Public tenders for energy in Mol Belgium

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Call for application to participate - Creating and delivering a tube heat exchanger for geothermal energy station

VITO | Published November 3, 2016  -  Deadline December 6, 2016
cpvs
42511100

Creating and delivering a tube heat exchanger for geothermal energy station

Heat-exchange units

VITO | Published November 8, 2016  -  Deadline December 6, 2016
cpvs
42511100

Creating and delivering a tube heat exchanger for geothermal energy station.

Purchase and commissioning of two fire-resistant temperature cabinets and fireproof room

VITO | Published July 19, 2016  -  Deadline September 6, 2016
cpvs
38500000, 35111500, 38931000, 45343000, 45343100

Purchase and commissioning by VITO Energy Technology 2 fireproof temperature cabinets and fireproof area for testing batteries. The acquisition is included within the SolsTHOR project delivery in the Energyville building in Genk.

Credit granting services

VITO | Published July 28, 2015  -  Deadline August 25, 2015
cpvs
66113000

Location of the project: The project aims at VITO: - to focus the technical and non-technical challenges for the development of deep geothermal energy in Flanders; - To prove the economic feasibility of deep geothermal energy in Flanders; - To evaluate the social and ecological potential of geothermal energy in the Flemish energy system. The project Balmatt aims: - to tap an aquifer at a depth between 2900 and 3600 m; - The expected temperatures of from 120 ° C to attach to the top and 142 ° C at the base of the aquifer and the amount of water that can be pumped from there to be determined; - To optimize heat transfer from the deep aquifer; - To create the market conditions needed to geothermal plants roll out elsewhere in Flanders; - A business model to set up geothermal power plants. The result was a model of the subsurface to a depth of 4 km and a calculation of the expected temperature and volume to pumping up water. Critical parameters include the size of the reservoir, the potential temperature drop, and to produce the maximum flow rate. If the exploration drilling is successful, followed by a gradual expansion of the geothermal power plant: After this second bore a pump test again follows the flow rate and temperature are monitored and compared with the model data; After completion of these plants, the geothermal energy station is operational. For the 2nd bore is higher than the provisionally well design used which, on the basis of the drill test results and experiences from the 1st hole is adjusted if necessary. In addition, the contracting authority, insofar as possible, it will endeavor to make the decision as to whether or not award a second job (alone or together with subsequent commands) to take within 15 calendar days from the date of transfer of the test data of the first wellbore (15.12.2015). SOV Balmatt: Site Development Flanders (SOV) is responsible for the redevelopment of the site of the former company Balmatt Industries in Mol. For these possible 2nd hole may need a loan to be closed by SOV Balmatt

Call for applications - ENTERING INTO A LOAN FOR GEOTHERMAL PROJECT Balmatt site MOL

VITO | Published July 24, 2015  -  Deadline August 25, 2015
cpvs
66113000

Location of the project The project aims at VITO: • The technical and non-technical challenges for the development of deep geothermal energy in Flanders to focus; • The proving economic feasibility of deep geothermal energy in Flanders; • Evaluate the social and ecological potential of geothermal energy in the Flemish energiesys¬teem. The project Balmatt aims: • to tap an aquifer at a depth between 2900 and 3600 m; • The proper temperature of 120 ° C at the top and 142 ° C to attach to the base of the watervoe¬rende layer and to determine the amount of water that can be pumped out; • The heat extraction to optimize the deep aquifer; • to create the market conditions needed to geothermal plants roll out elsewhere in Flanders; • A business model to set up geothermal power plants. The result was a model of the subsurface to a depth of 4 km and a calculation of the expected temperature and volume to pumping up water. Critical parameters include the size of the reservoir, the potential temperature drop, and to produce the maximum flow rate. If the exploration drilling is successful, followed by a gradual expansion of the geothermal power plant: After this second bore a pump test again follows the flow rate and temperature are monitored and compared with the model data. After completion of these plants, the geothermal energy station is operational. For the 2nd bore is then used for the time being the well design which is adjusted if necessary, on the basis of the drill test results and experiences from the 1st hole. In addition, the contracting authority, insofar as possible, it will endeavor to make the decision as to whether or not award a second job (alone or together with subsequent commands) to take within 15 calendar days from the date of transfer of the test data of the first wellbore (15.12.2015). SOV Balmatt: Site Development Flanders (SOV) is responsible for the redevelopment of the site of the former company Balmatt Industries in Mol. For these possible 2nd bore shall submit a loan taken out by SOV Balmatt Probable starting date version bore 2 - 01.04.2016

