Call +44 800 9755 164

Public tenders for energy in Bulgaria

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyBulgaria

Upgrading energy efficiency in multifamily buildings on the territory of Sofia Municipality area "Krasno Selo" in conjunction with "National Energy Efficiency Program

Столична община - район Красно село | Published April 24, 2017  -  Deadline May 31, 2017
cpvs
45000000

Upgrading energy efficiency in multifamily buildings on the territory of Sofia Municipality area "Krasno Selo" in conjunction with "National Program for Energy Efficiency of Residential Buildings" adopted by Decree № 18 / 02.02.2015g.

"Renovating for Energy efektivnostna multifamily buildings on the territory of Sofia Municipality area Ilinden, in conjunction with the" National Program for Energy efektivnostna multifamily

Столична община - район Илинден | Published April 24, 2017  -  Deadline May 29, 2017
cpvs
45000000

The object of this order are activities poobnovyavane energy efficiency in multifamily buildings on the territory of Sofia Municipality in conjunction with "National Energy Efficiency Program", namely a bl.69, located in the square. "Sugar Factory". The scope of the contract includes activities in design, construction, supervision, construction supervision and investment control.

"Implementation of works under the National Program for Energy Efficiency of Residential Buildings in Shoumen municipality approved project BG161PO001-1.2.01-0001" Energy renovation of the Bulgarians

Община Шумен | Published March 24, 2017  -  Deadline April 26, 2017
cpvs
45000000

"Implementation of works under the National Program for Energy Efficiency of Residential Buildings in Shoumen municipality approved project BG161PO001-1.2.01-0001" Energy renovation of Bulgarian homes "under the Operational Program" Regional Development "2007-2013, which to 31.12.2015 were not carried out construction works in three lots ": Lot 1:" Implementation of measures to improve the energy efficiency of residential buildings with address: c. Shumen, ul. "Patleina" № 6 " Lot 2: "Implementation of measures to improve the energy efficiency of residential buildings with address: c. Shumen, bul." Slavic ", bl. 7, ent. A, B and B '; Lot 3: "Implementation of measures to improve the energy efficiency of residential buildings with address: c. Shumen, ul." Hristo Smirnenski "№ 15".

"ENGINEERING - design, exercising supervision and execution of works / CPP introduction of energy efficiency measures under the project:" Energy renovation of multifamily buildings in gr.Dch

Кметът на Община град Добрич | Published April 3, 2017  -  Deadline May 9, 2017
cpvs
45000000

The subject of the contract to all lots, covering - implementation of engineering for nine multifamily buildings in Dobrich and includes: 1.Izgotvyane investment project in phase work to implement the most effective package of energy saving measures for the building ; 2.Izvarshvane of construction works and activities of the site, according to the report prepared by the Contractor agreed and approved by the respective order work projects; 3.Uprazhnyavane of supervision during the execution of works on site in resp tstvie with Art. 162, para. 2 and par. 3 of TDA. The contract is aimed at introducing highly energy-saving measures in buildings, considerably reducing the cost of electricity and heat and improving the quality of life of people living in them.

Maintenance of turbochargers of cogeneration facilities of Veolia Energy Varna EAD

Веолия Енерджи Варна ЕАД, /Предишно наименование - Далкия-Варна ЕАД, /Старо наименование - Топлофикация - Варна ЕАД/ | Published April 25, 2017  -  Deadline April 28, 2017
cpvs
50532300

Change in the date, time and place of opening of tenders: 03/05/2017, from 15:00. In the boardroom of Veolia Energy Varna EAD ul.Yanosh Hunyadi 5 Varna

"Implementation of energy efficiency measures in the school educational infrastructure in Veliko Turnovo" on lots:

Кмет на Община Велико Търново | Published April 7, 2017  -  Deadline May 12, 2017
cpvs
45200000

