Call +44 800 9755 164

Public tenders for energy in Burgas Bulgaria

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Introduction of measures for energy efficiency of street lighting in the complex "Slaveykov".

Община Бургас | Published March 3, 2016
cpvs
45000000

Introduction of measures for energy efficiency of street lighting in the complex "Slaveykov".

Introduction of measures for energy efficiency of street lighting in the complex "Sunrise" and complex "Zornitsa".

Община Бургас | Published March 3, 2016
cpvs
45000000

Introduction of measures for energy efficiency of street lighting in the complex "Sunrise" and complex "Zornitsa".

Updating and implementation of energy efficiency measures in the building of the Municipality Street. "Alexandrovska" № 26.

Община Бургас | Published March 3, 2016
cpvs
45000000

Updating and implementation of energy efficiency measures in the building of the Municipality Street. "Alexandrovska" № 26.

Updating and implementation of energy efficiency measures in the building of the NRA (str. "Tsar Peter" № 5B).

Община Бургас | Published March 3, 2016
cpvs
45000000

Updating and implementation of energy efficiency measures in the building of the NRA (str. "Tsar Peter" № 5B).

Implementation of Engineering, design and execution of works relating to the implementation of the National Programme for Energy Efficiency of Residential Buildings in the municipality of Burgas lots.

Община Бургас | Published March 3, 2016
cpvs
45000000, 71221000, 71315000

Implementation of Engineering, design and execution of works relating to the implementation of the National Programme for Energy Efficiency of Residential Buildings in the municipality of Burgas lots.

"Implementation of measures for energy efficiency of street lighting in the complex" Slaveykov "complex" Zornitsa "and complex" Sunrise "Municipality" on lots:

Община Бургас | Published January 20, 2017  -  Deadline February 28, 2017
cpvs
34993000

"Implementation of measures for energy efficiency of street lighting in the complex" Slaveykov "complex" Zornitsa "and complex" Sunrise "Municipality" on lots: Lot 1: Introduction of energy efficiency measures street lighting in the complex "Zornitsa" - Burgas. Lot 2: Introduction of measures for energy efficiency of street lighting in the complex "Sunrise" - Burgas. Lot 3: "Introduction of measures for energy efficiency of street lighting in the complex" Slaveykov "- Burgas.

"Implementation of energy efficiency measures in the building of the school" Hristo Botev "in the town. Bourgas, kv. Vetren, Building I, ra 42"

Община Бургас | Published November 17, 2016  -  Deadline December 22, 2016
cpvs
45000000

Choosing a contractor for the introduction of energy efficiency measures in buildings "Hristo Botev" c. Burgas, kv. Vetren, Building I, ra 42. With energy efficiency measures provided for building heating in buildings in the new proposed boiler, which will toplosnabdyava two buildings of the school "Hristo Botev" is planned installation of a new fully automated boiler for burning biomass - wood pellets.

"Choosing a contractor for construction supervision in carrying out construction and repair work in the implementation of the National Programme for Energy Efficiency of Residential Buildings in the municipality of Burgas twelve lots."

Община Бургас | Published March 4, 2016
cpvs
71521000, 71000000

"Choosing a contractor for construction supervision in carrying out construction and repair work in the implementation of the National Programme for Energy Efficiency of Residential Buildings in the municipality of Burgas twelve lots."

"Choosing a contractor for construction supervision in carrying out construction and repair work in the implementation of the National Programme for Energy Efficiency of Residential Buildings in the municipality of Burgas 6 lots."

Община Бургас | Published March 4, 2016
cpvs
71521000, 71000000

"Choosing a contractor for construction supervision in carrying out construction and repair work in the implementation of the National Programme for Energy Efficiency of Residential Buildings in the municipality of Burgas 6 lots."

Introduction of energy efficiency measures in the administrative building located in the property identifier 07079.607.67 KKKR in the city of Burgas, ul. "Perushtitca" № 67.

Регионална инспекция по околната среда и водите - Бургас | Published December 8, 2016  -  Deadline January 10, 2017
cpvs
45000000

Introduction of energy efficiency measures in an administrative building with ID 07079.607.67 KKKR in the city of Burgas, ul. "Perushtitca" № 67. For the building provided the following works: • Replacement of windows; • insulation of walls; • Insulation of roof; • Insulation of floor; • Construction of a lighting installation; • Construction of heating.

