Call +44 800 9755 164

Public tenders for energy in Sofia Bulgaria

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Introduction of energy efficiency measures in multifamily buildings in CO-region "Vitosha" in conjunction with "National Program for Energy Efficiency of Residential Buildings

Столична община - район Витоша | Published April 3, 2017  -  Deadline May 9, 2017
cpvs
45000000

Introduction of energy efficiency measures in multifamily buildings in CO-region "Vitosha" in conjunction with "National Program for Energy Efficiency of Residential Buildings" adopted by Decree № 18 of 02.02.2015, on the lots: 1. Lot №1- Engineering (design and construction) "building an administrative address gr. Sofia 1618, jk Buxton Street. "Gen.Suvorov" № 28a bl. 41. 2. Lot №2 - Production conformity assessment of investment projects with the essential requirements for construction and construction supervision during the construction of "Building an administrative address gr. Sofia 1618, jk Buxton Street. "Gen.Suvorov" № 28a bl. 41. (a lot 1). 3. Lot № 3 -Investitorski control during design and construction of "Building an administrative address gr. Sofia 1618, jk Buxton Street. "Gen.Suvorov" № 28a bl. 41. (a lot 1).

Evaluation resp. to invest. projects with substantial. works requirements exercising. , building. Supervision of energy. objects geode. capture and preparation of theirs. passport acc. chl.176a of TDA

ЧЕЗ Разпределение България АД | Published March 20, 2017  -  Deadline April 24, 2017
cpvs
71500000

Conformity assessment of investment projects with the essential requirements for building works, construction supervision of energy projects, surveying and preparation of technical passport, according to Art. 176a of the SPA on the territory served by the "CEZ Distribution Bulgaria", Ref. № RRS 17-022. The subject of the contract is divided into two lots, as follows: 1. Conformity assessment of investment projects with the essential requirements for building works, construction supervision of energy projects, surveying and preparation of technical passport, according to Art. 176a of the SPA within the Region "Pleven". 2. Conformity assessment of investment projects with the essential requirements for building works, construction supervision of energy projects, surveying and preparation of technical passport, according to Art. 176a of the SPA in the region "Montana - Vidin." Continues in Section VI.3) Additional information.

Concluding a framework agreement with the subject: "Selection of electricity supplier and balance group coordinator for the needs of" BDZ Passenger Services' office for three years. "

БДЖ-Пътнически превози ЕООД | Published April 3, 2017  -  Deadline May 4, 2017
cpvs
09310000

Concluding a framework agreement with the subject: "Selection of electricity supplier and balance group coordinator for the needs of" BDZ Passenger Services' office for three years. " I-st year period, electricity - 163 182 MWh ± 25%; II-nd year period -SWITCH energy - 163 182 MWh ± 25%; III-rd year period -SWITCH energy - 163 182 MWh ± 25%;

Electricity

ДП „Национална компания „Железопътна инфраструктура“ | Published April 14, 2017  -  Deadline May 25, 2017
cpvs
09310000

Choice of electricity supplier and balance group coordinator for the sites of SE "NRIC" for the period 2017/2018, the according to the Energy / Energy Act / rules for electricity trading / PTEE / and Public Procurement Act / PPL / for a period of 12 / twelve / consecutive months of estimated quantity of 51 824 (fifty-one thousand eight hundred twenty-four) MWh of electricity and performing duties of coordinator of balancing group 926 / nine hundred twenty-six / number of sites owned of SE "NRIC" on Peace in the Republic of Bulgaria.

Choice of electricity supplier and balance group coordinator for the sites of SE "NRIC", including:

Delivery for 12 / twelve / consecutive months of estimated quantity of 51 824 (fifty-one thousand eight hundred twenty-four) MWh of electricity and performing duties of coordinator of balancing Group 926 / nine hundred twenty-six / number of sites owned by DP "NRIC" in the territory of the Republic of Bulgaria, according to the attached Technical specification / Application № 1 documentation / developer to include such indirect member in its standard balancing group without sponsor to pay k quits any charges. During the performance, the contracting authority may perform an update / add - subtract objects or modify the electrical quantities. Energy / the number of objects of technical specifications and quantities of electricity.