The object of this contract are buildings of five schools within the Municipality of Veliko Tarnovo within the scope of the project "Implementation of energy efficiency measures in the school educational infrastructure in the municipality of Veliko Tarnovo", on lots: OP №1 " implementation of energy efficiency measures in school "PRSlavejkov" V.Tarnovo " OP №2 "Implementation of energy efficiency measures in school" St. Patriarch Evtimii "V.Tarnovo"; OP №3 "Implementation of energy efficiency measures in school" Neofit Rilski "gr.Kilifarevo"; OP №4 "Implementation of energy efficiency measures in PMG" Vasil Drumev "V.Tarnovo"; OP №5 "Implementation of energy efficiency measures at Sofia University" Emilian Stanev "V.Tarnovo"; The types of works are under KSF and technical specifications for each position, an integral part of the documentation for participation.

Introduction of energy efficiency measures in multifamily buildings in CO-region "Vitosha" in conjunction with "National Program for Energy Efficiency of Residential Buildings

Столична община - район Витоша | Published April 3, 2017  -  Deadline May 9, 2017
cpvs
45000000

Introduction of energy efficiency measures in multifamily buildings in CO-region "Vitosha" in conjunction with "National Program for Energy Efficiency of Residential Buildings" adopted by Decree № 18 of 02.02.2015, on the lots: 1. Lot №1- Engineering (design and construction) "building an administrative address gr. Sofia 1618, jk Buxton Street. "Gen.Suvorov" № 28a bl. 41. 2. Lot №2 - Production conformity assessment of investment projects with the essential requirements for construction and construction supervision during the construction of "Building an administrative address gr. Sofia 1618, jk Buxton Street. "Gen.Suvorov" № 28a bl. 41. (a lot 1). 3. Lot № 3 -Investitorski control during design and construction of "Building an administrative address gr. Sofia 1618, jk Buxton Street. "Gen.Suvorov" № 28a bl. 41. (a lot 1).

Development, implementation, training and support of integrated information system for PODPOMAGANE MANAGEMENT OF THE NATIONAL PROGRAM FOR ENERGY EFFICIENCY of Multifamily Buildings

Министерство на регионалното развитие и благоустройството | Published April 24, 2017  -  Deadline May 30, 2017
cpvs
48810000

The system must provide integrated management and monitoring of processes and related documentation in connection with the implementation of the National Program for Energy Efficiency of Residential Buildings by helping municipalities, provinces, and associations of owners Works, Auer, BDB and MF, ensuring uniform information environment for data entry, tracking the stages of development, maintaining all documentation to the respective buildings in a geographical context and integrated maintenance of the set program in public records of contracts, associations of owners of applications and program progress. The system can also be used to build the collection and exchange between institutions of information, enabling timely / faster decision-making and other goals of energy efficiency policy and housing policy.

"Implementation of Engineering - design and execution of works for modernization, implementation of energy saving measures and building an accessible environment in the building of the school" St. Cyril and Methodius

Община Габрово | Published April 10, 2017  -  Deadline May 23, 2017
cpvs
45000000

Implementation of engineering - design, with supervision and construction - in connection with the repair, modernization, implementation of energy saving measures and building an accessible environment in the building of the primary school "Sv. St. Kiril I Metodiy "and the improvement of yard areas. The scope of design to this contract provides design and development of design solution for creative tailored to the needs and age of the users furnishing of classrooms and facilities in the school. Execution of construction works for the introduction of measures in the field of energy efficiency; public works - rehabilitation of yard space. Making supervision of construction activities.

WHS. repair and implementation of measures for energy. efficiency project "Updating image. and surrounding infrastructure. yard in schools and kindergartens in the city. Petrich "cont. in VI.3

община Петрич | Published April 24, 2017  -  Deadline May 30, 2017
cpvs
45000000

The activities included in the scope of contract are construction repairs to implement energy efficiency measures in three school buildings, a kindergarten and provided adjacent yards on the territory of Petrich. For the purposes of this order, namely the implementation of building - construction work sites of educational infrastructure - schools and kindergartens in Petrich are developed and approved investment projects under the relevant parts dealing with the implementation of the measures envisaged. These are available to stakeholders in porachkata.Ochakvani OUTCOMES: a higher level of energy efficiency in public buildings and reducing energy costs and improving performance to extend the life cycle of buildings; providing conditions of living environment in accordance with sustainability criteria.

