Public tenders for energy in Brunehault Belgium

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyBelgiumbrunehault

Invitation to submit offers - Relamping Hall Relais B211 of the Rue du Progrès, 1-7503 Froyennes - T1635TTO1 Market - B211 Code - Negotiated procedure with direct advertising

Agence Intercommunale IDETA scrl | Published August 30, 2016  -  Deadline September 20, 2026
cpvs
31000000

Launching a market for relamping a relay hall in the zoning of Tournai West 1 (The street B211 relay lobby progress 1-7503 Froyennes). Replacement of lighting aims to equip the hall with a powerful lighting system and oriented towards energy savings. This contract is divided into 3 positions and includes: 1. Dismantling the lighting, existing wiring and all obsolete elements related to lighting. 2. The mounting fixtures of the management system and accessories. 3. A comparative measurement campaign in full power in 2 workshops at 08h (the workshop and a landscaped undeveloped neighboring workshop). A site visit to hand offer is mandatory and set via phone (+32 69 / 55.35.25) or via email at: gtc@ideta.be. The contract documents are available until 12 September 2016 and free on request via the email address gtc@ideta.be.

HUMBUG SUPPLY

Ipalle | Published August 30, 2016  -  Deadline September 20, 2023
cpvs
44111100

This contract's purpose, according to the terms and conditions attached to the tender documents, the supply of refractory bricks for home boilers of energy recovery center Thumaide and for a period of one year from the conclusion the contract.

PiVert2: Replacing chassis, improving energy and surrender power level in 104 properties in Courcelles.

A Chacun Son Logis SCRL | Published August 31, 2016
cpvs
45311000, 45421150, 45311200, 45321000

The market is to renovate 104 housing. The work will be mainly the work of energy-saving but also safety: - chassis renewal; - Insulation of attic floor; - Insulation of roof overflows; - Basement ceiling insulation; - Handing power level; - Various. The work will be executed in occupied dwellings. Items containing asbestos (panels frame) will be handled and will require special attention. Social clauses are activated for this market. Voir CSC.

Invitation to submit offers - energy insulation work of the school "The Cascogniers" - Negotiated procedure with direct advertising

Ville de Herstal | Published August 31, 2016  -  Deadline October 20, 2004
cpvs
45320000

Works include the installation of insulation and coating with a plaster on all facades, removal of the metal structure of the roof and its existing pavement, installation of insulation and a new seal roof, the replacement of the entire exterior joinery + various finishes, the installation of a drive ventilation and extraction with adaptation of the existing hydraulic system.

Electricity supply in Walloon Public Service, the SOFICO and certain Public Actors Walloons - Period 2017-2019

RW-SpW-DGO2-DET-Direction des Etudes Techniques | Published September 13, 2016
cpvs
09310000

This contract is for the provision of low and high voltage electrical energy supply to addicts points of the Walloon Public Service (SPW) and SOFICO. The supply of electricity from certain points of provision of other public Actors Walloon (APW) is also part of this market. This is a joint market pursuant to Article 38 of the Law of 15 June 2006. The contract is divided into 4 lots: Lot 1: all high voltage powered sites (HT) infrastructure of DGO1 , the DGO2 and SOFICO.Lot 2: all low voltage powered sites (BT) infrastructure of DGO1, the DGO2 and SOFICO.Lot 3: all sites HT buildings DGT and APW.Lot 4: all BT sites and buildings DGT APW.L'ensemble four batches will be an offer to supply 100% renouvelable.Chaque lot is, as regards its implementation, a market separate. Tenderers may submit offers for one or more lots. The sale of the electricity generated by auto-producers sites Contracting Authority during the term of this contract is also part of this market.

