Public tenders for energy in Austria

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyAustria

Energy and related services

Wirtschaftskammer Niederösterreich | Published March 31, 2017  -  Deadline May 5, 2017
cpvs
71314000

Awareness and focus consulting for companies in the renewable energy / energy efficiency as part of the ERDF program investments in growth and employment Austria 2014-2020- short: AW-SP-consultations 2018th

Awareness and focus consulting for companies in the renewable energy / energy efficiency as part of the ERDF program investments in growth and employment Austria 2014-2020.

Awareness and focus consulting for companies in the renewable energy / energy efficiency as part of the ERDF program investments in growth and employment Austria 2014-2020, Mobility.

Awareness and focus consulting for companies in the renewable energy / energy efficiency as part of the ERDF program investments in growth and employment Austria 2014-2020; Mobility.

Construction work

Asfinag Autobahnen- und Schnellstraßen-Finanzierungs-Aktiengesellschaft | Published March 10, 2017  -  Deadline April 25, 2017
cpvs
45000000

The subject construction project essentially comprises · 4 cm Abtragsfräsen the central reservation crossings and applying a new asphalt layer (4 cm), · preparation of the central reserve management systems (MÜLS) in the Vorportalbereichen North and South. · All trenching and cable laying work for energy- and data-related supply of MÜLS from the predetermined transfer points, · legwork in implementing the MÜLS into the control system of the TS Plabutsch (implementation done by the AN E & M), · construction / installation of signage.

Electrical fitting work

Stadt Wien – Wiener Wohnen | Published April 15, 2017  -  Deadline May 30, 2017
cpvs
45311200

Electrical installation work - yard lighting.

renewing distribution cabinet / neu 1 PA, energy underground cable 3180 m, power cable 14 is 200 m, casing 9950 m, lamps new 49 pcs., lights stock 71 pcs., the earth electrode 2 300. m.

Building construction work

ÖBB-Infrastruktur Aktiengesellschaft | Published March 25, 2017  -  Deadline May 4, 2017
cpvs
45210000

15kV UW Switching backbone (traveling stretchers new construction of 110 kV switchgear than conventional free air conditioning with double busbar and 15 kV switchgear as metal-enclosed / metal-clad system adaptation of the 110 kV traction current involvement New direction further supply of traction energy by establishing a provisional 110 kV switchgear with 3: Renewal of the substation Villach measures representation substations) and feed through existing 15kV old facility to the commissioning of the new plant. This contract is the constructional part of the project.

Meter reading service

Wien Energie GmbH | Published April 22, 2017  -  Deadline June 8, 2017
cpvs
65500000, 38550000

Under the terms of § 197 BVergG, without obligation of acceptance with three parties via the annual reading, the provision of equipment for heat cost allocators, heat and cold meters as well as cold water and hot water meters and over clearing and data processing services for the Vienna and Lower Austria region.

This service covers all new and existing customers of the client in Vienna and Lower Austria for the heating costs and hot water accounts of the respective locations.

The read-out data obtained by the framework agreement partners must be delivered in accordance with defined digital read-out interfaces for the preparation of the respective billing in a defined period and the corresponding master data sheets must be generated and handed over to the customer.

The following approximate number of heat / energy consumption devices is used by the customer of the customer:

Year or each subsequent year of the base period)

Heat cost allocators (also "HKV") 1 100 000;

Hot water meter 300 000;

Heat meter 40 000;

Cold water meter 30 000;

Change of customer / heating costs 17 000;

Equipment supply (including refrigeration meters).

In addition, a comprehensive billing (ie, the actual billing is carried out beyond the reading and delivery of the consumption data) is to be provided annually for around 1 600 customers.