Improving the energy efficiency of the building of The Institute of Metal, equipment and technologies with Center of Hydrodynamics "Acad. A. Balevski "- BAS

Институт по металознание, съоръжения и технологиис Център по хидро- и аеродинамика Акад.Ангел Балевски - БАН | Published April 25, 2017  -  Deadline May 29, 2017
cpvs
45000000

Improving the energy efficiency of the building of The Institute of Metal, equipment and technologies with Center of Hydrodynamics "Acad. A. Balevski "- BAS - Thermal insulation of external walls of the building; - Thermal insulation on the roof; - Replacement of the windows of the building; - Replacement of lighting fixtures in the building; - Replacement of the heating system of the building

Delivery of net active electric energy performer - coordinator of standard balancing group for low voltage, with complete administration of information flow with ESO and taking razho

Тракийски университет | Published April 7, 2017  -  Deadline May 16, 2017
cpvs
09310000

Delivery of net active electric energy performer - coordinator of standard balancing group for low voltage, with complete administration of information flow with ESO and defraying the imbalances for the needs of Trakya University c. Stara Zagora units. The object of the contract includes the supply of electricity - low voltage quality and procedures as provided for in the Energy Act (EA) and other applicable regulations that govern social relations associated with the delivery of electricity, including regulations to EA, Rules for trading electricity (PTEE) and rules for measuring the quantity of electricity (Pique). Duration of the contract award: 36 (thirty six) months from the date of confirmation by ESO as the first registered delivery schedule.

"Implementation of Engineering - design and execution of works for modernization, implementation of energy saving measures and building an accessible environment in the building of the school" Tcanko Dyustabanov "

Община Габрово | Published April 3, 2017  -  Deadline May 16, 2017
cpvs
45000000

Implementation of engineering - design, with supervision and construction - in connection with the repair, modernization, implementation of energy saving measures and building an accessible environment in the building of the primary school "Tcanko Dyustabanov" as well as improvement of yard areas within .In order It provides and reconstruction on the third floor of the school building at the Center for special educational support / TSSOP / as a single object. The scope of design to this contract provides design and development of design solution for creative tailored to the needs and age of the users furnishing of classrooms and facilities in the school. Execution of construction works for the introduction of measures in the field of energy efficiency; public works - rehabilitation of yard space. Making supervision of construction activities.

Choosing a contractor for engineering related to the implementation of the project "Improving the energy efficiency of buildings identifiers ... / under documentation for participation /.

Община Самоков | Published March 17, 2017  -  Deadline April 26, 2017
cpvs
45200000

Choosing a contractor for engineering related to the implementation of the project "Improving the energy efficiency of buildings identifiers: 65231.906.92.1, 65231.914.46.1, 65231.909.296.1 and 65231.909.296.2, 65231.914.149.1 and 65231.914.149.2, 65231.910.144.1, 65231.905 .49.1, 65231.907.42.1, 65231.911.234.1, 65231.910.141.1, 65231.905.11.2 and 65231.905.11.1, 65231.903.62.1 and 65231.903.62.2, 65231.905.86.1, 65231.909.359.1 ", in connection with the execution of the project № BG16RFOP001-2.001 -0167-C01 and annex № BG16RFOP001-2.001-0167-C02 to provide CCD OPRD 2014-2020 Priority 2 "Support for energy efficiency support centers in outlying areas." The engineering activities cover the following: activity I - Development of investment project phase "technical design", including the necessary working details for the needs of renovation; Activity II - Performance of works on realization of construction sites; Activity III - Exercise of supervision during construction.