Newly built school Gompel

Gemeente Mol | Published November 16, 2015  -  Deadline January 11, 2016
cpvs
45214210

Renewing and expanding the municipal primary school in Mol - Gompel. The existing school is adapted to current energy standards. Here the external joinery is replaced, the intermediate floors and roofs insulated and the roof redone. In order to ensure the accessibility of the school and to comply with the standards of the fire department there are new staircases on both sides of the school provided so that the escape routes to be ensured. The enlargement of the school includes new bathrooms, a refectory, a caring classroom, the teachers room, a covered play area, bicycle storage and a matching outdoor storage.

Mission complète d'étude et de suivi des travaux de Rénovation ie partially de l'envelope d'un immeuble de 104 logements sociaux sis rue Vlogaert 22 to 26 at 1060 Saint-Gilles dans une vision durable et écologique.

Foyer du Sud Scrl | Published July 22, 2015  -  Deadline September 7, 2015
cpvs
71000000

The mission is focused on the identification of a designer charged with the full contract for the study and monitoring of the work of partial renovation of the shell of the social building with 104 homes located in the Vlogaert Street 22 to 26 in 1060 Saint- Gillis observing a sustainable and ecological vision and approach. The aim of the project is: - different bouwpathologieën the windows, reducing the walls and the roof, taking into account the elements related thereto; - To improve the energy performance of the building in an optimal and economical manner. The budget of the work amounts to 1.415.000euro. For this contract, the contracting authority wishes to appoint an architect.

Credit granting services

Heilig Hartziekenhuis Mol | Published October 13, 2015  -  Deadline November 18, 2015
cpvs
66113000, 66000000

The HHart Hospital Mol has fleshed out with great energy in 2014 to the new mission: the development of a full base hospital close to the patient. With this goal in mind, we wish to continue working on an even better care. In order to further improve this care, the plant to invest in an additional HH Hospital Mol consultation building. By increasing the number of specialist doctors, there is indeed a need for additional consultation room. Additionally, the hospital invests in the purchase of a Spect CT. Finally, the hospital invests in the purchase of a C-arm. This assignment is subject to the adoption of a loan to finance these investments, in three separate lots.

Loans to finance various investments

Heilig Hartziekenhuis Mol | Published October 8, 2015  -  Deadline November 18, 2015
cpvs
66113000, 66000000

The HHart Hospital Mol has fleshed out with great energy in 2014 to the new mission: the development of a full base hospital close to the patient. With this goal in mind, we wish to continue working on an even better care. In order to further improve this care, the plant to invest in an additional HH Hospital Mol consultation building. By increasing the number of specialist doctors, there is indeed a need for additional consultation room. Additionally, the hospital invests in the purchase of a Spect CT. Finally, the hospital invests in the purchase of a C-arm. This assignment is subject to the adoption of a loan to finance these investments, in three separate lots.

Mission complète d'étude et de suivi des travaux d'amélioration des performances énergétiques des façades arrières des immeubles sis rue G. Combaz 10-14 16-18 et du bâtiment et de la toiture sis rue G. Combaz 16-18, ainsi que des travaux de rénovation de la cour d'intérieur située and îlot, dans une vision durable et écologique.

Foyer du Sud Scrl | Published July 22, 2015  -  Deadline August 18, 2015
cpvs
71000000

The mission is focused on the identification of a designer charged with the full contract for the study and monitoring of improvement works on the energy performance of the rear facades of the buildings located in the Gisbert Combazstraat 10 to 14 and 16 to 18, and it roof of the building located in the Gisbert Combazstraat 16 to 18, as well as the works of renovation of the courtyard situated behind the buildings, in the context of sustainable and ecological approach. The procedure follows two phases: Phase 1: Selection of candidates consequence of the publication of this announcement, candidates send a file containing the documents that enable qualitative selection. The candidate's technical capacity on the basis of the qualitative selection criteria geordeeld by an expert committee. Based on these criteria, the selection of the five candidates who will be able to make an offer. Phase 2: Description of the designer. Registration of the offers on the basis of the selection in the first phase. The budget for the work amounts 1.050.000euro excluding VAT, fees and other costs. For this contract, the contracting authority wishes to appoint a multidisciplinary team consisting of an architect and an EPB advisor if the option is explained. The EPB advisor assignment is a mandatory option.
  • 1