"Implementation of measures for energy efficiency of the building of" School of Public Health and Health Care "to" Prof.. Dr. Zlatarov "

Университет 'Проф. д-р Асен Златаров' | Published December 29, 2016  -  Deadline January 31, 2017
cpvs
45000000

"Implementation of measures for energy efficiency of the building of" School of Public Health and Health Care "to" Prof.. Dr. Zlatarov. "In connection with the procurement will be carried out the following activities: ECM B1 -External walls placing facade insulation, ECM B2 - For a heated basement - placing insulation ECM B3 - Roof warm and hiodroizolatsiya, B4 ECM - Replacement of windows, C1 ECM - Internal heating system with pipes, collector boxes and radiators. ,, total amount and volume according to CSO and technical specifications integral part of the tender documentation. "

Performing works for objects of educational infrastructure, according to the investment program of the Municipality in lots: OP 1: Construction of a new kindergarten in DC - Meden Rudnik; OP 2: Updating the yard and playgrounds School Bratya Miladinovi, Burgas, - II stage; OP 3 Update terrain / yards and playgrounds in High School "Petko Rosen" I stage; OP 4: Repair and reconstruction and implementation of energy efficiency measures and renovation of terrain / yards and playgrounds in an old bath School Karavelov; OP 5: Implementation of energy efficiency measures in the building of Kindergarten 2 Hans Christian Andersen- affiliate Lazur ".

Община Бургас | Published March 3, 2016
cpvs
45000000

Performing works for objects of educational infrastructure, according to the investment program of the Municipality in lots: OP 1: Construction of a new kindergarten in DC - Meden Rudnik; OP 2: Updating the yard and playgrounds School Bratya Miladinovi, Burgas, - II stage; OP 3 Update terrain / yards and playgrounds in High School "Petko Rosen" I stage; OP 4: Repair and reconstruction and implementation of energy efficiency measures and renovation of terrain / yards and playgrounds in an old bath School Karavelov; OP 5: Implementation of energy efficiency measures in the building of Kindergarten 2 Hans Christian Andersen- affiliate Lazur ".

Advertising material

Община Бургас | Published March 2, 2016
Winner
„Комарт“ ЕООД, ЕИК 102672087
cpvs
22462000

"Design and production of promotional materials for the project" Improving the energy efficiency of central heating 3 municipal buildings for education in the town. Burgas, jk Meden Rudnik "DBFP № BG04-02-03-022-007 / 18.08.2015, funded under the scheme BG04-02-03:" Increasing energy efficiency and use of renewable energy in municipal and state buildings and local heating systems "Measure 2 : measures for renewable energy within the program BG04 "energy efficiency and renewable energy" under the Financial mechanism of the European economic Area 2009-2014 ".

