Public tenders for energy in Brunehault Belgium

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyBelgiumbrunehault

Adaptation work of HVAC installations and work on increasing the power output of ice water.

Brussels South Charleroi Airport SA | Published November 27, 2015  -  Deadline December 17, 2015
cpvs
45331000, 45331210, 45331220, 45331230, 45331200

Part 1: Construction adaptation of HVAC installations: storage areas, security control, departure lounge, arrivals hall ... Including: Studies of: - Installations ventilation, hydraulic and existing power; - Calculation Eudes and stability elements for the installation of structures and equipment; - Studies and ventilation and hydraulic calculations for the installation of various equipment; The realization of: - ventilation construction plans, hydraulic and electrical; - Control of execution studies of all control office facilities by SECO (SECO fees charged to the MO); - Calculations and commitment on the energy performance of facilities; - Testing and acceptance of the installations; - Plans have built the installation of: - 4 new air preparation groups rated at +/- 33 000 m³ / h each to complement the current flow 44.000m³ / h, - active carbon filters these groups - 4 heat pumps and cooling towers associated 4 for heating and cooling the additional air in the premises, - The hydraulic connections and ventilation groups and heat pumps - Control and regulation of groups and pump Heat - The adaptation of the steering groups of regulation and heat pumps Part 2: Works of increasing the power output of ice water and addition of a new high-voltage cabin Includes: Studies on: - existing hydraulic and electrical installations; - Design and calculation of stability elements for laying structures and equipment; - Studies and hydraulic and electrical calculations for the installation of various equipment; The realization of: - hydraulic and electrical implementation plans; - Control of execution studies of all control office SECO by facilities; - Calculations of e ...

PiVert2: Replacing chassis, improving energy and surrender power level.

A Chacun Son Logis SCRL | Published August 5, 2016
cpvs
45311000, 45421150, 45311200, 45321000

The market is to renovate 104 housing. The work will be mainly the work of energy-saving but also safety: - chassis renewal; - Insulation of attic floor; - Insulation of roof overflows; - Basement ceiling insulation; - Handing power level; - Various. The work will be executed in occupied dwellings. Items containing asbestos (panels frame) will be handled and will require special attention. Social clauses are activated for this market. Voir CSC.

Works under the PPT 2014: repairs to school Awirs 222

Flémalle | Published August 5, 2016  -  Deadline September 20, 2005
cpvs
45000000

• Complete renovation of bathrooms: rearrange the space, create a breakdown, isolate, to electrical compliance, replace hazardous metal doors, etc. • Compliance fire: replace the wooden staircase to recreate an issue for the evacuation of occupants. • from a technical standpoint, the studied and prescribed equipment is provided to generate a minimum energy consumption and to minimize operating and maintenance costs, while respecting sustainable development while ensuring ROI technologies implemented and taking into account the users exact requirements.

DMP1600601 - Gas Elec: contract to supply and gas for all sites Forem

Office Wallon de la formation professionnelle et de l'emploi | Published August 5, 2016  -  Deadline October 20, 2003
cpvs
09000000

This contract is for the provision of power and supply of electric energy in high and low voltage and the supply of gas on average and low pressure, the sampling points of the Forem, included in the list attached to this special specifications (Inventory information on sampling points) .Note: the points of collection and the delivery clauses are provided see schedule attached to these specifications charges.La list of sampling points is likely evolving. If other sampling points than those listed (see annex) attached to this tender documents were to appear, these can be added to the market on the same terms (price formulas of the parameters).

Supply contract for the rental of multifunction copiers and production copiers for our copy center, including a maintenance contract omnium and management software.