Invitation to submit offers - Replacement of boiler and energy optimization of the boiler room at Pier Oyster - Negotiated procedure with direct advertising

Province du Brabant wallon - Parc des Collines - Bâtiment Archimède - | Published September 8, 2016  -  Deadline September 20, 2030
cpvs
42160000, 45331110

The contract involves: - replacing a Chaudière replacement of the dune colecteur- Assistant regulating placement of technical management centraliée - the replacement of the hot water

Placement and supply distributors, water meter and radio frequency energy. Service annual statements and allocation of costs

NOTRE MAISON scrl | Published September 6, 2016  -  Deadline October 20, 2024
cpvs
38551000, 71314200

Placement and supply distributors, water meter and radio frequency energy. Service annual statements and allocation of costs

Muséographique arrangement Lab Digital PASS

Parc d'aventures scientifiques | Published September 2, 2016  -  Deadline October 20, 2011
cpvs
39154000, 39100000

The Pass is a cultural facility dedicated to the dissemination of scientific and technical culture with the public covered 10,000m2 of interactive exhibits, workshops and performances and a 28 hectare park with museum devices. The Pass is for all public but especially target a young audience in the context of visits by family or school and recreational groups. It is located in Frameries, on the site of a former colliery reassigned and revitalized by an ambitious architectural project in 2000. The Pass is renovating its exhibition spaces and open in June 2015, a new exhibition space: Energy, the new rêves.Dans this perspective and for the implementation of the museum project, the Pass wants to enlist the services of a specialized service provider and experienced in arranging exhibitions for the general contractor will ensure public.Ce production and assembly of devices whose specifications are provided in the specifications and general technical clauses particulières.Le market has no lot. The service provider must encrypt all positions in this market.

Invitation to submit offers - Improving the energy performance of the day care center "The Farm" - Negotiated procedure with direct advertising

Les Services de l'APEM-T21 asbl | Published August 27, 2016  -  Deadline October 20, 2003
cpvs
45000000, 45215221

Improving the energy performance of the day care center "The Farmhouse" subsidized by the exceptional program UREBA

GLOBAL MISSION OF PROJECT AUTHOR PIVERT2 for technical and energy renovation of Champeaux residence comprising a set of 42 social housing units in 6061 Montignies-sur-Sambre

Société Wallonne du Logement | Published September 1, 2016  -  Deadline October 20, 2010
cpvs
71000000

Global Mission project author - Energy renovation and technical PIVERT2 of Champeaux Residence (42 social apartments) - Rue des Marais 51-6061 Montignies-Sur-SambreComprend architecture, stability, special techniques, Asbestos, security coordination and health

L. 132 - Breakpoint court-sur-Heure and L. 124 - Station Obaix-Buzet

Infrabel - Zone de Charleroi | Published September 1, 2016  -  Deadline October 20, 2006
cpvs
44321000

• The achievement of concrete bases for laying power boxes; • The establishment and fixation of boxes on their base; • The equipment in boxes and lighting sockets; • Transportation, setting up and fixing power charts • Achieving earth (loop) with cabinet; • The installation of gutters; • laying cables; • the power with the energy supplier.

HOUFFALIZE BASTOGNE-AR Ugly Meadows Road Libramont, 18-6660 HOUFFALIZE. Replacement of lighting fixtures.

Direction régionale du Luxembourg | Published August 24, 2016
cpvs
45310000

.More Replacing light fixtures in detail, the work comprises: Lot 1: Replacement of lighting to enhance the energy performance of buildings 043-10 and 043-06 to the CA HOUFFALIZE. The company includes: -The realization of the lighting study to meet the conditions subsidiassions for investments improving the energy performance of a building; -The Holding of construction documents; -The Participation in site meetings and drafting of construction meeting minutes; -The Provision of equipment necessary for the proper execution of the works; -The Labor required, as well as all relevant constraints in the perfect realization of the work according to these requirements; -The Installation, connection, commissioning hardware service; -The Tightening of openings, touching up paint and resserements resistant Rf fire; -The Cleaning of the site being local and the complete cleaning of the premises at the end of construction; -The Participation in the provisional acceptance tests; -The Realization and supply of end of construction documents and as-built plan; -The Benefits of interviews and repair during the warranty period.

HOUFFALIZE BASTOGNE-AR Ugly Meadows Road Libramont, 18-6660 HOUFFALIZE. Replacement of lighting fixtures.

