Public tenders for energy in Pazardzhik Bulgaria

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyBulgariapazardzhik

"Preparation of conformity assessment of investment projects, construction supervision and implementation of investment control of Multifamily Buildings in connection with the implementation of the National Programme for Energy Efficiency of Residential Buildings".

Община Пазарджик | Published February 10, 2016  -  Deadline March 21, 2016
cpvs
71000000, 71520000, 71521000

The contract covers the implementation of activities related to the preparation of conformity assessment of investment business projects, construction supervision and implementation of investment control of Multifamily Buildings in connection with the implementation of the National Programme for Energy Efficiency of Residential Buildings.

Activities to be implemented in each respective lot are as follows:

- Performance and conformity assessment of investment business projects prepared in accordance with Decree № 4 of 05.21.2001 on the scope and content of investment projects, TDA and regulations for its implementation and the guidelines of the National Programme for Energy Efficiency of Residential buildings. The main parts, which will be developed working projects are: part architecture, part of Energy Efficiency, part Overall, some electrical, some plumbing and HVAC part;

- Construction supervision, subject to the relevant legislation;

- Implementation of investment control.

Architectural, engineering and surveying services

Община Пазарджик | Published September 9, 2016
Winner
ДЗЗД „Енерго Еко“, ЕИК по Булстат 177057787
cpvs

The contract was opened in connection with the implementation of the National Programme for Energy Efficiency of Residential Buildings. The activities envisaged for implementation in each respective lot are as follows:

a / preparation of audits to establish the technical characteristics related to the requirements of Art. 169 par. 1 pt. (1-5) and par. 2 of the SPA;

b / Preparation of energy efficiency testing and prescription needed ESM in accordance with the statutory requirements for energy efficiency under the Energy Efficiency Act and the regulations for its implementation.

Architectural, engineering and surveying services

Община Пазарджик | Published June 15, 2016
Winner
ДЗЗД „Ер Те Обединение“
cpvs
71250000

The contract was opened in connection with the implementation of the National Programme for Energy Efficiency of Residential Buildings. The activities envisaged for implementation in each respective lot are as follows:

a / preparation of audits to establish the technical characteristics related to the requirements of Art. 169, para. 1 pt. (1-5) and par. 2 of the SPA;

b / Preparation of energy efficiency testing and prescription needed ESM in accordance with the statutory requirements for energy efficiency under the Energy Efficiency Act and the regulations for its implementation.

Architectural, engineering and surveying services

Община Пазарджик | Published October 14, 2015  -  Deadline November 18, 2015
cpvs
71250000

The order was found in connection with the implementation of the National Programme for Energy Efficiency of Residential Buildings. The activities envisaged for implementation in each respective lot are the following: a) preparation of surveys to establish the technical characteristics related to the requirements of Art. 169 par. 1 pt. (1-5) and para. 2 of the SPA; b) establish an energy efficiency audit and prescribing appropriate ECM in accordance with legal requirements for energy efficiency under the Energy Efficiency Act and the regulations for its implementation.

Architectural, engineering and surveying services

Община Пазарджик | Published October 30, 2015
Winner
„Евиданс Инженеринг“ ООД
cpvs
71250000

The order was found in connection with the implementation of the National Programme for Energy Efficiency of Residential Buildings. The activities envisaged for implementation in each respective lot are the following: a) preparation of surveys to establish the technical characteristics related to the requirements of Art. 169, para. 1 pt. (1-5) and para. 2 of the SPA; b) establish an energy efficiency audit and prescribing appropriate ECM in accordance with legal requirements for energy efficiency under the Energy Efficiency Act and the regulations for its implementation.

Architectural, engineering and surveying services

Община Пазарджик | Published August 5, 2015
Winner
ДЗЗД „ЕЕ Пазарджик 2015“
cpvs
71250000

The order was found in connection with the implementation of the National Programme for Energy Efficiency of Residential Buildings. The activities envisaged for implementation in each respective lot are the following: - Preparation of audits to establish the technical characteristics related to the requirements of Art. 169, para. 1 pt. (1-5) and para. 2 of the SPA; - Preparation of an energy efficiency audit and prescribing appropriate ECM in accordance with legal requirements for energy efficiency under the Energy Efficiency Act and the regulations for its implementation.