Igretec | Published August 5, 2016  -  Deadline June 20, 2014
cpvs
30120000

supplies rental contract covering multifunction copiers to distribute our various operating sites and production copiers for our copy center, including a maintenance contract omnium and software gestion.Le content market and its general execution context are developed in the technical part (part C) specifications charges.Le market consists of two parts: - part A: rental of multifunction copiers floor- part B: leasing production for our copiers copy center. AThe party contract is intended to meet the needs of the intermunicipal for multifunction copiers during a period of 4 years. The initial contract is for the rental of 14 multifunction copiers same again on our various sites: 6 SOLEO IGRETEC (HEADQUARTERS) - Bd Mainz, 16000 CHARLEROI3 EOLE BUILDING EOLE - Rue des Frères Wright, 29, 6041 GOSSELIES1 TELECOM BUILDING TELECOM - Avenue Georges Lemaître 21 6041 sTOP sTOP GOSSELIES1 ENERGY - Avenue General Michel, 1E 6000 CHARLEROI2 MONTIGNIES / S / S TREATMENT PLANT MONTIGNIES / S / S - Chaussee de Charleroi 401 6061 CHARLEROI1 PHENIX in front of No. 25 Boulevard Mainz 6000 CHARLEROI Party BThe market for the rental of three copiers (color and 2 1 B & amp; B) and finishing with software management for our copy center.

Works contract for structural work closed for construction of the new building of the headquarters of ORES cvba on the site of the Aéropôle Gosselies

Intercommunale ORES Assets scrl | Published August 5, 2016  -  Deadline June 20, 2003
cpvs
45210000

This contract for the performance of the closed main structure works for the construction of the new building of the headquarters of ORES cvba on the site of the Aéropôle (Avenue Jean Mermoz) in Gosselies. The building has two floors of offices, a ground floor "Community Zone" and a semi-buried basement with an open parking. The building, with an area of ​​approximately 13,500 m2, will consumption (withdrawal) of nearly zero-energy (geothermal, solar panels, low-loss building, ...). This building must affirm a will to modern corporate citizen, be a reference in the rational use of energy and water and in terms of ergonomics, use the latest techniques in isolation, ventilation, cooling, use of natural light and modularity, integrating sources of renewable energy and require a limited operating budget. In short, this building will be sustainable construction model and satisfy the VALIDEO repository.

legal services market of debt collection in judicial phase

Intercommunale ORES Assets scrl | Published August 5, 2016  -  Deadline September 20, 2016
cpvs
79100000

The recovery by judicial process of claims relating to the contracting authority activity. These services include: • Representation of the contracting authority from the courts • The designation and monitoring of bailiffs according to their jurisdictions so that they carry out a screening of debtors (location, evaluation of creditworthiness) quotations and enforcement of judgments that the contracting authority considers favorable to its interests. These receivables correspond to unpaid bills at the time of contract award and to be issued for the duration of it. These receivables relate to work carried out by the contracting authority as well as energy supplies by the contracting authority.

Extension of the institute DON BOSCO - Construction of a new building

INSTITUT DON BOSCO asbl. | Published August 5, 2016  -  Deadline April 20, 2013
cpvs
45000000, 45200000, 45400000, 45300000

The institute DON BOSCO wishes to expand its facilities on its site of Val d'Or in Woluwe-Saint-Pierre by the construction of a new building for 3,450 m2 of new classrooms and ancillary rooms dedicated teachers, 350 m2 of joinery workshop PVC / ALU, 320 m2 of technical basements and premises, with all construction to nearly 4,100 m2. As a corollary, the management wants to adapt the surroundings to enlarge the playground and build a yard of about 250 m2. The building is meant high energy performance and is the classification zero energy building. It will consist of a frame steel / concrete, concrete floors and walls to wood framing. All the siding will be fiber cement. The contract involves the supply of materials and services to the complete construction, general contractor of the building, structural work, technical and finishings as well as its surroundings.

Service contract for scientific support and guidance of the review procedure and Energy Certification of existing residential buildings for the 2016-2017 year.

