Call +44 800 9755 164

Public tenders for energy in Bulgaria

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyBulgaria

Renovation for Energy Efficiency of Residential Buildings in the territory of Sofia Municipality area "Sunrise" in conjunction with "National Energy Efficiency Program of multi-family housing

Столична община - район Изгрев | Published February 20, 2017  -  Deadline March 21, 2017
cpvs
45000000

The object of this order are activities upgrading the energy efficiency of multifamily buildings on the territory of Sofia Municipality in conjunction with "National Energy Efficiency Programme" in lots.

"Construction work to increase the energy efficiency of residential buildings with 6 lots"

ОБЩИНА ПЕЩЕРА | Published February 24, 2017  -  Deadline April 7, 2017
cpvs
45000000

Subject of the contract covers the implementation of the "Construction works to increase the energy efficiency of residential buildings with 6 lots"

"Implementation of energy efficiency measures in the school educational infrastructure in the municipality of Veliko Tarnovo" on lots:

Кмет на Община Велико Търново | Published February 17, 2017  -  Deadline March 28, 2017
cpvs
45200000

The object of this contract are buildings of five schools within the Municipality of Veliko Tarnovo within the scope of the project "Implementation of energy efficiency measures in the school educational infrastructure in the municipality of Veliko Tarnovo" on lots: OP №1 " implementation of energy efficiency measures in school "PRSlavejkov" Veliko Tarnovo " OP №2 "Implementation of energy efficiency measures in school" Saint Patriarch Evtimii "Veliko Tarnovo" OP №3 "Implementation of energy efficiency measures in school" Neophyte Rilski "gr.Kilifarevo" OP №4 "Implementation of energy efficiency measures in PMG" Vasil Drumev "Veliko Tarnovo" OP №5 "Implementation of energy efficiency measures at Sofia University" Emilian Stanev "Veliko Tarnovo" The types of works are under KSF and technical specifications for each item integral part of the documentation for participation.

"Construction work to increase the energy efficiency of public municipal building, Municipal Children Complex" of Peshtera Municipality

Община Пещера | Published February 24, 2017  -  Deadline April 7, 2017
cpvs
45000000

Subject of the contract covers the implementation of the "Construction works to increase the energy efficiency of public municipal building, Municipal Children Complex" of Peshtera Municipality

PREPARING investigation to establish technical features associated with requirements of Art. 169 AL. 1 AND 3 LSP AND COMPLETION OF TECHNICAL PASSPORTS AND FOR AN ENERGY AUDIT ..

Общиина Карлово | Published February 16, 2017  -  Deadline March 20, 2017
cpvs
71315000

PREPARING investigation to establish technical features associated with requirements of Art. 169 AL. 1 and 3 of the SPA AND COMPLETION OF TECHNICAL PASSPORTS AND PREPARING energy efficiency audit of Multifamily Buildings in Karlovo municipality. The subject of this contract covers the below mentioned activities 26 the number of multifamily buildings, covered by NPEEMZHS: -Obsledvane buildings down technical specifications related to the requirements of Art. 169, para. 1 and 3 of the SPA and preparation of technical passports. -Obsledvane Energy efficiency of buildings and energy systems and prescription needed energy - saving measures (ECMs) in accordance with the statutory requirements for energy efficiency and certification under the Energy Efficiency Act.

"Implementation of engineering - design, execution of works and the exercise of supervision in the implementation of the project:" Renovation and implementation of energy efficiency measures in .....

Община Козлодуй | Published February 6, 2017  -  Deadline March 7, 2017
cpvs
45200000

... Lasts II.1.1) ... the building of the Municipal Office "Agriculture" in the town. Kozloduy. "In business engineering (design, with supervision and construction) project provides the selected contractor to prepare a working investment project detailed bills of quantities for the necessary types of work that are described in the energy audit as energy saving measures that lead to at least class of energy consumption "C" and activities constructively strengthen prescribed as mandatory in the technical inspection of the building. Execution measures related to improving access for persons with disabilities to buildings in accordance with Decree № 4 of 01.07.2009 for the design, construction and maintenance of buildings in accordance with the requirements for accessible environment for the population, including people with disabilities.

