Public tenders for energy in Brunehault Belgium

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyBelgiumbrunehault

Invitation to submit offers - Replacement of boiler and energy optimization of the boiler room at Pier Oyster - Negotiated procedure with direct advertising

Province du Brabant wallon - Parc des Collines - Bâtiment Archimède - | Published September 8, 2016  -  Deadline September 20, 2030
cpvs
42160000, 45331110

The contract involves: - replacing a Chaudière replacement of the dune colecteur- Assistant regulating placement of technical management centraliée - the replacement of the hot water

energy retrofit 90 social housing - 2 Pivert

La Ruche Chapelloise | Published August 5, 2016  -  Deadline September 20, 2030
cpvs
45000000

energy retrofit 90 social housing - 2 Pivert

HOUFFALIZE BASTOGNE-AR Ugly Meadows Road Libramont, 18-6660 HOUFFALIZE. Replacement of lighting fixtures.

Direction régionale du Luxembourg | Published August 24, 2016  -  Deadline September 20, 2028
cpvs
45310000

.More Replacing light fixtures in detail, the work comprises: Lot 1: Replacement of lighting to enhance the energy performance of buildings 043-10 and 043-06 to the CA HOUFFALIZE. The company includes: -The realization of the lighting study to meet the conditions subsidiassions for investments improving the energy performance of a building; -The Holding of construction documents; -The Participation in site meetings and drafting of construction meeting minutes; -The Provision of equipment necessary for the proper execution of the works; -The Labor required, as well as all relevant constraints in the perfect realization of the work according to these requirements; -The Installation, connection, commissioning hardware service; -The Tightening of openings, touching up paint and resserements resistant Rf fire; -The Cleaning of the site being local and the complete cleaning of the premises at the end of construction; -The Participation in the provisional acceptance tests; -The Realization and supply of end of construction documents and as-built plan; -The Benefits of interviews and repair during the warranty period.

Supply and delivery of a forklift truck and its accessories (position 1) and maintenance contract omnium (position 2) for the division of Pierre Soignies

Institut du Patrimoine wallon | Published September 14, 2016  -  Deadline October 20, 2026
cpvs
42415100

The market for the acquisition of a forklift (and accessories), energy efficient, sustainable and adapted to the specific needs of the user (position 1) and maintenance (omnium contract - item 2) for 5 years. Item 1 is the subject of a européen.Le truck financing is intended for use on the site of the future Center of Peter, the training center for the stone trades under development in Soignies. It will be used for moving and lifting of base materials used for training (stones, other heavy materials on pallets) inside the workshops and outside (concrete and gravel soils). The terms of use are detailed in the technical specifications.

Invitation to submit offers - Relamping Hall Relais B211 of the Rue du Progrès, 1-7503 Froyennes - T1635TTO1 Market - B211 Code - Negotiated procedure with direct advertising

Agence Intercommunale IDETA scrl | Published August 30, 2016  -  Deadline September 20, 2026
cpvs
31000000

Launching a market for relamping a relay hall in the zoning of Tournai West 1 (The street B211 relay lobby progress 1-7503 Froyennes). Replacement of lighting aims to equip the hall with a powerful lighting system and oriented towards energy savings. This contract is divided into 3 positions and includes: 1. Dismantling the lighting, existing wiring and all obsolete elements related to lighting. 2. The mounting fixtures of the management system and accessories. 3. A comparative measurement campaign in full power in 2 workshops at 08h (the workshop and a landscaped undeveloped neighboring workshop). A site visit to hand offer is mandatory and set via phone (+32 69 / 55.35.25) or via email at: gtc@ideta.be. The contract documents are available until 12 September 2016 and free on request via the email address gtc@ideta.be.

Placement and supply distributors, water meter and radio frequency energy. Service annual statements and allocation of costs

NOTRE MAISON scrl | Published September 6, 2016  -  Deadline October 20, 2024
cpvs
38551000, 71314200

Placement and supply distributors, water meter and radio frequency energy. Service annual statements and allocation of costs

HUMBUG SUPPLY

Ipalle | Published August 30, 2016  -  Deadline September 20, 2023
cpvs
44111100

This contract's purpose, according to the terms and conditions attached to the tender documents, the supply of refractory bricks for home boilers of energy recovery center Thumaide and for a period of one year from the conclusion the contract.

