Call +44 800 9755 164

Public tenders for energy in Blagoevgrad Bulgaria

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyBulgariablagoevgrad

Construction work for multi-dwelling buildings and individual houses

Община Благоевград | Published November 4, 2016  -  Deadline December 12, 2016
In the subject this lot includes the design, exercising supervision and implementation of construction of a building intended for social housing from the selected contractor under the PPA. The design will ensure the preparation of an investment project which will be coordinated with relevant operating companies and delivered to the selected contractor to prepare a comprehensive report on the Evaluation of the investment projects with the essential building requirements pursuant to Art. 142, para. 6 pt. 2 of the SPA and Conformity assessment of investment projects with the essential requirements of Art. 169, para. 1, p. 6 of the SPA prepared under Ordinance № 7 of 2004 on energy efficiency, heat and energy savings in buildings required for approval of investment projects. Based on approved and coordinated investment projects will be issued permission for construction of the facility, subject to intervention. The beginning of construction works according to issued permission for construction will be considered day of drafting the protocol for opening the construction site and determining the construction line and level. After completion of construction, by building should ensure achieving energy class "B" according to Ordinance № 7 of 2004 on energy efficiency of buildings. In the execution of works will involve contracting, builder, designer, consultant, technical manager and an individual, exercising technical control for part "Construction" and suppliers. Players mentioned above will be liable under the powers provided for in the SPA.

Construction work

Община Благоевград | Published November 10, 2016

"Implementation of Engineering - design and execution of works, stage IV th - 70 lots and execution of construction works for 3 pcs. buildings - 3 OP or a total of 73 lots in the implementation of the National Programme for Energy Efficiency of Residential Buildings in the Municipality of Blagoevgrad. For lots 1 to 70 inclusive will prepare detailed design and implement construction works including: insulation of exterior walls, insulation of floors, roof insulation, window replacement, electrical, lightning and paint. For lots OP 71, OP 72 and OP 73 will perform construction works including: insulation of exterior walls, insulation of floors, roof insulation, window replacement, electrical, lightning and paint.

Development of a IV-you subregion, including rehabilitation and continues .. Additional provisions in VI.3

Община Благоевград | Published December 8, 2016  -  Deadline January 16, 2017
Development of IV-you subregion, including the rehabilitation and reconstruction of roads, energy saving lighting and landscaping near the street. "Vetren" to SWU "Neophyte Rilski" urbanization Street. "Maritza" in the section of the boulevard. "Demetrios" to str. "Ivan Mihailov" and construction of a cycle path connecting the boulevard. "St. Demetrios "street." Dame Gruev ", bul." Vasil Levski "boulevard." St. St. Cyril and Methodius "(the hotel" Alen Mak ") and from the street." Maritsa "Str." Ivan Mihailov "c. Blagoevgrad

Surface work for streets

Община Благоевград | Published December 9, 2016  -  Deadline January 13, 2017

Development of IV-you subregion, including the rehabilitation and reconstruction of roads, energy saving lighting and landscaping near the street. "Vetren" to SWU "Neophyte Rilski" urbanization Street. "Maritza" in the section of the boulevard. "Demetrios" to str. "Ivan Mihailov" and construction of a cycle path connecting the boulevard. "St. Demetrios "street." Dame Gruev ", bul." Vasil Levski "boulevard." St. St. Cyril and Methodius "(the hotel" Alen Mak ") and from the street." Maritsa "Str." Ivan Mihailov "c. Blagoevgrad.

Development of IV-you subregion, including the rehabilitation and reconstruction of roads, energy saving lighting and landscaping near the street. "Vetren" to SWU "Neophyte Rilski". Object: Blagoustr. Of IV mn incl. Rehabil. And rekonstr. Str., energ. St. illuminated. and landscaped. at p of the street. "Vetren" to SWU "Neophyte Rilski", Bl-city "street." Vetren "without pavement and without Trott. from km 0 +000 to km 0 + 468. From km 0 + 468 to km 0 + 570 is the same. asfaltobet. flooring and Trott. Str. "Homeland" street. "Ruen" street. "Independence" street. " compound "street." Black Sea "are without pavement and without Trott.

6 streets:

3% to pay. Movements .; novoproekt. lanes have a constr .: 4 cm thick asfaltobet. with E = 1300 MPa, 4 cm Hollow asfaltobet. with E = 950 MPa, 15 cm crushed. stone (15-25mm) with E = 450 MPa, 30 cm crushed. stone (0-63 mm) with E = 350 MPa ground base gasket. E = 30 MPa; same. asfaltobet. surface to be milled and covered with a match. 3-5cm layer of Hollow asfaltobet. 1 and 4 cm layer of thick asfaltobet.

3% to pay. Movements; novoproekt. lanes have a constr .: 4 cm thick asfaltobet. with E = 1300 MPa, 4 cm Hollow asfaltobet. with E = 950 MPa, 15 cm crushed. stone (15-25 mm) with E = 450 MPa, 30 cm crushed. stone (0-63 mm) with E = 350 MPa ground base gasket. E = 30 MPa.

3% to pay. Movements .; novoproekt. lanes have a constr .: 4 cm thick asfaltobet. with E = 1300 MPa, 4 cm Hollow asfaltobet. with E = 950 MPa, 15 cm crushed. stone (15-25 mm) with E = 450 MPa, 30 cm crushed. stone (0-63 mm) with E = 350 MPa ground base gasket. E = 30 MPa.

3% to pay. Movements .; novoproekt. lanes have a constr .: 4 cm thick asfaltobet. with E = 1300 MPa, 4 cm Hollow asfaltobet. with E = 950 MPa, 15 cm crushed. stone (15-25 mm) with E = 450 MPa, 30 cm crushed. stone (0-63 mm) with E = 350 MPa ground base gasket. E = 30 MPa.

30 cm crushed. stone (0-63 mm) with E = 350 MPa ground base gasket. E = 30 MPa.

5/40/40 cm; 5 cm-sand / trosh.kamak (fraktsiya0-5mm); 20 cm-crushed. stone (15-25mm fraction); Earth AHF. gasket. E = 30MRa. Surface. waveguides. is izv. by example. / nadl. Lining. on the road. Surface. (Min nadl. Lining. 0.5% k. Osig. Nadl. Suppl.).

Continues further information.

The 2 lanes and bounds. the canvas. to move. Nadl. Mark. in the road axis is broken. in teaching's of cr-state with others. St. fail and. passes. Vehicles to emphasis added. St. Pre. New Road H. svetlootr., II size. It is planned to build plumbing, acc. approved business projects.

2 m; e. Lining. 1 p. from 2.5% to pay. to move. In pass. of Bicycle. lanes in cr-za and entrance. same. asfal. pavement remains and Bicycle. Label alley. Mark. Pre. decreased. the creature. high curbs at the pass. of Bicycle. lanes in cr-za.

  • 1