Engineering (design, execution of works and carrying out supervision during construction) for upgrading the energy efficiency of the building of the Municipal Administration - Provadia, fine

Община Провадия | Published February 16, 2017  -  Deadline March 22, 2017
cpvs
45200000

The contract is funded under Priority Axis 2 "Support for energy efficiency support centers in outlying areas" under the "Regions for Growth" 2014-2020, which is aimed at improving the energy efficiency of public and residential buildings. The scope of the contract includes the following activities: design, execution of works and the exercise of supervision by TDA. All activities should be carried out in accordance with current legislation, technical specifications, instructions MA of OPRD and instructions given in the technical and energy audit of the building of Municipal Administration - Provadia, which has a floor area 1248 square meters and total area of ​​4236 square meters

Engineering for the reconstruction, modernization and introduction of energy efficiency measures in Corpus of Chemical Technology and Metallurgy University town. Sofia

Химикотехнологичен и металургичен университет- гр. София | Published January 27, 2017  -  Deadline February 28, 2017
cpvs
45000000

Engineering for reconstruction, modernization and introduction of energy efficiency measures in buildings of UCTM includes design, construction works and supervision, which will be implemented according to the technical specifications of the Employer, the instructions in the documentation for participation, as well as relevant regulations.

"Implementation of measures for energy efficiency of street lighting in the complex" Slaveykov "complex" Zornitsa "and complex" Sunrise "Municipality" on lots:

Община Бургас | Published January 20, 2017  -  Deadline February 28, 2017
cpvs
34993000

"Implementation of measures for energy efficiency of street lighting in the complex" Slaveykov "complex" Zornitsa "and complex" Sunrise "Municipality" on lots: Lot 1: Introduction of energy efficiency measures street lighting in the complex "Zornitsa" - Burgas. Lot 2: Introduction of measures for energy efficiency of street lighting in the complex "Sunrise" - Burgas. Lot 3: "Introduction of measures for energy efficiency of street lighting in the complex" Slaveykov "- Burgas.

"Carrying out conformity assessment of investment projects, construction supervision and investment control over the construction works in connection with the renovation of energy is

Община Кърджали | Published February 20, 2017  -  Deadline March 23, 2017
cpvs
71521000

The subject of this contract covers the following activities: • Activity 1 - Conformity assessment of investment projects of multifamily residential buildings approved for participation in the "National Programme for Energy Efficiency of Residential Buildings"; Conformity assessment of investment projects to be carried out as a comprehensive report on the essential requirements of Art. 169, para. 1, p. 1-5 and par. 3 of the SPA, subject to the requirements of Art. 142, para. 5 of the SPA • Activity 2 - Supervision of works on construction work in connection with the renovation of energy efficiency in multifamily buildings approved for participation in the "National Programme for Energy Efficiency of Residential Buildings". • Activity 3 - Exercise of investment control over the construction works in connection with the renovation of energy efficiency in multifamily buildings approved for participation in the "National Programme for Energy

"Implementation of engineering - design, execution of works and the exercise of supervision in the implementation of the project:" Renovation and implementation of energy efficiency measures in .....

Община Козлодуй | Published February 17, 2017  -  Deadline March 20, 2017
cpvs
45200000

... Lasts II.1.1) ... residential buildings in the city. Kozloduy "in lots." In business engineering (design, with supervision and construction) project provides the selected contractor to prepare a business investment. projects with detailed kolichestv. Bills necessary for the types of work that are described in the energy audit as energy saving measures that lead to at least Class of energy consumption "C" and constructive activities resumed. / Bass prescribed as pledged. technically available. audits of buildings. Implementation of measures related to improving access for persons with disabilities to buildings in accordance with Regulation №4 from 01.07.2009 for the design, construction and maintenance of buildings in accordance with the requirements for accessible environment for the population, incl. for people with disabilities. Data on buildings subject to intervention., Specific activities and requirements of tracks. subject to public. order described in the Technical Specification.

