Call +44 800 9755 164

Public tenders for energy in Plovdiv Bulgaria

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

EBRD - Energy Efficiency Improvements in Public Buildings in Plovdiv Municipality

Municipality of Plovdiv | Published April 24, 2015
cpvs

EBRD - Energy Efficiency Improvements in Public Buildings in Plovdiv Municipality

Delivery of fully electronic chetiriprovodnikov three phase meter for measurement of active energy in 2 directions with load profile and recognition of manipulation.

„ЕВН България Електроразпределение“ EАД | Published December 16, 2015
cpvs
38554000

Delivery of fully electronic chetiriprovodnikov three phase meter for measurement of active energy in two directions with load profile and recognition of manipulations

Delivery of fully electronic chetiriprovodnikov three phase meter for measuring active and reactive energy (4-quadrant meter, QI, QII, QIII, QIV) with load profile.

„ЕВН България Електроразпределение“ EАД | Published December 16, 2015
cpvs
38554000

Delivery of fully electronic chetiriprovodnikov three phase meter for measuring active and reactive energy (4-quadrant meter, QI, QII, QIII, QIV) with load profile

"Carrying out works to improve energy efficiency" Plovdiv Language School "project, funded by the National Trust EcoFund / NTEF /"

Община Пловдив | Published January 27, 2017  -  Deadline March 2, 2017
cpvs
45000000

"Carrying out works to improve energy efficiency" Plovdiv Language School "project, funded by the National Trust EcoFund / NTEF /". Improving energy efficiency include: Thermal insulation of exterior walls, replacement of windows, insulation of the roof insulation of the floor - bay, replacement of the heating system, setting temperature drop and installation of solar collectors to provide hot water for domestic use. The total amount and volume according to the CSO and technical specifications integral part of the documentation for participation.

"Reporting on energy efficiency audit of existing Kindergarten and Nursery of the Municipality of Plovdiv".

Община Пловдив | Published February 23, 2016  -  Deadline March 29, 2016
cpvs
71251000, 71620000, 71631300, 71630000

The subject of the contract is related to activities reporting on energy efficiency audits of buildings, located in the Municipality of Plovdiv. Operate the service will be made under: 1. Decree № E-RD-04-1 of 22.01.2016g., Which will enter into force 30 days after its publication in the "Official Gazette" and repealing Decree №16 -1594 from 2013

2.Naredba № E-RD-04-2 from 01.22.2016 on, which will enter into force 30 days after its publication in the "Official Gazette" and repealing Decree № RD-16-1058 2009

Bidders must be registered in the public register of the Agency for sustainable energy development, according to Art. 44, para. 1 and to satisfy the specifications of Art. 43, para. 1 of the EEA; The purpose of the audit is to achieve energy savings in buildings. Performance of the contract is to be implemented in accordance with the technical specifications of the contracting entity, must comply with legal and regulatory rules in force in the Republic of Bulgaria. The activities covered by the contract will be performed on a total of 9 (nine) site, located in the municipality. The objects are as follows:

1. Kindergarten "The Little Prince" street. "Leonardo da Vinci" № 47;

2. kindergarten "Birch" street. "Stefan and Obreyko Obreykovi" № 21;

3. Kindergarten "Sugar cock" street. "Peter Shilev" № 1 - area;

4. day care "Winnie the Pooh", bul. "Dunav" № 69;

5. day care "Clementine" street. "Dimitar Talev" № 2a;

6. day care "Veselushko" Boulevard. "East" № 18;

7. day care "Poslushko" street. "Vratsata" № 24;

8. day care "Sunny Paradise" jk Thrace Street. "Tsar Svetoslav Terter" № 5;

9. day care "dream" street. "Bogomil" № 6.

The subject of the contract is "Selection of contractors to perform services related to improving the energy efficiency of existing multi-family residential buildings in the municipality of Plovdiv, financed by the National Programme for Energy Efficiency of Residential Buildings in 2 lots, as follows: Lot № 1 "Selection of contractors for manufacturing audits to establish the technical characteristics related to the requirements of Art. 169 par. 1 pt. (1-5) and par. 2 of TDA and technical passport, preparation of energy efficiency testing and prescription needed ESM in accordance with the statutory requirements for energy efficiency under the Energy Efficiency Act and the regulations for its implementation "; Lot № 2 "Selection of contractors to carry out conformity assessment of investment projects, construction supervision and investment control, including control of the quantity, quality and compliance of the performed construction works and used materials with contracts of works" .

Община Пловдив | Published February 25, 2016
Winner
„Микс Инженер Консулт Пловдив“ ООД
cpvs
71200000, 71251000, 71312000, 71620000

Under this contract will be awarded following activities: Reports investigation to establish the technical specifications and technical passports, reporting on the energy audit on these types of buildings that meet the eligibility requirements under the national program: Multi-family residential buildings constructed in industrial process: EPZHS (pre-fabricated housing); PPP (lift slabs); EPK (large shuttering) with a minimum of 36 independent sites to residential use.