"Complete overhaul of building a second RSPBZN-town. Varna "

Дирекция Управление на собствеността и социални дейности - Министерство на вътрешните работи | Published March 16, 2017  -  Deadline April 24, 2017
cpvs
45000000

For construction works in accordance with the investment business project "Reconstruction of the existing building on the second RSPBZN Varna" in part as follows: architectural; -Konstruktivna And construction expertise; -Buildings Plumbing systems; -Ploshtadkovi Plumbing systems; -Elektro; -OVK; -Fire safety; -Geodeziya (Landscaping); -Energy efficiency; Safety and health plan alone.

Introducing measures to increase energy efficiency in the building of the Sofia Mathematics High School "Paisiy Hilendarski" street. "Iskar" № 61 rn "Oborishte"

Столична община | Published April 10, 2017  -  Deadline May 15, 2017
cpvs
45000000

Construction works, which will be implemented in the building of the Sofia Mathematics High School "Paisiy Hilendarski" SMG are:? Thermal insulation of exterior walls; ? Thermal insulation of the roof; ? Heat isolation under; ? Repair of electrical installation; ? Replacing heaters. according to quantity takeoff, technical requirements under Explanatory notes Appendix №1 and technical characteristics of the basic materials, according to Appendix №2, an integral part of documentation.

"Supply of net electricity generation and selection of a balance group coordinator for the needs of IPAZR" Nikola Pushkarov

Институт по почвознание, агротехнологии и защита на растенията Никола Пушкаров | Published April 7, 2017  -  Deadline May 4, 2017
cpvs
09000000

"Supply of net electricity generation and selection of a balance group coordinator for the needs of IPAZR" Nikola Pushkarov. "The contractor shall perform the supply (sale) in order, as provided for in the Energy Act (EA) and other regulations. As to "balance group coordinator" The contractor should take responsibility for balancing include Principal in the balancing energy market as a participant (indirect member) standard balancing group coordinated by the Contractor without assigned la to pay the fee and to provide forecasting consumption Employer, including administration of hourly schedules for consumption Employer Total estimated amount for the supply of net active electric power for the duration of the contract is: - Medium voltage 1.7 million MWh. - Low voltage 140 000 MWh

Construction work

Столична община | Published March 28, 2017  -  Deadline May 2, 2017
cpvs
45000000

Construction / major renovation / reconstruction and implementation of measures to increase the energy efficiency of schools and kindergartens in Sofia Municipality, in 26 lots.

CMP must be met in accordance with the explanatory notes in all parts of objects investment projects (Appendix № 1) Bills of Quantities (Appendix № 2) and graphic materials (Appendix № 3) to this documentation.

All building materials (products) that are used in the construction of stage performance must comply with Decree № RD-02-20-1 from 5 February 2015. the terms and conditions for use of construction products in the works of the Republic of Bulgaria.

Delivery of net electricity low voltage and choice of a balance group coordinator for the office building at address: c. Sofia, ul. "Aksakov" №29, provided management TD

Национална агенция за приходите | Published April 21, 2017  -  Deadline May 25, 2017
cpvs
09310000

The selected contractor electricity supplier and balance group coordinator should ensure the implementation of these activities subject to this tender: 1. Delivery of necessary quantities of net electricity; 2. Predicting the consumption of electricity. Energy for building, planning and negotiation of specific quantities, ordering and balancing. 3. Preparation and application of the hourly daily schedules and sending them to administer the flow of information from the electric power system operator / ESO /; 4. Responsibility balancing electricity - the obligation to financially settle the differences between the amount of electricity registration schedule / forecast for consumption and actually reported by the commercial metering devices, or the difference between purchases and sales for a period of settlement. All costs of balancing shall be borne by the successful tenderer.

Electricity meters

„ЧЕЗ Разпределение България“ АД | Published April 14, 2017  -  Deadline May 18, 2017
cpvs
38554000

"Open" on the type of procedure for procurement purposes contract for a period of 2 (two) years for supply and installation of necessary equipment and specialized software (also called central system or software), dismantling of existing meters and clock switches construction, installation, commissioning and maintenance of automated systems for remote reading of electricity consumption. energy system (remote meter reading). The subject of the contract is not divided into lots.