"Choosing a contractor for engineering related to the implementation of the project" Improving energy efficiency in buildings identifiers ... / under documentation for participation /.

Община Самоков | Published January 30, 2017  -  Deadline March 15, 2017
cpvs
45200000

Choosing a contractor for engineering related to the implementation of the project "Improving energy efficiency in buildings identifiers: 65231.906.323, 65231.906.324, 65231.906.325, 65231.905.138.1, 65231.906.483.1, 65231.906.483.2, 65231.904.54.1, 65231.909 .312.1, 65231.911.299.1, 65231.905.135.1, 65231.908.28.1, 65231.906.212.1 ", in connection with the execution of the project № BG16RFOP001-2.001-0103-C01 to provide grant funding for OPRR 2014-2020 Priority 2" Support for energy efficiency support centers in outlying areas. " Engineering subject of the contract, covering the following activities: Activity I - Development of investment project in phase "technical design", including the necessary working details for the needs of renovation; Activity II - Performance of works on realization of construction sites; Activity III - Exercise of supervision during construction.

"ENGINEERING - design, supervision and execution of works on implementation of energy efficiency measures and repair of building RDPBZN (RS FSPP) - Dobrich town."

Община град Добрич | Published January 30, 2017  -  Deadline March 7, 2017
cpvs
45000000

The contract includes preparation of detailed design for the implementation of energy efficiency measures and repair of building RDPBZN (RS FSPP) in the city. Dobrich (total built-up area-2252,69 m2, area of ​​the basement-6082,04 m2, area-4272, 20 m2), based on: already drafted investigation under Article 48 energy efficiency Act (EEA) and technical passport (attached to the documentation of this contract); execution of works on implementation of energy efficiency measures and repair of building RDPBZN (RS FSPP) - Dobrich according to prepared and approved detailed design; implementation of supervision under Article 162 TDA.

"Implementation of Engineering - design and execution of works for modernization, implementation of energy saving measures and building an accessible environment in the building of the school" St. Cyril and Methodius

Община Габрово | Published January 23, 2017  -  Deadline March 10, 2017
cpvs
45000000

Implementation of engineering - design, with supervision and construction - in connection with the repair, modernization, implementation of energy saving measures and building an accessible environment in the building of primary school "Sv. St. Cyril and Methodius "and the cultivation of yards. The scope of design to this contract provides design and development of design solution for creative tailored to the needs and age of the users furnishing of classrooms and facilities in the school. Execution of construction works for the introduction of measures in the field of energy efficiency; public works - rehabilitation of yard space. Making supervision of construction activities.

"Carrying out works to improve energy efficiency" Plovdiv Language School "project, funded by the National Trust EcoFund / NTEF /"

Община Пловдив | Published January 27, 2017  -  Deadline March 2, 2017
cpvs
45000000

"Carrying out works to improve energy efficiency" Plovdiv Language School "project, funded by the National Trust EcoFund / NTEF /". Improving energy efficiency include: Thermal insulation of exterior walls, replacement of windows, insulation of the roof insulation of the floor - bay, replacement of the heating system, setting temperature drop and installation of solar collectors to provide hot water for domestic use. The total amount and volume according to the CSO and technical specifications integral part of the documentation for participation.

Implementation of Engineering of residential buildings in the town of Novi Pazar funded by the National Programme for Energy Efficiency of Residential Buildings (NPEEMZHS) 8 (eight) lots

община Нови пазар | Published January 26, 2017  -  Deadline March 8, 2017
cpvs
45000000

Subject to this order are multifamily residential buildings approved for renewal within the National Programme for Energy Efficiency of Residential Buildings that are funded under contracts for targeted funding between the Municipality of Novi Pazar, the Governor of Shoumen and "Bulgarian Bank development "JSC. Description of activities covered by the contract: 1. Development of detailed designs for the needs of renovation; 2. The execution of works for upgrading the energy efficiency of 8 multi-family residential buildings; 3. Exercise of the author's supervision during construction, according to the approved design documentation applicable regulations

"Choosing a contractor for engineering related to the implementation of the project" Improving energy efficiency in buildings identifiers ... / under documentation for participation /.