Direction régionale du Luxembourg | Published August 24, 2016  -  Deadline September 20, 2028
cpvs
45310000

.More Replacing light fixtures in detail, the work comprises: Lot 1: Replacement of lighting to enhance the energy performance of buildings 043-10 and 043-06 to the CA HOUFFALIZE. The company includes: -The realization of the lighting study to meet the conditions subsidiassions for investments improving the energy performance of a building; -The Holding of construction documents; -The Participation in site meetings and drafting of construction meeting minutes; -The Provision of equipment necessary for the proper execution of the works; -The Labor required, as well as all relevant constraints in the perfect realization of the work according to these requirements; -The Installation, connection, commissioning hardware service; -The Tightening of openings, touching up paint and resserements resistant Rf fire; -The Cleaning of the site being local and the complete cleaning of the premises at the end of construction; -The Participation in the provisional acceptance tests; -The Realization and supply of end of construction documents and as-built plan; -The Benefits of interviews and repair during the warranty period.

PiVert2: Replacing chassis, improving energy and surrender power level in 104 properties in Courcelles.

A Chacun Son Logis SCRL | Published August 24, 2016  -  Deadline October 20, 2005
cpvs
45311000, 45421150, 45311200, 45321000

The market is to renovate 104 housing. The work will be mainly the work of energy-saving but also safety: - chassis renewal; - Insulation of attic floor; - Insulation of roof overflows; - Basement ceiling insulation; - Handing power level; - Various. The work will be executed in occupied dwellings. Items containing asbestos (panels frame) will be handled and will require special attention. Social clauses are activated for this market. Voir CSC.

Retrofit of boiler 5 in Farciennes

Igretec | Published August 26, 2016
cpvs
45331100

Improving the energy performance of boilers to 5 Farciennes

Supply and delivery of a forklift truck and its accessories (position 1) and maintenance contract omnium (position 2) for the division of Pierre Soignies

Institut du Patrimoine wallon | Published September 14, 2016  -  Deadline October 20, 2026
cpvs
42415100

The market for the acquisition of a forklift (and accessories), energy efficient, sustainable and adapted to the specific needs of the user (position 1) and maintenance (omnium contract - item 2) for 5 years. Item 1 is the subject of a européen.Le truck financing is intended for use on the site of the future Center of Peter, the training center for the stone trades under development in Soignies. It will be used for moving and lifting of base materials used for training (stones, other heavy materials on pallets) inside the workshops and outside (concrete and gravel soils). The terms of use are detailed in the technical specifications.

Purchase and Sale of ELECTRICITY, linked to energy plant in Pont-de-Loup

ICDI | Published August 11, 2016
cpvs
09300000

Purchase and Sale of ELECTRICITY, linked to energy plant in Pont-de-Loup

PiVert2: Replacing chassis, improving energy and surrender power level.

A Chacun Son Logis SCRL | Published August 10, 2016
cpvs
45311000, 45421150, 45311200, 45321000

The market is to renovate 104 housing. The work will be mainly the work of energy-saving but also safety: - chassis renewal; - Insulation of attic floor; - Insulation of roof overflows; - Basement ceiling insulation; - Handing power level; - Various. The work will be executed in occupied dwellings. Items containing asbestos (panels frame) will be handled and will require special attention. Social clauses are activated for this market. Voir CSC.

Development and operation of TIMES model in Wallonia

RW-SpW-DGO4-DPED-direction de la promotion de l'énergie durable | Published August 13, 2016  -  Deadline July 20, 2018
cpvs
71314000

This contract aims to support the Walloon government (Department of Energy and Sustainable Building of the DGO4) in the development and operation of the optimization model TIMES the Walloon scale in order to analyze regionally baseline scenario and explore alternative scenarios in strategic consulting purposes, at least for 2020, 2030 and 2050. the model will be used in particular to define objectives and lower cost optimal paths and to define optimal policies and measures to be Work in Wallonia. The mission will be one hand to develop the model and simulate different scenarios (tasks 1 and 2) and secondly to assist the Administration in its use of the model, in participation in ETSAP network and some specific issues ( tasks 3 through 5).

energy retrofit 90 social housing - 2 Pivert

La Ruche Chapelloise | Published August 5, 2016  -  Deadline September 20, 2030
cpvs
45000000

energy retrofit 90 social housing - 2 Pivert