"Open" on the type of procedure for procurement purposes contract for a period of 2 (two) years for supply and installation of necessary equipment and specialized software (also called central system or software), dismantling of existing meters and clock switches construction, installation, commissioning and maintenance of automated systems for remote reading of electricity consumption. energy system (remote meter reading). The subject of the contract is not divided into lots.

The subject of the contract shall include at least the following activities:

- Supply and installation of equipment including filters; data concentrators; single and three phase electricity meters for direct connection to the PLC module; Three-phase electricity meters for indirect connection to the PLC module; single and three phase meters with GPRS module and relay for load management; three-phase electricity meters for indirect connection to GPRS module.

- Removal of existing meters and clock switches.

- Unlimited scope, content and time of use rights (licenses) on specialized software for reporting and managing electricity.

- installation, configuration, testing and commissioning of specialized software for remote reading.

- Training of the contracting authority.

- Four-year warranty on equipment maintenance and specialized soft ...

Construction work

СО, район Връбница | Published April 14, 2017  -  Deadline May 16, 2017
cpvs
45000000, 45320000, 45442000, 45261400, 71000000, 71310000, 71521000, 71530000

Upgrading energy efficiency in multifamily buildings on the territory of Sofia Municipality area "Palm Sunday" in conjunction with "National Program for Energy Efficiency of Residential Buildings" adopted by Decree № 18 / 02.02.2015, on the lots:

233 ent. B-D.

233 ent. B-D (in lot 1).

233 ent. B-D (in lot 1).

233 ent. In-G put into operation in 1981, consisting of 85 apartments, 8 storeys, the total floor area is 4870 m2

148 TDA.

6 of the TDA.

1 of the TDA:

- Lawful commencement of construction;

- Completeness and correct compilation of acts and protocols during construction;

- Execution of works according to the approved investment projects and performance requirements of the building, according to the regulations and technical specifications for fire safety, environmental protection during construction;

- Compliance with health and safety in construction;

- the quality of used building materials and products and their compliance with safety standards;

- Non-injury to third parties and property due to construction;

- The evaluation of the accessibility of the building by persons with disabilities;

- Suitability of building commissioning;

- Control of the preliminary timetable for implementing the CMP.

Exercising control activities in performing design and construction:

Scrutiny of the design and construction process, incl. Control of quantity, quality and relevance of the performed construction works and construction products used in the project documentation and implementing agreements;

Signing of Protocol for the adoption of technical / detailed design, transmission protocol on the construction site; protocol to establish suitability for use of the site; and protocols for receiving the completed quantities and types of construction work to complete implementation of the policy on renovation of the building.

Note: Throughout the documentation, which used specific standard, type, specification, technical assessment, technical approval or technical reference should be given and equivalent thereof.

Electricity

Национална агенция за приходите | Published April 21, 2017  -  Deadline May 23, 2017
cpvs
09310000

The selected contractor electricity supplier and balance group coordinator should ensure the implementation of these activities subject to this procurement:

1. Delivery of necessary quantities of net electricity;

2. Predicting the consumption of electricity. Energy for building, planning and negotiation of specific quantities, ordering and balancing;

3. Preparation and application of the hourly daily schedules and sending them to administer the flow of information from the electric power system operator / ESO /;

4. Responsibility balancing electricity - the obligation to financially settle the differences between the amount of electricity registration schedule / forecast for consumption and actually reported by the commercial metering devices, or the difference between purchases and sales for a period of settlement.

All costs of balancing shall be borne by the successful tenderer.

The selected contractor electricity supplier and balance group coordinator should ensure the implementation of these activities subject to this procurement:

1. Delivery of necessary quantities of net electricity;

2. Predicting the consumption of electricity. Energy for building, planning and negotiation of specific quantities, ordering and balancing;

3. Preparation and application of the hourly daily schedules and sending them to administer the flow of information from the electric power system operator / ESO /;

4. Responsibility balancing electricity - the obligation to financially settle the differences between the amount of electricity registration schedule / forecast for consumption and actually reported by the commercial metering devices, or the difference between purchases and sales for a period of settlement.

All costs of balancing shall be borne by the successful tenderer.