Община Самоков | Published January 30, 2017  -  Deadline March 13, 2017
cpvs
45200000

Choosing a contractor for engineering related to the implementation of the project "Improving energy efficiency in buildings identifiers: 65231.906.262.1, 65231.906.263.1, 65231.901.66.11 and 65231.906.66.12, 65231.905.445.1, 65231.908.62.1, 65231.905.189.1, 65231.905 .130.1, 65231.905.307.1, 65231.905.132.1, 65231.904.306.1, 65231.906.213.1, 65231.905.26.4 and 65231.905.26.5, 65231.904.203.1 and 65231.904.203.2 ", in connection with the execution of the project № BG16RFOP001-2.001-0107-C01 providing grant funding for OPRR 2014-2020, Priority 2 "Support for energy efficiency support centers in outlying areas." Engineering subject of the contract, covering the following activities: Activity I - Development of investment project in phase "technical design", including the necessary working details for the needs of renovation; Activity II - Performance of works on realization of construction sites; Activity III - Exercise of supervision during construction.

Design, exercising supervision, repair (SMR and ECM) project "Overhaul and implementation of energy efficiency measures in SfEg" Intellect "Pleven" (Engineering)

Община Плевен | Published February 6, 2017  -  Deadline March 17, 2017
cpvs
45200000

For SfEg "Intellect" - c. Pleven has not developed investment project in full design mode (incl. Construction permit), in view of which will be commissioned design phase "working draft", execution of works, the exercise of supervision during construction activities. The authors supervision will be carried out in accordance with Article 162 of the SPA of the authors of the detailed design, the respective parts. The building was made energy efficiency audits and issued Energy performance certificate № 083SLSH0145 / 13.09.2016 on the class of energy "G" and technical passport. Building SfEg "Intellect" - Pleven is located in regulated land plot III-667.1011, kv.34 no plan of the city. Pleven Administrative address gr. Pleven, JK "Druzhba" III-you subregion, №310 and municipal Act property №41336 / 07.10.2015, it consists of five massive hull, built in 1998 with a total area - 2708 square meters with adjoining land 20,258 square meters according adj. technical. behind. project.

"Engineering - design and execution of works to improve energy efficiency in the municipal building" Social Service "in the city of Cherven Bryag

Община Червен бряг | Published February 17, 2017  -  Deadline March 20, 2017
cpvs
45000000

"Engineering - design and execution of works to improve energy efficiency in the municipal building" Social Service "in the city of Cherven Bryag includes design, construction works and supervision. The engineering will improve the energy efficiency of municipal building "Social Service" in the city of Cherven Bryag, which will directly contribute to reducing final energy consumption and indirectly - to reduce greenhouse gas emissions in the town of Cherven Bryag. All activities should be carried out in accordance with current legislation, Tech. specification and methodological guidelines for the implementation of DBFP OP "Regions for Growth" 2014-2020, full information on the scope, size and performance requirements of the contract is fully described and regulated in Tech. specification integral part of this documentation published on the buyer profile on the website of the municipality.

"Implementation of engineering (design, execution of works and carrying out supervision during construction) for upgrading the energy efficiency of building RSPBZN - Provadia, fine

Община Провадия | Published February 24, 2017  -  Deadline March 30, 2017
cpvs
45200000

This common. order was announced and funded as a result of the concluded Adm. Contract № RD-02-37-6 from 04.01.2017 year, concluded between the Ministry of Regional Development and Public Works by Ch. Directorate "Urban and Regional Development" and Municipality Provadia to realize BG16RFOP001-2.001-0011-C01 "Improving the energy efficiency of the building of the Regional Office Fire Safety and Population Protection - Provadia" under Priority Axis 2 "Support for energy efficiency support centers in outlying areas. " The scope of the contract includes design, execution of works and carrying out supervision during construction by TDA. All activities should be carried out in accordance with current legislation, technical specifications, instructions MA of OPRD and prescriptions given in tech. and energy. audits of the building of the Regional Office Fire Safety and Population Protection - Provadia, located in the city. Provadia, St. Patriarch Evtimii №1