Investigation of the establishment of technical specifications and preparation of technical passport and energy efficiency audits on NPEEMZHS ten lots

Община Габрово | Published April 10, 2017  -  Deadline May 29, 2017
cpvs
71200000

Investigation of the establishment of technical specifications and preparation of technical passport and energy efficiency audits under the National Program for Energy Efficiency of Residential Buildings in ten lots: Lot №1: c. Gabrovo, ul. Antim I № 15-17 Lot №2: c. Gabrovo, ul. Antim I 4 A B C Lot №3: c. Gabrovo bul. Aprilov № 62 Lot №4: c. Gabrovo, ul. Orlovska 136-140 Lot №5 : c. Gabrovo, ul. Petar Beron № 10-12 Lot №6: c. Gabrovo Square. Belarus 1 ent. And ent. B Lot №7: c. Gabrovo,. Mogilev № 3 Lot №8: c. Gabrovo, St. Peter Padalski № 1 Lot №9: c. Gabrovo, ul. Vanche Mikhailov № 17 Lot №10: c. Gabrovo, ul. Daskal Aleksi № 4 A B C D

Engineering (design, execution of works and carrying out supervision during construction) for upgrading the energy efficiency of NS "Aleko Konstantinov - 1884" and "Separeva house" p

Община Провадия | Published April 3, 2017  -  Deadline May 5, 2017
cpvs
45200000

The contract is funded under Priority Axis 2 "Support for energy efficiency support centers in outlying areas" OPRD 2014 - 2020, which is aimed at improving the energy. effectiveness of public and residential buildings. The scope of the contract includes the following activities: design, execution of works and the exercise of supervision by TDA. All activities should be carried out in accordance with current legislation, technical specifications, instructions MA of OPRD and instructions given in the technical and energy audits of the buildings included in the total. order. The building of the community center "Aleko Konstantinov - 1884", located on adm. address gr. Provadia, St. Tsar Liberator №67 has a total area - 972.35 m2 and total area - 2 472.46 m2 The building Sapareva house, located on adm. address gr. Provadia, St. Dr. Marco Saparev №6 has a total area - 254 square meters and total area - 508 square meters

Delivery of small oil-filled distribution transformers, hermetic type used in the sparsely populated areas in lots of energy needs - PRO Networks Corp.

ЕНЕРГО-ПРО Мрежи АД | Published April 10, 2017
cpvs
31170000

This contract provides for the supply of small oil-filled distribution transformers, hermetic type used in the sparsely populated areas in lots of energy needs - PRO Networks Plc. I. Lot - transformer oil sealed - 25 kVA / 20 / 0.4; II. Lot - transformer oil sealed - 50 kVA / 20 / 0.4;

"Conformity assessment of investment projects and construction supervision of eight residential buildings in Novi Pazar funded by the National Energy Efficiency Program ... Read First Section VI.3

Община Нови пазар | Published April 3, 2017  -  Deadline May 10, 2017
cpvs
71520000

Conformity assessment of investment projects and construction supervision of eight residential buildings in Novi Pazar funded by the National Program for Energy Efficiency of Residential Buildings (NPEEMZHS). The description continues in Section II.2 point II.2.4

Delivery of materials for carrying out the rehabilitation of the district heating network "Veolia Energy Varna" EAD: Lot 1: Supply of expansion joints. Lot 2: Design it

Веолия Енерджи Варна ЕАД | Published April 12, 2017  -  Deadline May 17, 2017
cpvs
44165210

Delivery of materials for carrying out the rehabilitation of the district heating network "Veolia Energy Varna" EAD: Lot 1: Supply of expansion joints. Lot 2: Design of heating networks

Periodic follow-up inspection metrology verification of measuring instruments / ultrasonic heat and water meters / installed in substations (AU) and production sites of Veolia Energy Varna EAD in Varna.

Веолия Енерджи Варна ЕАД, /Предишно наименование - Далкия-Варна ЕАД, /Старо наименование - Топлофикация - Варна ЕАД/ | Published April 18, 2017  -  Deadline May 11, 2017
cpvs
50410000

Opening bids of 17.05.2017g. from 09: 00h. in the boardroom of Veolia Energy Varna EAD, Varna, Hunyadi ul.Yanosh 5. The amounts of money for iamervane are within 4 / four / years.