RW-SpW-DGO4-DBD-Direction des Batiments durables | Published August 5, 2016  -  Deadline December 20, 2002
cpvs
71000000

Le présent marché a pour objet des services à prix global qui visent l'accompagnement scientifique et la guidance technique des auditeurs PAE 2 et des certificateurs PEB de bâtiments résidentiels existants. L'intention est de désigner 1 prestataire de services. Le marché est composé d'un seul lot regroupant différentes missions regroupées en trois parties. 1) La guidance relative à la PAE2 (Procédure d'Avis Energétique) qui comporte les tâches suivantes : Tâche 1.1 : assurer l'actualisation continue de la méthode de calcul, du logiciel et des documents connexes (rapports d'audits, contenu de la formation et brochures explicatives). Cette tâche consiste notamment en : - L'adaptation de la méthode de calcul " PAE 2". - L'adaptation des différents rapports d'audit " PAE 2". - Le suivi des développements logiciels relatifs aux adaptations. Tâche 1.2 : Assurer la guidance des formateurs et des auditeurs PAE 2. La guidance des formateurs et des auditeurs comprend les missions suivantes : - Répondre aux questions des formateurs et des auditeurs PAE 2. - Participer à des réunions de concertation. - Actualiser les documents de référence. - Participation à d'autres actions (séminaires, études statistiques, ...). 2) La guidance relative à la certification PEB des unités résidentielles qui comporte les tâches suivantes : Tâche 2.1 : Support 1er ligne, facilitateur certification de 1ère ligne Le support de facilitateur certification 1er ligne liées consiste à : - Informer et sensibiliser. - Assurer la guidance des certificateurs PEB agréés. - Participation à des réunions de concertation. Tâche 2.2 : Support 2éme ligne, facilitateur certification seconde ligne Le support de 2éme ligne de la certification consiste en : - Adaptation de la méthode de calcul " certification ". - Répondre aux questions émanant des " Facilitateurs de 1ère ligne ". - Suivre les développements logiciels. - La participation aux réunions des " Facilitateurs certification ". - L'actualisation continue des documents de référence pour la certification PEB. - Adaptation du certificat et rapport partiel. - Rédaction des spécifications et suivi des développements logiciels relatifs à ces adaptations. - Participation à d'autres actions (séminaires, études sur la base de données, ...). 3) La coordination qui comporte les tâches suivantes : Tâche 3.1 : coordination générale Ce poste comprend la coordination générale du projet qui comporte la coordination pratique, administrative et financière du projet ainsi que la coordination avec les éventuels sous-traitants. Il comporte également la rédaction des PV de réunion de travail entre les partenaires. Tâche 3.2 : comités d'accompagnement Ce poste comprend la participation aux réunions trimestrielles de comité d'accompagnement ainsi que la rédaction des PV et des rapports d'activités. Un comité d'accompagnement sera institué dès la notification du présent marché. Lors de chaque comité d'accompagnement, les travaux réalisés, en cours de réalisation ou à réaliser seront débattus.

Establishment of a renewable energy electric Facilitator (wind, solar, hydro) and cogeneration

RW-SpW-DGO4-DPED-Direction de la Promotion de l'énergie durable | Published August 5, 2016  -  Deadline February 20, 2018
cpvs
98110000

The contract is to ensure the mission of Facilitators, in Wallonia, for electric renewable sectors (Wind, Photovoltaic, Hydro) and cogeneration, for the benefit of investors, engineering, business and the public sector ( including the Walloon administration). The mission is based on expertise, assistance, guidance and information to promote electric renewable energy and cogeneration.

Establishment of a legal framework for the development of deep geothermal energy in Wallonia

Cabinet du Ministre des Pouvoirs Locaux, de la Ville, du Logement et de l'Energie | Published August 5, 2016
cpvs
79110000

Establishment of a legal framework for the development of deep geothermal energy in Wallonia

PNDAP: Establishment of a legal framework adapted to the development of deep geothermal energy in Wallonia

Cabinet du Ministre des Pouvoirs Locaux, de la Ville, du Logement et de l'Energie | Published August 5, 2016
cpvs
79110000

Establishment of a legal framework for the development of deep geothermal energy in Wallonia