Architectural, engineering and surveying services

Община Пазарджик | Published June 17, 2015  -  Deadline July 22, 2015
cpvs
71250000

The order was found in connection with the implementation of the National Programme for Energy Efficiency of Residential Buildings. The activities envisaged for implementation in each respective lot are the following: a) preparation of surveys to establish the technical characteristics related to the requirements of Art. 169 par. 1 pt. (1-5) and para. 2 of the SPA; b) establish an energy efficiency audit and prescribing appropriate ECM in accordance with the legal requirements for energy efficiency under the Energy Efficiency Act and the regulations for its implementation.

Architectural, engineering and surveying services

Община Пазарджик | Published February 24, 2015  -  Deadline April 6, 2015
cpvs
71250000

The contract is found in connection with the implementation of the National Program for Energy Efficiency of Residential Buildings. The activities envisaged for implementation in each respective lot are the following: a) preparation of surveys to identify the technical characteristics related to the requirements of Art. 169 para. 1 pt. (1-5) and para. 2 of the SPA; b) establish an energy efficiency audit and prescribing appropriate ECM in accordance with the legal requirements for energy efficiency under the Energy Efficiency Act and the regulations for its implementation. Scope of the contract is detailed in the Technical Specification documentation for participation.

Architectural, engineering and surveying services

Община Пазарджик | Published April 29, 2017  -  Deadline June 6, 2017
cpvs
71250000

1, from the Public Procurement Act, to select a contractor for activities related to the implementation of a National Energy Efficiency Program for multifamily residential buildings. The implementation activities envisaged for each multi-family residential building are the following:

3 of the TDA and drawing up a technical passport;

B / preparing an energy efficiency audit.

The technical and energy audits carried out should indicate which prescribed measures are mandatory for implementation in view of the activities financed under the National Program for Energy Efficiency of Multifamily Residential Buildings.

1, from the Public Procurement Act, to select a contractor for activities related to the implementation of a National Energy Efficiency Program for multifamily residential buildings. The implementation activities envisaged for each multi-family residential building are the following:

3 of the TDA and drawing up a technical passport;

B / preparing an energy efficiency audit.

The technical and energy audits carried out should indicate which prescribed measures are mandatory for implementation in view of the activities financed under the National Program for Energy Efficiency of Multifamily Residential Buildings.

The projected number of multifamily residential buildings for which contracts will be concluded on the basis of the framework agreement is 61 with a total number of block sections 123.

The estimated total built-up area for all multi-family residential buildings that fall under the scope of the order is 246 264 sq.m.

A contract based on the framework agreement with the participant designated as a contractor for the performance of the activities in respect of a specific multi-family residential building will be concluded after signing a relevant Contract for Target Financing for this Building under the National Program for Energy Efficiency of Multifamily Housing Buildings.

Architectural, construction, engineering and inspection services

Община Пазарджик | Published March 30, 2016  -  Deadline May 4, 2016
cpvs
71000000, 71520000, 71521000

The contract covers the implementation of activities related to the preparation of conformity assessment of investment business projects, construction supervision and implementation of investment control of Multifamily Buildings in connection with the implementation of the National Programme for Energy Efficiency of Residential Buildings.

Activities to be implemented in each respective lot are as follows:

- Performance and conformity assessment of investment business projects prepared in accordance with Decree № 4 of 05.21.2001 on the scope and content of investment projects, TDA and regulations for its implementation and the guidelines of the National Programme for Energy Efficiency of Residential buildings. The main parts, which will be developed working projects are: part architecture, part of Energy Efficiency, part Overall, some electrical, some plumbing and HVAC part.

- Construction supervision, subject to the relevant legislation.

- Implementation of investment control.