"Supervision of works in carrying out works to improve the energy efficiency of" Language School Plovdiv "project, funded by the National Trust EcoFund / NTEF /"

Община Пловдив | Published January 30, 2017  -  Deadline February 21, 2017
cpvs
71521000

The object of this contract is to perform consultancy and construction supervision during construction in accordance with Article 168 of the SPA to increase the energy efficiency of "Language School Plovdiv" project, funded by the National Trust EcoFund / NTEF /, including control quantity and quality of construction products used for compliance with the technical specifications for the implementation of works, overall coordination of the construction process, preparation of the final report under Article 168, paragraph 6 of LSP, preparation of technical passports under Decree № 5 from 28.12 .2006g. and chl.176a and 176b of the SPA and the introduction of objects into operation.

Electricity

Община Пловдив | Published August 4, 2016  -  Deadline September 8, 2016
cpvs

Electrical energy

Electricity

„ЕВН България Електроразпределение“ ЕАД | Published August 4, 2016
Winner
Обединение „Филкаб - Инженеринг“
cpvs

Electrical energy

Delivery of fully electronic chetiriprovodnikov three phase meter for measuring active and reactive energy (4-quadrant meter) with load profile.

„ЕВН България Електроразпределение“ EАД | Published November 4, 2015
cpvs
38554000

Доставка на напълно електронен четирипроводников трифазен електромер за измерване на активна и реактивна енергия (4-квадрантен електромер) с товаров профил

Electricity meters

„ЕВН България Електроразпределение“ EАД | Published September 14, 2016
Winner
„Фродексим Трейд“ ООД
cpvs
38554000

Delivery of fully electronic chetiriprovodnikov three phase meter for measuring active and reactive energy (4-quadrant meter) with a load profile in a qualification system № C - 15 - NM - D - 147 with subject: "Delivery of fully electronic chetiriprovodnikov three-phase energy meter measurement of active and reactive energy (4-quadrant meter) with load profile "open file with № 00143-2015-0026.

Electricity meters

„ЕВН България Електроразпределение“ ЕАД | Published November 8, 2016
cpvs
38554000

Delivery of fully electronic chetiriprovodnikov three phase meter for measuring active and reactive energy (4-quadrant meter) with load profile.

Construction work

Община Пловдив | Published March 15, 2017  -  Deadline April 19, 2017
cpvs
45000000, 71320000

The selected contractor will carry out detailed design will comply with the relevant construction works and activities commissioning of the site and will perform supervision, as required by the contracting authority and terms of the contract.

Residential building in Plovdiv., Area "North" street. "Victory" № 62, № 64, № 66, № 68, № 70, № 72.

Category construction: construction is III-rd category:

Area: 1410 m 2 .

Area - total (surface and underground): 12 630.09 meters 2 .

The building is in EPZHS system consists of 3 sections. Each section combines two residential entrances and consists of a basement and 8 floors. With energy audit are prescribed these energy saving measures: Replacement of windows; Thermal insulation of external walls of the building with thermal insulation system based on expanded polystyrene - EPS 0,100 m; Thermal insulation of the roof structure of the building with thermal insulation system based on extruded polystyrene insulation XPS 0,100 m; Thermal insulation of overhead walls of a heated basement replacement of basement windows; Replacing the staircase lighting and automation of management.

3 point 2 - residential building construction is the third category.

Built-up area 584 sq. M built-up area of ​​4 588.38 m2

Residential building consists of 2 inputs, with 7 floors and a basement. With energy audit are prescribed these energy saving measures: Replacement of existing old windows; Thermal insulation of exterior walls; Thermal insulation of the roof; Thermal insulation of floor; Introduction of energy-efficient lighting.

Residential building located in: c. Plovdiv, ul. "Lotus" № 2, 4, 6, 8, 10, 12, bc "Sunrise" Region "East".

2 of Regulation 1 for nomenclature types of construction.

Area: 1 057.95 m ?.

Total area: 5 420.15 meters.

The building consists of 2 sections with identical floor plans. Each section has 3 separate entrances. The sections consist of five floors above ground and one semi-underground floor. With energy audit are prescribed these energy saving measures: Replacement of existing old windows; Thermal insulation of exterior walls; Thermal insulation of the roof; Thermal insulation of floors.

Residential building in Plovdiv., Str. "Pere Toshev" № 97, ent. A, B, C, "South."

3 BV) of TDA.

Built area: 707,55 m ?.

Total area: 4 304,79 m.

The building consists of 3 inputs / ent. A ent. B ent. B / each with 2 separate entrance / exit. Each I / ent. A ent. B ent. I / O consists of 6 aboveground floors and one semi-underground floor. With energy audit are prescribed these energy saving measures: Replacement of existing old windows; Thermal insulation of exterior walls; Thermal insulation of the roof; Thermal insulation of floors.

Residential building with administrative address: c. Plovdiv, bul. "Nikola Vaptsarov" № 124, 126, 128, 130, 132, "South."

4, letter "b" of the TDA.

Area: 872 meters 2 ;

Total area - 4458 m 2 .