The estimated net amount of electricity, defined in terms of k ...

Construction work

Столична община | Published April 12, 2017  -  Deadline May 12, 2017
cpvs
45000000

Construction works, which will be implemented in the building of the Sofia Mathematics High School "Paisiy Hilendarski" SMG are:

Thermal insulation of exterior walls;

Thermal insulation of the roof;

Thermal isolation of the floor;

Repair of electrical wiring;

Replacement of radiators.

Under quantitative accounts, technical requirements under Explanatory note Annex № 1 and technical characteristics of the basic materials in accordance with Annex № 2, an integral part of documentation.

"Introducing measures to increase energy efficiency in the building of the Sofia Mathematics High School" Paisiy Hilendarski "street." Iskar "№ 61 rn" Oborishte "(with area of ​​8860 sq. M).

Thermal insulation of exterior walls;

Thermal insulation of the roof;

Thermal isolation of the floor;

Repair of electrical wiring;

Replacement of radiators.

Under quantitative accounts, technical requirements under Explanatory note Annex № 1 and technical characteristics of the basic materials in accordance with Annex № 2, an integral part of documentation.

"Buildings sixth RSPBZN, Sofia - stage"

Дирекция Управление на собствеността и социални дейности - Министерство на вътрешните работи | Published March 16, 2017  -  Deadline April 24, 2017
cpvs
45216000

For construction works in accordance with the investment business project "Construction of the building of the sixth RSPBZN, Sofia - I stage", in part, as follows: 1.Chast "Architecture"; 2.Chast "Architectural details"; 3.Some "Construction"; 4. Part "Plan for Safety and Health"; 5.Chast "Electro" 6.Chast "El-fire"; 7.Chast "El-surveillance"; 8.Chast "VK" 9.Chast "BK" - Platform installations; 10.Chast "HVAC"; 11.Chast "HVAC - gas"; 12.Chast "HVAC - Suppl. Development boiler installation "; 13.Chast "Energy Efficiency"; 14.Chast "Park management"; 15.Chast "Fire Safety"; 16.Inzhenerno geological report; 17.Chast "PUSO" 18.Chast "Road"; 19.Situatsiya and landscaping - I stage.

Office supplies

Агенция „Митници“ | Published April 22, 2017  -  Deadline May 25, 2017
cpvs
30192000, 30197220, 22813000, 22814000, 22852000, 22852100, 30199500, 22817000, 30197643, 30197210, 30197300, 30199600, 22850000, 22851000, 22830000, 22130000, 30199110, 30199230, 30192100, 30192132, 30192131, 30192130, 30192160, 30192350, 30192152, 30192133, 30192113, 30192121, 30192123, 30192122, 30192111, 30234300, 30234400, 30197321, 30140000, 30191130, 24910000, 39292500, 39241100, 39241200, 30193000, 30197330, 30199760, 30197320, 30197100, 30199410, 30234600, 22810000

80, para 1 of PPZOP. OP № 2 "Supply of stationery and office supplies," which includes - stationery and office supplies referred to a specific type, parameters and estimated quantities in Table № 2 of Section II. "Technical specifications" of public procurement documentation.

1 of the PPA, in view of what OP № 1 is designed for assigning specialized enterprises or cooperatives of disabled persons or entities whose main objective is the social and professional integration of disabled or disadvantaged people. In the procurement OP № 1 may participate persons who are registered as specialized enterprises or cooperatives of people with disabilities at least three years prior to the initiation of the procedure for awarding the contract and provided that at least 30 percent of their listed members of people with disabilities or those from disadvantaged backgrounds. Specialized enterprises or cooperatives of people with disabilities can participate in a public contract, provided that they fulfill at least 80% of its object its own plant and human resources. To implement this condition they may use subcontractors or rely on the capacity of third parties if subcontractors or third parties are specialized enterprises or cooperatives of people with disabilities.

In determining the own resource into account all the costs of raw materials, energy, fuel, water, licenses and the like, although their suppliers are not specialized enterprises or cooperatives of people with disabilities.

Has not met its own production or resource when specialized enterprises or cooperatives of people with disabilities available to the developer without significant additional processing products supplied by others. cont. in the field II.2.14).

  • 1