Architectural design services

Община Пазарджик | Published August 12, 2016
Winner
„Сетатех“ ЕООД, ЕИК 202571423
cpvs
71220000, 45000000, 71000000

The contract covers the implementation of Engineering (detailed design, coordination, construction and supervision,) of multifamily residential buildings in connection with the implementation of the National Programme for Energy Efficiency of Residential Buildings. Engineering activities to be implemented by each respective lot are as follows:

- Review and analysis of the existing situation and the available documentation for planned activities as follows: a / audits prepared to establish the technical characteristics related to the requirements of Art. 169 par. 1 pt. (1-5) and par. 2 of the SPA; b / made energy efficiency testing and prescription needed ESM in accordance with the statutory requirements for energy efficiency under the Energy Efficiency Act and the regulations for its implementation.

- Preparation of Detailed design according to the requirements of Ordinance № 4 of 21.05.2001 on the scope and content of investment projects, TDA and regulations for its implementation and the guidelines of the National Programme for Energy Efficiency of Residential Buildings;

- Coordination of projects with all control bodies operating companies and institutions in accordance with the legal requirements and specifications;

- Get all the opinions and authorizations under Bulgarian legislation;

- Obtaining a building permit based on approved Detailed design in all project areas in accordance with Art. 148 of the SPA and lawful commencement of construction;

- Implementation of the construction works;

- Implementation of supervision under the ATS, including strict compliance with the approved project documentation, technical solutions, adjustments to the project, process control and assistance in entering the facility into operation;

- Preparation of executive documentation, in accordance with the LSP;

- Introduction of a facility into operation with Protocol - 'Model 16' and permission to use.

Architectural design services

Община Пазарджик | Published April 1, 2016  -  Deadline May 9, 2016
cpvs
71220000, 45000000, 71000000

The contract covers the implementation of Engineering (detailed design, coordination, construction and supervision,) of multifamily residential buildings in connection with the implementation of the National Programme for Energy Efficiency of Residential Buildings.

Engineering activities to be implemented by each respective lot are as follows ::

- Review and analysis of the existing situation and the available documentation for planned activities as follows:

and / audits prepared to establish the technical characteristics related to the requirements of Art. 169 par. 1 pt. (1-5) and par. 2 of the SPA;

b / made energy efficiency testing and prescription needed ESM in accordance with the statutory requirements for energy efficiency under the Energy Efficiency Act and the regulations for its implementation.

- Preparation of Detailed design according to the requirements of Ordinance № 4 of 21.05.2001 on the scope and content of investment projects, TDA and regulations for its implementation and the guidelines of the National Programme for Energy Efficiency of Residential Buildings;

- Coordination of projects with all control bodies operating companies and institutions in accordance with the legal requirements and specifications;

- Get all the opinions and authorizations under Bulgarian legislation;

- Obtaining a building permit based on approved Detailed design in all project areas in accordance with Art. 148 of the SPA and lawful commencement of construction;

- Implementation of the construction works;

- Implementation of supervision under the ATS, including strict compliance with the approved project documentation, technical solutions, adjustments to the project, process control and assistance in entering the facility into operation;

- Preparation of executive documentation, in accordance with the LSP;

- Introduction of a facility into operation with Protocol - 'Model 16' and permission to use.

Architectural design services

Община Пазарджик | Published December 31, 2015  -  Deadline February 8, 2016
cpvs
71220000, 45000000, 71000000

The contract covers the implementation of the Engineering (detailed design, coordination, construction and supervision,) of multifamily residential buildings in connection with the implementation of the National Programme for Energy Efficiency of Residential Buildings. Engineering activities envisaged in each respective lot are the following: - Review and analysis of the existing situation and the available documentation for planned activities as follows: a) made investigations to establish the technical characteristics related to the requirements of Art. 169 par. 1 pt. (1-5) and para. 2 of the SPA; b) Prepare an energy efficiency audit and prescribing appropriate ECM in accordance with legal requirements for energy efficiency under the Energy Efficiency Act and the regulations for its implementation. - Preparation of Detailed design according to the requirements of Regulation № 4 of 05.21.2001 on the scope and content of investment projects, TDA and regulations for its implementation and the guidelines of the National Programme for Energy Efficiency of Residential Buildings; - Coordination of projects with all supervisory authorities, operating companies and institutions, according to the legal requirements and melancholy conditions; - Obtaining all necessary advice and authorizations under Bulgarian legislation; - Obtaining a building permit on the basis of approved Detailed design of all project areas in accordance with Art. 148 TDA and lawful commencement of construction; - Implementation of the construction works; - Implementation of supervision by the ATS, including strict compliance with the approved project documentation, technical solutions, project completions, process control and assistance in entering the facility into operation; - Preparation of executive documentation, in accordance with the Spatial Development Act; - Introduction of a facility into operation with the Protocol - "Model 16" and permission to use.