1st section has 2 inputs address: bul. "Nikola Vaptsarov" № 124, 126 and the other one with 3 inputs address: bul. "Nikola Vaptsarov" № 128, 130, 132.

With energy audit are prescribed these energy saving measures: Replacement of existing old windows; Thermal insulation of exterior walls; Thermal insulation of the roof; Thermal insulation of floor; Replacement of lighting stair lighting.

3 point 2 - residential building construction is the third category.

Built-up Area 697.66 sq. M built-up area of ​​4 099.38 m2

The building consists of 4 inputs that have a basement and five floors. With energy audit are prescribed these energy saving measures: Replacement of existing old windows; Thermal insulation of exterior walls; Thermal insulation of the roof; Thermal insulation of floor; Introduction of energy-efficient lighting.

72/2003 AD).

Total area: 554.90 square meters

Total area: 3 285.91 m2

The building consists of a combination block-section 2 residential units - left (№ 2 / ent. A) - a six-storey, right (№ 4 / ent. B) - a six-storey building system substructure-free panel residential buildings Bs- IV- IX -75 Pd. The floors is equal in height to the fifth floor and the other in the sixth. With energy audit are prescribed these energy saving measures: Replacement of existing old windows; Thermal insulation of exterior walls; Thermal insulation of the roof; Thermal insulation of floor; Introduction of energy-efficient lighting.

"Residential building" in the city. Plovdiv region "East" street. "Elba" № 2, 4, 6.

72/2003 AD).

Oh

Execution of construction works to improve the energy efficiency of existing multi-family residential buildings in the municipality of Plovdiv 7 lots

община Пловдив | Published February 27, 2017  -  Deadline April 5, 2017
cpvs
45000000

The selected contractor will perform construction work of residential buildings, including generally described below activities: 1. Implementation of works under the investment project, regulations and orders in the order book. 2. Implement Contingency works that are species and / or amounts of work are not included in the investment project and Quantitative - the bills; 3. Supply and use in the construction of the necessary and consistent with the investment project construction products; 4. Conducting the necessary tests and laboratory tests; 5. Preparation of construction documents and preparation of executive documentation of construction; 6. Participation in the introduction of buildings; 7. Elimination of defects in transmission construction and commissioning; 8. Removal of manifest defects in the warranty period stipulated by the contract for the procurement in accordance with the offer.

Perform insulation works on energy facilities, heating networks and stations on the territory of "EVN Bulgaria DHC" AD gr. Plovdiv.

„ЕВН България Топлофикация“ ЕАД | Published October 16, 2015
cpvs
45000000

Извършване на топлоизолационни работи по енергийни съоръжения, топлопреносни мрежи и абонатни станции на територията на „ЕВН България Топлофикация“ ЕАД гр. Пловдив

Performing insulation works on energy facilities, heating networks and stations on the territory of "EVN Bulgaria DHC" AD, Plovdiv

ЕВН България Топлофикация ЕАД | Published April 13, 2017
cpvs
45321000

"Replacing the internal heating installation and construction of solar installation in DG" Lilia "c. Plovdiv within the program BG04" Energy efficiency and renewable energy "procedure BG04-02-03, financed by the Financial Mechanism of the European Economic Area 2009- 2014. "

Община Пловдив | Published December 21, 2016  -  Deadline January 10, 2017
cpvs
45300000

Time limit for receipt of tenders: 10/01/2017, the 17:15 Place of destination: Administrative building of the Municipality of Plovdiv town. Plovdiv, Sq. "Central" № 1 filing date and time of opening of offers received: 11.01. 2017, 10:00

Technical testing, analysis and consultancy services

„ЕВН България Електроразпределение“ ЕАД | Published February 3, 2017  -  Deadline March 6, 2017
cpvs
71600000

Subsequent verification of meters under Art. 44 pt. 3 of the measurements and art. 670 of the Ordinance on measuring instruments subject to metrological control. The scope of supply includes single-phase active electrical energy induction and static-rate, dual-rate counters and multirate and three-phase meters for active and reactive energy, induction and static-rate, dual-rate counters and multi-tariff.

Subsequent verification of electricity under Article 44 item 3 of the measurements and chl.670, the Ordinance on measuring instruments subject to metrological control

ЕВН БЪЛГАРИЯ ЕЛЕКТРОРАЗПРЕДЕЛЕНИЕ ЕАД | Published February 2, 2017
cpvs
71600000

Subsequent verification of electricity under Article 44 item 3 of the measurements and chl.670, the Ordinance on measuring instruments subject to metrological control. The scope of supply includes single-phase active electrical energy induction and static-rate, dual-rate counters and multirate and three-phase meters for active and reactive energy, induction and static-rate, dual-rate counters and multirate

Architectural and building-surveying services

Община Пловдив | Published November 18, 2016
Winner
ДЗЗД „Консорциум Мултиплекс инженеринг — Лайф Енерджи“
cpvs
71251000

Preparation of technical inspection / constructive and energy / under Art. 176 C of the SPA for the project Exhibition Gallery, str. "Gladston" № 32 gr. Plovdiv.