€528.55k
Mar 16
Apr 21

"Implementation of Engineering - design and execution of works relating to the implementation of the National Programme for Energy Efficiency of Residential buildings in the Municipality of Burgas" on lots: OP № 1 "Building an administrative address Burgas, jk "Revival" bl.1; OP № 2 "Building an administrative address gr. Burgas, jk" Revival "bl.2; OP № 3" Building an administrative address gr. Burgas, g. m. "Zornitsa" bl .26; OP № 4 "Building an administrative address gr. Burgas, g. k.Zornitsa bl.42; OP №" Building an administrative address gr. Burgas, g. m. Lazur bl.78; OP № 6 "Building a administrative address gr. Burgas, jk Slaveykov bl.24; OP № 7 "Building an administrative address gr. Burgas," Slaveykov "bl.57; OP № 8" Building an administrative address gr. Burgas jk Slaveykov bl.72; OP № 9 "Building an administrative address gr. Burgas, g. m. Meden rudnik bl.106; OP № 10" Building an administrative address gr. Burgas, g. m. Meden rudnik bl 0.107; OP № 11 "Building an administrative address ul." Ivan Bogorov "№20; OP № 12" Building an administrative address ul. "Strandzha mountain № 15, №17 and №19"; OP № 13 "Building an administrative address" Meden Rudnik "bl.24; OP № 14" Building an administrative address "Meden Rudnik" bl.31; OP № 15 "Building an administrative address g. k. "Meden rudnik" bl.79; OP № 16 "Building an administrative address" Slaveykov "bl.64; OP № 17" Building an administrative address jk "Zornitsa" bl.34; OP № 18 'building with administrative address "Meden rudnik" bl.55 (vh.1, vh.2, vh.3, vh.4) OP № 19 "Building an administrative address" Meden rudnik "bl.409; OP № 20" Building an administrative address "Meden rudnik" bl.410; OP № 21 "Building an administrative address jk Sunrise bl.16 "OP № 22" Building an administrative address jk "Sunrise bl.29" OP № 23 "Building an administrative address jk Meden Rudnik bl.84 "OP № 24" Building an administrative address Vazrajdane bl.42 " OP № 25 "Building an administrative address Vazrajdane bl.43" OP № 26 "Building an administrative address Bratia Miladinovi bl.1" OP № 27 "Building an administrative address Meden Rudnik bl.60" OP № 28 "Building an administrative address jk Meden rudnik bl.71 "OP № 29" Building an administrative address jk Meden Rudnik bl.76 "OP № 30" Building an administrative address Meden Rudnik bl.95 "OP№ 31 'building with administrative address in jk Meden Rudnik bl.97 "OP № 32" Building an administrative address jk Meden Rudnik bl.104 "OP № 33" Building an administrative address jk Meden Rudnik bl.112 " OP № 34 "Building an administrative address jk Slaveykov bl.21 " OP № 35 "Building an administrative address jk Sunrise build.73 " OP № 36 "Building an administrative address Sunrise bl.60" OP№ 37 'building with administrative address jk Zornitca bl.37 " №38 "Building an administrative address jk Slaveykov bl.53 " OP № 39 "Building an administrative address Vazrajdane bl.11" OP № 40 "Building an administrative address Slaveykov bl.28 and bl.28" OP № 41 "Building an administrative address jk Zornitca bl.33 "OP № 42" Building an administrative address zh.k.Zornitsa bl.25 "OP № 43" Building an administrative address jk Zornitca bl.35 " OP № 44 "Building an administrative address jk Lazur bl.81 "OP № 45" Building an administrative address jk Zornitca bl.31 "OP № 46" Building an administrative address jk Zornitca bl.39 "OP № 47" Building an administrative address jk Sunrise bl.5 bl.5 "OP № 48" Building an administrative address Lazur bl.68 "OP № 49" Building an administrative address jk Meden Rudnik 428 "; OP № 50 "Building an administrative address jk Meden Rudnik bl.415 A "OP № 51" Building an administrative address jk Meden Rudnik bl.133 "OP №52" Building an administrative address jk Meden Rudnik bl.420 "OP № 53" Building an administrative address jk Meden Rudnik bl.421 "OP № 54" Building an administrative address jk Meden Rudnik 38 "; OP № 55 "Building an administrative address jk Meden Rudnik 14 "OP № 56" Building an administrative address Meden Rudnik 18 "OP № 57" Building an administrative address near the park bl.34 "OP № 58" Building an administrative address g. k.Izgrev bl.62.

Община Бургас | Published March 16, 2016  -  Deadline April 21, 2016
cpvs
45000000, 71221000, 71315000

Eligible activities for funding under the buildings are: activities constructive restoration / enhancement / overhaul, depending on the damage occurred during the operation of multi-family residential buildings that are prescribed as mandatory for building the technical inspection; implementation of energy efficiency measures that are prescribed as mandatory for building in the energy audit; renovation of the common areas of multi-family residential buildings (repair of roof, facade, refreshing the staircase, etc.) Accompanying construction works related to the implementation of energy efficiency measures and the corresponding recovery of the common parts of the building as a result of completed measures with energy saving effect. Accompanying construction works related solely to restore the original state, impaired due to renovation of the common areas and the replacement of windows in standalone obekt.Po program will finance most cost-effective package of energy saving measures for the building, which achieves class energy "C" in accordance with Decree № 7 of 2004 on energy efficiency in buildings, not higher. The contract is aimed at the renovation of multi-family residential buildings, as it seeks through the implementation of energy efficiency measures to provide better living conditions for citizens in multifamily buildings, thermal comfort and higher quality of living environment. implementation of energy efficiency measures in multifamily buildings will contribute to: a higher level of energy efficiency in multifamily buildings and reducing energy costs and improving performance to extend the life cycle of buildings, providing conditions of living environment in accordance with sustainability criteria.