"Supply of net active electric power by a contractor, coordinator of standard balancing group for low voltage with full administration of information flow with ESO and defraying the imbalances of objects of Pazardzhik municipality."

Община Пазарджик | Published February 24, 2016  -  Deadline March 30, 2016
cpvs
09310000

This contract aims to be a contractor for the supply of net active electric power, which is the coordinator of standard balancing group for low voltage, providing full administration of information flow with ESO and defraying the imbalances of objects of the Municipality of Pazardzhik.

Pazardzhik municipality has 810 ITN Number (measuring point) with a total consumption for the previous calendar year volume of 12,027 MWh net active electric power. At the date of opening of the order 52 ITN are technically possible to measure the energy supplied by the free market, the volume of consumption for the last preceding calendar year 4260 MWh net active electric power.

The estimated amount of this contract at the date of its opening is set at 17 040 MWh net active electric power representing the energy consumption of ITN technically possible to measure the energy supplied by the free market. It is envisaged that if technically possible contracting entity will be joined by new sites further listed in the commercial metering, as appropriate, with the required documents for this and negotiated with the contractor price per MWh.

Construction-site supervision services

Община Пазарджик | Published November 10, 2016  -  Deadline December 13, 2016
cpvs
71521000

The contract covers the implementation of activities related to the preparation of conformity assessment of investment business projects, construction supervision and implementation of investment control of Multifamily Buildings in connection with the implementation of NPEE of multifamily buildings. Activities to be implemented in each respective lot are: performance and conformity assessment of investment business projects prepared in accordance with Decree № 4 of 21.05.2001 on the scope and content of investment projects, TDA and regulations for its implementation and instructions NPEE of multifamily buildings. The main parts, which will be developed working projects are: part architecture, part of Energy Efficiency, part Overall, some electrical, some plumbing, HVAC part, part DB, part PBZ part PUSO; construction supervision, subject to the relevant legislation; implementation of investment control.

In Lot 1 are intended to be implemented the following activities:

- Making and conformity assessment of investment business projects prepared in accordance with Decree № 4 of 05.21.2001 on the scope and content of investment projects, TDA and regulations for its implementation and the guidelines of the National Programme for Energy Efficiency of Residential buildings. The main parts, which will be developed working projects are: part architecture, part of Energy Efficiency, part Overall, some electrical, some plumbing, HVAC part, part DB, part PBZ part PUSO.

- Supervision of works in compliance with the relevant legislation.

- Implementation of investment control.

Residential building has an address: c. Pazardzhik, ul. "D. Benkovski "№ 127, № 129, № 131 and № 133 and was built industrially: EPZHS (pre-fabricated housing).

The total area of ​​the building is 7 806.55 m2

P ...

"Award of Engineering activities - design, construction and implementation of supervision in implementing the project:" Improving the quality of the educational environment and ... cont. in p-l VI.3

Община Пазарджик | Published April 3, 2017  -  Deadline May 11, 2017
cpvs
45200000

Corpus № 2 of the PGSS "Queen Joanna" c. Pazardzhik basically consists of two floors and one semi-underground floor, with only South East. Part of the building is full and partial third floor above ground level within the roof space. Present section under the building beneath which is not implemented basement. It has an irregular shape in plan, approaching the U-shaped and has a general overall dimensions in plan 40.65 / 26.85 m. The overall height of the building to the cornice of 8.45 m to 8.60 m. depending on the slope of adjacent land. The site has an area of ​​2345.79 m2 and is a third category of construction. Was put into operation in 1937. From construction to date on the building of School Building № 2 have been only current and emergency repairs. Over the years were not conducted activities on the introduction of measures to ensure energy efficiency and accessible environment.

