastructure (roads, landfills, rolled, etc.); mutual position of the contour of the area for prospecting and / or exploration of the deposit, concession area and mine workings; volumes harvested and mined minerals; Processing the results of control measurements, preparation of relevant graphic materials, comparative analyzes, proposals and others.

Choosing a contractor for concluding the Framework Agreement: 1. concession for metallic minerals; 2. concession for non-metallic minerals - industrial minerals; 3. to provide con ...

"Execution of works on implementation of energy efficiency measures for the needs of the prison Vratsa and Lovech prison" in two lots

ДП ФОНД ЗАТВОРНО ДЕЛО | Published February 27, 2017  -  Deadline March 29, 2017
cpvs
45000000

"Execution of works on implementation of energy efficiency measures for the needs of the prison Vratsa and Lovech prison" in two lots: Lot 1. "Performing works on the implementation of energy efficiency measures for the needs of the prison Vratsa" Lot 2. "Performing works on the implementation of energy efficiency measures for the needs of the prison Lovech"

Insurance services

Държавна агенция „Държавен резерв и военновременни запаси“ | Published March 1, 2017
Winner
ЗАД „Булстрад Виена Иншурънс Груп“
cpvs
66510000

"Insurance fuels representing emergency stocks owned by the State Agency" State Reserve and War-time Stocks "according to Art. 30 of the "Law for stocks of oil and oil products." The implementation of the order is carried out according to the location of tanks, owned by YES DRVVZ according to Technical Specification - Application № 2 of the documentation for the procurement. The implementation period of the contract is four years the date of conclusion of the Framework Agreement. minimum requirements for covered risks: According to Art. 30 para. 2 of the stocks of oil and petroleum products stocks of fuel are insured at least against risks under section II, point a, point. 8 and 9 of Annex № 1 to the insurance Code, namely: "fire and natural disasters": Any damage to or loss of property as a result of: - fire - explosion - storm - natural forces other than storm; - nuclear energy - land subsidence. "Other damage of property": Any damage to or loss of property due to hail or frost or any other event such as theft, according to pt. 9 of Annex № 1 to the insurance Code .