Construction work

Община Бургас | Published October 8, 2016
Winner
„Мелаинвест и партньори“ ООД, ЕИК: 102826410
cpvs
45000000, 71315000, 71221000

Eligible activities for funding under the buildings are: activities constructive restoration / enhancement / overhaul, depending on the damage occurred during the operation of multi-family residential buildings that are prescribed as mandatory for building the technical inspection; implementation of energy efficiency measures that are prescribed as mandatory for building in the energy audit; renovation of the common areas of multi-family residential buildings (repair of roof, facade, refreshing the staircase, etc.); Accompanying construction works related to the implementation of energy efficiency measures and the corresponding recovery of the common parts of the building as a result of the implemented measures with energy saving effect. Accompanying construction works related solely to restore the original state, impaired due to renovation of the common areas and the replacement of windows in the separate building. The program will finance most cost-effective package of energy saving measures for the building, which achieves class energy "C" in accordance with Decree № 7 of 2004 on energy efficiency in buildings, not higher. The contract is aimed at the renovation of multi-family residential buildings, as it seeks through the implementation of energy efficiency measures to provide better living conditions for citizens in multifamily buildings, thermal comfort and higher quality of living environment. Implementation of energy efficiency measures in multifamily buildings will contribute to: a higher level of energy efficiency of multi-family residential buildings and reduce energy costs; improving performance to extend the life cycle of buildings; providing conditions of living environment in accordance with sustainability criteria.

Construction work

Община Бургас | Published September 7, 2016
Winner
„АКЗ-Бургас“ ЕООД, ЕИК: 102778667
cpvs

Eligible activities for funding under the buildings are: activities constructive restoration / enhancement / overhaul, depending on the damage occurred during the operation of multi-family residential buildings that are prescribed as mandatory for building the technical inspection; implementation of energy efficiency measures that are prescribed as mandatory for building in the energy audit; renovation of the common areas of multi-family residential buildings (repair of roof, facade, refreshing the staircase, etc.) Accompanying construction works related to the implementation of energy efficiency measures and the corresponding recovery of the common parts of the building as a result of completed measures with energy saving effect. Accompanying construction works related solely to restore the original state, impaired due to renovation of the common areas and the replacement of windows in the separate building. The program will finance most cost-effective package of energy saving measures for the building, which achieves class energy "C" in accordance with Decree № 7 of 2004 on energy efficiency in buildings, not higher. The contract is aimed at the renovation of multi-family residential buildings, as it seeks through the implementation of energy efficiency measures to provide better living conditions for citizens in multifamily buildings, thermal comfort and higher quality of living environment. Implementation of energy efficiency measures in multifamily buildings will contribute to: a higher level of energy efficiency in multifamily buildings and reducing energy costs and improving performance to extend the life cycle of buildings, providing conditions of living environment in accordance with sustainability criteria.

Construction work

Община Бургас | Published September 6, 2016
Winner
„Артстрой 1“ ЕООД, ЕИК:147008574
cpvs

Eligible activities for funding under the buildings are: activities constructive restoration / enhancement / overhaul, depending on the damage occurred during the operation of multi-family residential buildings that are prescribed as mandatory for building the technical inspection; implementation of energy efficiency measures that are prescribed as mandatory for building in the energy audit; renovation of the common areas of multi-family residential buildings (repair of roof, facade, refreshing the staircase, etc.); Accompanying construction works related to the implementation of energy efficiency measures and the corresponding recovery of the common parts of the building as a result of the implemented measures with energy saving effect. Accompanying construction works related solely to restore the original state, impaired due to renovation of the common areas and the replacement of windows in the separate building. The program will finance most cost-effective package of energy saving measures for the building, which achieves class energy "C" in accordance with Decree № 7 of 2004 on energy efficiency in buildings, not higher. The contract is aimed at the renovation of multi-family residential buildings, as it seeks through the implementation of energy efficiency measures to provide better living conditions for citizens in multifamily buildings, thermal comfort and higher quality of living environment. Implementation of energy efficiency measures in multifamily buildings will contribute to: a higher level of energy efficiency in multifamily buildings and reducing energy costs and improving performance to extend the life cycle of buildings, providing conditions of living environment in accordance with sustainability criteria.