Construction work

Община Пазарджик | Published March 25, 2017
Winner
„Валдор-60“ ООД
cpvs
45000000

The contract covers the execution of works relating to the implementation of the National Programme for Energy Efficiency of Residential Buildings. Subject of renovation are 5 residential buildings with the following addresses: 1. c. Pazardzhik, ul. "Bend black" № 20 and № 22; 2. c. Pazardzhik, ul. "San Stefano" № 15, ent. A and B; 3. c. Pazardzhik, ul. "Batak" № 6; 4. c. Pazardzhik, ul. "Peter Bonev" № 104; 5. c. Pazardzhik, ul. "Sazliika" № 9-11.

The order in each respective lot includes works on energy renovation scheduled for execution of buildings and has the following range: - Review and analysis of the existing situation and the available documentation for planned activities as follows: a / prepared and approved Detailed design; b / building permit; - Implementation of the construction works; - Duly established acts and protocols according to Bulgarian legislation certifying the execution of construction activities.

In Lot 1 are intended to be implemented the following activities:

- Review and analysis of the existing situation and the available documentation for planned activities as follows:

and / prepared and approved Detailed design;

b / building permit:

- Implementation of the construction works;

- Duly established acts and protocols according to Bulgarian legislation certifying the execution of construction activities.

The total area of ​​the building is 3 022.13 m2

Construction is under SPA Group I third category.

In Lot 3 is allocated to the following activities:

- Review and analysis of the existing situation and the available documentation for planned activities as follows:

and / prepared and approved Detailed design;

b / building permit.

- Implementation of the construction works;

- Duly established acts and protocols according to Bulgarian legislation certifying the design ...

Construction supervision services

Община Пазарджик | Published April 5, 2017  -  Deadline May 10, 2017
cpvs
71520000, 71521000

1 of the EEA. Building. Supervision is exercised acc. requirements of TDA and apps. norm. framework. The person exercise. Building. Supervision sign all acts and protocols during construction and after Fin. of works prepare a final report to the contracting authority and techno. Passport site.

The project proposal includes activities mainly renovation of the building, which will be implemented measures approved for funding ADBFP № BG16RFOP001-3.002-0021-C01 and laid down in The energy efficiency of the building as energy efficient as well as measures prescribed in the Report of investigation to establish the technical characteristics of the site, contributing to the improvement of the educational environment and facilities of the school.

11 of the TDA. The investment project is subject to consultation and approval and are grounds for issuance of a building permit. All parts of the investment project, which are grounds for issuance of a building permit shall be assessed for their compliance with the essential requirements for construction works.

5 of TDA.

145 of the SPA by the chief architect of the municipality and the issuance of construction permits.

Construction supervision during construction works: Supervision is exercised in accordance with the Law on Spatial Planning and the applicable regulations.

The person exercising construction supervision shall sign all acts and protocols during construction, according to Decree № 3 of 31.7.2003 on drawing up acts and protocols during construction issued by the Minister of Regional Development and Public Works.

Regulations and orders of the person exercising construction supervision, listed in the order book are mandatory for the builder, developer and technical manager of the construction.

Breach of technical rules and regulations person exercising construction supervision shall notify the Regional Directorate for National Construction Control within 3 days of the finding.

After Fin. Construction works of the person exercising construction supervision, prepare a final report to the contracting authority. Persons exercising construction supervision shall be liable for damage inflicted on the assignor and others. participants in construction and several liability with the developer for damages caused by breach of technical rules and regulations and the approved projects. Liability under the contract for construction supervision is a time not less than the warranty period of the construction.

Construction-site supervision services

Община Пазарджик | Published March 10, 2017  -  Deadline April 11, 2017
cpvs
71521000

10 of TDA and construction supervision of objects - hostel of the school "Georgi Benkovski" school "Lyuben Karavelov" and "Hristo Botev" project "Renovation and modernization of education infrastructure in the town of Pazardzhik - hostel of the school" G. Benkovski "school" Lyuben Karavelov "school" Dimitar Gachev "High School" Dr Petar Beron "and" Hristo Botev "OP" Regions for Growth "2014 - 2020 entitled" ".