Improving energy performance infrastructure PASS - ROOF and FACADE Lampisterie

Parc d'aventures scientifiques | Published August 12, 2016  -  Deadline September 20, 2020
cpvs
45261910, 45261410

Improving the energy performance of PASS infrastructure. This is to replace: - the southern slopes of polycarbonate covering roofs in sheds with windows and / or sandwich panels ..- canopies polycarbonate roof panels by Annex sandwich.- polycarbonate closures East façade of the bay by frame and sandwich panels. The present work includes, but not limited to, the following set of specialties and services: Part 0 - General - All means of shoring, scaffolding, various protections (safety, sealing, ....) necessary for the achievement of works; - Installation and site management. Part 1 - Covers- work for removing the cover elements in polycarbonate roofing and removing electric blinds - the roofing of a slope roofs in sheds (sandwich panels, skylights, valleys, shores of connections seal for liquids and air); Part 2 - Closures / extérieures- finishes the work of removing polycarbonate front closure elements and removal of electric blinds - the closing work of a curtain wall (sandwich panels, frames, sills, banks, fittings seal for liquids and air);

babysitting services - Negotiated procedure with direct advertising

ICDI | Published August 5, 2016  -  Deadline July 20, 2020
cpvs
79713000

Purpose of Services: Services of gardiennage.Le This contract relates to mobile and static security service benefits, under Category 23 - Investigation and security services - of Annex IIB of the law of 15 June 2006 relating to publics.Lieu markets of service delivery: All sites ICDILes static guard services take place at the headquarters of the inter street Weir 1-6010 Couillet.Les mobile care benefits are made as for them on all the inter sites, mainly but not limited to the head office of the intermunicipal street Weir 1-6010 Couillet, the recycling parks and the energy recovery unit (also called incinerator) .L'adresse incinerator is Port of Praye, 1-6250 Pont-de-Loup. The recycling parks addresses are: • Rue du Terril 27-6150 Anderlues • Alley Valerian 26-7160 Chapelle-lez-Herlaimont • Rue de Marcinelle 26-6010 Couillet • Street Destrée in 6043 Ransart • Châtelet Road in 6010 Couillet • Coron Street Chasm 67-6200 Châtelineau • Rue de Binche 152-6180 Courcelles • Rue de Mellet 11-6220 Fleurus • Rue du Petria to 6140 Fontaine-the Bishop • Rue Jean Joseph Piret 100-6280 Joncret • Path of 'Hamlet in 6120 Ham-sur-Heure / Nalinnes Rue du • Gift 3-6210 Frasnes-lez-Gosselies • path Falgeotte 2-6111 Landelies • station in Luttre Luttre 6238

Call for applications for participation - LENS - Replacement of joinery and painting cornices of the town hall of Lens

Commune de Lens | Published August 5, 2016  -  Deadline September 20, 2019
cpvs
45421000

This contract involves the replacement of all exterior woodwork and painting the eaves and dormers of the communal house of Lens to improve the energy performance of the building.

Call for proposals for enhancing the energy potential of the public domain through the exploitation of wind turbines on motorway parking areas

Société wallonne de Financement complémentaire des Infrastructures | Published August 5, 2016  -  Deadline October 20, 2018
cpvs
98390000

The contract is to conclude service concession contracts for the installation and operation of such facilities "big wind", that is to say, with a unit capacity equal to or greater than 1 MW on motorway parking areas of structuring roads of Wallonia.

Development and operation of TIMES model in Wallonia

RW-SpW-DGO4-DPED-direction de la promotion de l'énergie durable | Published August 13, 2016  -  Deadline July 20, 2018
cpvs
71314000

This contract aims to support the Walloon government (Department of Energy and Sustainable Building of the DGO4) in the development and operation of the optimization model TIMES the Walloon scale in order to analyze regionally baseline scenario and explore alternative scenarios in strategic consulting purposes, at least for 2020, 2030 and 2050. the model will be used in particular to define objectives and lower cost optimal paths and to define optimal policies and measures to be Work in Wallonia. The mission will be one hand to develop the model and simulate different scenarios (tasks 1 and 2) and secondly to assist the Administration in its use of the model, in participation in ETSAP network and some specific issues ( tasks 3 through 5).

Establishment of a renewable energy electric Facilitator (wind, solar, hydro) and cogeneration

RW-SpW-DGO4-DPED-Direction de la Promotion de l'énergie durable | Published August 5, 2016  -  Deadline February 20, 2018
cpvs
98110000

The contract is to ensure the mission of Facilitators, in Wallonia, for electric renewable sectors (Wind, Photovoltaic, Hydro) and cogeneration, for the benefit of investors, engineering, business and the public sector ( including the Walloon administration). The mission is based on expertise, assistance, guidance and information to promote electric renewable energy and cogeneration.

Performing an assessment of recent reforms of premiums and loan system "Energy and Housing"

IWEPS | Published August 5, 2016  -  Deadline September 20, 2016
cpvs
75000000

The purpose of this contract is to provide an assessment of the reforms of premiums and loans system "Energy and Housing", occurred respectively in 2015 and 2016, to answer the following questions: 1. What is the effect of the reform of premiums and loans "Energy and Housing" on the use of target groups (households with modest incomes) to these devices? 2. To what extent the policies implemented are they affected by windfall and negative effects? The purpose of evaluation, context, data and methodologies as well as the work program are presented in detail in Section II . Description of the technical requirements of the specifications.

legal services market of debt collection in judicial phase

Intercommunale ORES Assets scrl | Published August 5, 2016  -  Deadline September 20, 2016
cpvs
79100000

The recovery by judicial process of claims relating to the contracting authority activity. These services include: • Representation of the contracting authority from the courts • The designation and monitoring of bailiffs according to their jurisdictions so that they carry out a screening of debtors (location, evaluation of creditworthiness) quotations and enforcement of judgments that the contracting authority considers favorable to its interests. These receivables correspond to unpaid bills at the time of contract award and to be issued for the duration of it. These receivables relate to work carried out by the contracting authority as well as energy supplies by the contracting authority.