Construction work

Община Бургас | Published August 18, 2016
Winner
„Консорциум Новел-Мастер“, ЕИК: 176957876
cpvs

Eligible activities for funding under the buildings are: activities constructive restoration / enhancement / overhaul, depending on the damage occurred during the operation of multi-family residential buildings that are prescribed as mandatory for building the technical inspection; implementation of energy efficiency measures that are prescribed as mandatory for building in the energy audit; renovation of the common areas of multi-family residential buildings (repair of roof, facade, refreshing the staircase, etc.) Accompanying construction works related to the implementation of energy efficiency measures and the corresponding recovery of the common parts of the building as a result of completed measures with energy saving effect. Accompanying construction works related solely to restore the original state, impaired due to renovation of the common areas and the replacement of windows in the separate building. The program will finance most cost-effective package of energy saving measures for the building, which achieves class energy "C" in accordance with Decree № 7 of 2004 on energy efficiency in buildings, not higher. The contract is aimed at the renovation of multi-family residential buildings, as it seeks through the implementation of energy efficiency measures to provide better living conditions for citizens in multifamily buildings, thermal comfort and higher quality of living environment. Implementation of energy efficiency measures in multifamily buildings will contribute to: a higher level of energy efficiency in multifamily buildings and reducing energy costs and improving performance to extend the life cycle of buildings; providing conditions of living environment in accordance with sustainability criteria.

Construction work

Община Бургас | Published August 19, 2016
Winner
„Бау Център“ ЕООД, ЕИК: 202411212
cpvs

Eligible activities for funding under the buildings are: activities constructive restoration / enhancement / overhaul, depending on the damage occurred during the operation of multi-family residential buildings that are prescribed as mandatory for building the technical inspection; implementation of energy efficiency measures that are prescribed as mandatory for building in the energy audit; renovation of the common areas of multi-family residential buildings (repair of roof, facade, refreshing the staircase, etc.); Accompanying construction works related to the implementation of energy efficiency measures and the corresponding recovery of the common parts of the building as a result of the implemented measures with energy saving effect. Accompanying construction works related solely to restore the original state, impaired due to renovation of the common areas and the replacement of windows in the separate building. The program will finance most cost-effective package of energy saving measures for the building, which achieves class energy "C" in accordance with Decree № 7 of 2004 on energy efficiency in buildings, not higher. The contract is aimed at the renovation of multi-family residential buildings, as it seeks through the implementation of energy efficiency measures to provide better living conditions for citizens in multifamily buildings, thermal comfort and higher quality of living environment. Implementation of energy efficiency measures in multifamily buildings will contribute to: a higher level of energy efficiency in multifamily buildings and reducing energy costs and improving performance to extend the life cycle of buildings; providing conditions of living environment in accordance with sustainability criteria.

Construction work

Община Бургас | Published August 19, 2016
Winner
„Строй груп инженеринг“ ЕООД, ЕИК: 202268878
cpvs

Eligible activities for funding under the buildings are: activities constructive restoration / enhancement / overhaul, depending on the damage occurred during the operation of multi-family residential buildings that are prescribed as mandatory for building the technical inspection; implementation of energy efficiency measures that are prescribed as mandatory for building in the energy audit; renovation of the common areas of multi-family residential buildings (repair of roof, facade, refreshing the staircase, etc.); Accompanying construction works related to the implementation of energy efficiency measures and the corresponding recovery of the common parts of the building as a result of the implemented measures with energy saving effect. Accompanying construction works related solely to restore the original state, impaired due to renovation of the common areas and the replacement of windows in the separate building. The program will finance most cost-effective package of energy saving measures for the building, which achieves class energy "C" in accordance with Decree № 7 of 2004 on energy efficiency in buildings, not higher. The contract is aimed at the renovation of multi-family residential buildings, as it seeks through the implementation of energy efficiency measures to provide better living conditions for citizens in multifamily buildings, thermal comfort and higher quality of living environment. Implementation of energy efficiency measures in multifamily buildings will contribute to: a higher level of energy efficiency in multifamily buildings and reducing energy costs and improving performance to extend the life cycle of buildings, providing conditions of living environment in accordance with sustainability criteria.