Establishment of a legal framework for the development of deep geothermal energy in Wallonia

Cabinet du Ministre des Pouvoirs Locaux, de la Ville, du Logement et de l'Energie | Published August 5, 2016  -  Deadline September 20, 2015
cpvs
79110000

Establishment of a legal framework for the development of deep geothermal energy in Wallonia

Performing an assessment of recent reforms of premiums and loan system "Energy and Housing"

IWEPS | Published August 5, 2016  -  Deadline September 20, 2016
cpvs
75000000

The purpose of this contract is to provide an assessment of the reforms of premiums and loans system "Energy and Housing", occurred respectively in 2015 and 2016, to answer the following questions: 1. What is the effect of the reform of premiums and loans "Energy and Housing" on the use of target groups (households with modest incomes) to these devices? 2. To what extent the policies implemented are they affected by windfall and negative effects? The purpose of evaluation, context, data and methodologies as well as the work program are presented in detail in Section II . Description of the technical requirements of the specifications.

babysitting services - Negotiated procedure with direct advertising

ICDI | Published August 5, 2016  -  Deadline July 20, 2020
cpvs
79713000

Purpose of Services: Services of gardiennage.Le This contract relates to mobile and static security service benefits, under Category 23 - Investigation and security services - of Annex IIB of the law of 15 June 2006 relating to publics.Lieu markets of service delivery: All sites ICDILes static guard services take place at the headquarters of the inter street Weir 1-6010 Couillet.Les mobile care benefits are made as for them on all the inter sites, mainly but not limited to the head office of the intermunicipal street Weir 1-6010 Couillet, the recycling parks and the energy recovery unit (also called incinerator) .L'adresse incinerator is Port of Praye, 1-6250 Pont-de-Loup. The recycling parks addresses are: • Rue du Terril 27-6150 Anderlues • Alley Valerian 26-7160 Chapelle-lez-Herlaimont • Rue de Marcinelle 26-6010 Couillet • Street Destrée in 6043 Ransart • Châtelet Road in 6010 Couillet • Coron Street Chasm 67-6200 Châtelineau • Rue de Binche 152-6180 Courcelles • Rue de Mellet 11-6220 Fleurus • Rue du Petria to 6140 Fontaine-the Bishop • Rue Jean Joseph Piret 100-6280 Joncret • Path of 'Hamlet in 6120 Ham-sur-Heure / Nalinnes Rue du • Gift 3-6210 Frasnes-lez-Gosselies • path Falgeotte 2-6111 Landelies • station in Luttre Luttre 6238

Call for proposals for enhancing the energy potential of the public domain through the exploitation of wind turbines on motorway parking areas

Société wallonne de Financement complémentaire des Infrastructures | Published August 5, 2016  -  Deadline October 20, 2018
cpvs
98390000

The contract is to conclude service concession contracts for the installation and operation of such facilities "big wind", that is to say, with a unit capacity equal to or greater than 1 MW on motorway parking areas of structuring roads of Wallonia.

Prospecting for the recovery of the energy potential of road and river areas of SOFICO

Société wallonne de Financement complémentaire des Infrastructures | Published August 5, 2016
cpvs
98000000

Call for applications for participation - LENS - Replacement of joinery and painting cornices of the town hall of Lens

Commune de Lens | Published August 5, 2016  -  Deadline September 20, 2019
cpvs
45421000

This contract involves the replacement of all exterior woodwork and painting the eaves and dormers of the communal house of Lens to improve the energy performance of the building.

energy retrofit 90 social housing - 2 Pivert

La Ruche Chapelloise | Published August 5, 2016  -  Deadline September 20, 2030
cpvs
45000000

energy retrofit 90 social housing - 2 Pivert

Purchase and Sale of ELECTRICITY, linked to energy plant in Pont-de-Loup

ICDI | Published August 9, 2016
cpvs
09300000

Purchase and Sale of ELECTRICITY, linked to energy plant in Pont-de-Loup