The scope of the contract is detailed in the Technical Specification documentation for participation.

10 of TDA and construction supervision of the hostel of the school "Georgi Benkovski".

The activities to be implemented under Lot 1 are:

and / Appraisal of compliance of the investment project, including:

- Conformity assessment of its "Construction" of the investment project by a natural person exercising technical control for part "Construction", included in the list of the Chamber of Engineers in Investment Design; and

6 TDA prepared under Ordinance № 7 of 2004 on energy efficiency of buildings; and

2 of TDA.

b / Supervision of works, including preparation of a final report and technical passport.

Dormitory of the school "Georgi Benkovski" is the address: c. Pazardzhik, ul. "Hristo Botev" № 38. The building consists of 6 aboveground floors and one semi-dug basement. The construction of the building was built industrially - plattenbau molded with zero cycle of elevation - 2.90 to 0.00 m elevation.

The total area is 3143.84 square meters

10 of TDA and construction supervision of school "Lyuben Karavelov".

The activities envisaged in lot 2 are:

and / Appraisal of compliance of the investment project, including:

- Conformity assessment of its "Construction" of the investment project by a natural person exercising technical control for part "Construction", included in the list of the Chamber of Engineers in Investment Design; and

6 TDA prepared under Ordinance № 7 of 2004 on energy efficiency of buildings; and

2 of TDA.

b / Supervision of works, including preparation of a final report and technical passport.

Primary School "Lyuben Karavelov" is the address: c. Pazardzhik, ul. "Panayot Volov" № 1. The building consists of 2 buildings and is monolithic reinforced concrete structure.

The total area is 6 139.60 square meters

10 of TDA and construction supervision of school "Hristo Botev".

The activities envisaged in lot 3 are:

and / Appraisal of compliance of the investment project, including:

- Conformity assessment of its "Construction" of the investment project by a natural person exercising technical control for part "Construction", included in the list of the Chamber of Engineers in Investment Design; and

6 TDA prepared under Ordinance № 7 of 2004 on energy efficiency of buildings; and

2 of TDA.

b / Supervision of works, including preparation of a final report and technical passport.

Primary school "Hristo Botev" is the address: c. Pazardzhik, ul. "Vasil Aprilov" № 1. The building consists of 2 buildings and is monolithic reinforced concrete structure.

The total area is 3634 m2

Works for complete or part construction and civil engineering work

Община Пазарджик | Published April 5, 2017  -  Deadline May 10, 2017
cpvs
45200000, 71315000

Corpus № 2 of the PGSS "Queen Joanna" c. Pazardzhik basically consists of two floors and one semi-underground floor, with only South East. Part of the building is full and partial third floor above ground level within the roof space. Present section under the building beneath which is not implemented basement. It has an irregular shape in plan, approaching the U-shaped and has a general overall dimensions in plan 40.65 / 26.85 meters. The total height of the building up to the cornice is from 8.45 m to 8.60 m, depending the slope of adjacent land. The site area is 2 345.79 m 2 and is a third category of construction. Was put into operation in 1937. Since its construction so far on the building of School Building № 2 have been only current and emergency repairs. Over the years were not conducted activities on the introduction of measures to ensure energy efficiency and accessible environment.

Corpus № 2 of the Professional School of Agriculture "Queen Joanna" c. Pazardzhik area is 345.79 m 2 2 and is a third category of construction. Activities within the scope of the contract: Development of investment project - Inv. project must be made at the "working draft" and the same should be included. all measures of technical specifications required for the full renovation of the building. The content of the individual project areas are listed in Tech. specification. Execution of works - performed in accordance with Part Three "construction" of the SPA and starts after the entry into force of the building permit for the site, and after signing the protocol opening the construction site and determining the construction line and level of the building. Tech. of works to be executed in resp. requirements in the Bulgarian. regulations Tech. specifications of the input in the construction constr. products, materials and equipment, and good Building. Practices in Bulgaria and Europe. Author's supervision - order includes the obligation of designers to perform their duties as a designer engaged avtors ...