Adaptation work of HVAC installations and work on increasing the power output of ice water.

Brussels South Charleroi Airport SA | Published November 27, 2015  -  Deadline December 17, 2015
cpvs
45331000, 45331210, 45331220, 45331230, 45331200

Part 1: Construction adaptation of HVAC installations: storage areas, security control, departure lounge, arrivals hall ... Including: Studies of: - Installations ventilation, hydraulic and existing power; - Calculation Eudes and stability elements for the installation of structures and equipment; - Studies and ventilation and hydraulic calculations for the installation of various equipment; The realization of: - ventilation construction plans, hydraulic and electrical; - Control of execution studies of all control office facilities by SECO (SECO fees charged to the MO); - Calculations and commitment on the energy performance of facilities; - Testing and acceptance of the installations; - Plans have built the installation of: - 4 new air preparation groups rated at +/- 33 000 m³ / h each to complement the current flow 44.000m³ / h, - active carbon filters these groups - 4 heat pumps and cooling towers associated 4 for heating and cooling the additional air in the premises, - The hydraulic connections and ventilation groups and heat pumps - Control and regulation of groups and pump Heat - The adaptation of the steering groups of regulation and heat pumps Part 2: Works of increasing the power output of ice water and addition of a new high-voltage cabin Includes: Studies on: - existing hydraulic and electrical installations; - Design and calculation of stability elements for laying structures and equipment; - Studies and hydraulic and electrical calculations for the installation of various equipment; The realization of: - hydraulic and electrical implementation plans; - Control of execution studies of all control office SECO by facilities; - Calculations of e ...

Establishment of a legal framework for the development of deep geothermal energy in Wallonia

Cabinet du Ministre des Pouvoirs Locaux, de la Ville, du Logement et de l'Energie | Published August 5, 2016  -  Deadline September 20, 2015
cpvs
79110000

Establishment of a legal framework for the development of deep geothermal energy in Wallonia

Supply contract for the rental of multifunction copiers and production copiers for our copy center, including a maintenance contract omnium and management software.

Igretec | Published August 5, 2016  -  Deadline June 20, 2014
cpvs
30120000

supplies rental contract covering multifunction copiers to distribute our various operating sites and production copiers for our copy center, including a maintenance contract omnium and software gestion.Le content market and its general execution context are developed in the technical part (part C) specifications charges.Le market consists of two parts: - part A: rental of multifunction copiers floor- part B: leasing production for our copiers copy center. AThe party contract is intended to meet the needs of the intermunicipal for multifunction copiers during a period of 4 years. The initial contract is for the rental of 14 multifunction copiers same again on our various sites: 6 SOLEO IGRETEC (HEADQUARTERS) - Bd Mainz, 16000 CHARLEROI3 EOLE BUILDING EOLE - Rue des Frères Wright, 29, 6041 GOSSELIES1 TELECOM BUILDING TELECOM - Avenue Georges Lemaître 21 6041 sTOP sTOP GOSSELIES1 ENERGY - Avenue General Michel, 1E 6000 CHARLEROI2 MONTIGNIES / S / S TREATMENT PLANT MONTIGNIES / S / S - Chaussee de Charleroi 401 6061 CHARLEROI1 PHENIX in front of No. 25 Boulevard Mainz 6000 CHARLEROI Party BThe market for the rental of three copiers (color and 2 1 B & amp; B) and finishing with software management for our copy center.

Extension of the institute DON BOSCO - Construction of a new building

INSTITUT DON BOSCO asbl. | Published August 5, 2016  -  Deadline April 20, 2013
cpvs
45000000, 45200000, 45400000, 45300000

The institute DON BOSCO wishes to expand its facilities on its site of Val d'Or in Woluwe-Saint-Pierre by the construction of a new building for 3,450 m2 of new classrooms and ancillary rooms dedicated teachers, 350 m2 of joinery workshop PVC / ALU, 320 m2 of technical basements and premises, with all construction to nearly 4,100 m2. As a corollary, the management wants to adapt the surroundings to enlarge the playground and build a yard of about 250 m2. The building is meant high energy performance and is the classification zero energy building. It will consist of a frame steel / concrete, concrete floors and walls to wood framing. All the siding will be fiber cement. The contract involves the supply of materials and services to the complete construction, general contractor of the building, structural work, technical and finishings as well as its surroundings.

improving the energy performance of the school in Biesme-sous-Thuin

Igretec | Published August 12, 2016  -  Deadline September 20, 2012
cpvs
45421100, 45331100, 45321000

Retrofit of the School of Biesme-sous-Thuin - replacement of exterior woodwork, floor insulation of the attic of the main building, replacing the oil boiler and renovation of the boiler room