Call +44 800 9755 164

Public tenders for electrical in Poole United Kingdom

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

GB-Poole: Mechanical and Electrical Services Alumhurst Ward St Ann's Hospital

Dorset HealthCare University NHS Foundation Trust | Published November 15, 2016
Winner
Thoughtward Ltd
cpvs
71240000

A Fee Bid is required for Design Brief for the Mechanical and Electrical Services associated with the Refurbishment of the First Floor Wards in the 1980 Wing, St Ann's Hospital, Poole.

GB-Poole: New Electrical Intake Room at Yeatman Hospital, Sherbourne

Dorset HealthCare University NHS Foundation Trust | Published October 21, 2016
Winner
G R Westbuild
cpvs
45000000

Demolition and clearance of existing smoke shelter, removal and clearance of plant growth to create to footpath. Groundwork / foundation preparation. Construction of sub-structure. Supply and fix new cavity walls. Extend top of existing external walls and extend to same height as cavity walls.Supply and fit new flat roof, including flashings and alterations to rainwater system. Supply and fix external door. Supply and fix floated concrete floor and epoxy floor paint. Undercoat and top coat to walls.

GB-Poole: Electrical Main Switchgear Replacement Yeatman Hospital Sherbourne

Dorset HealthCare University NHS Foundation Trust | Published October 21, 2016
Winner
E C Electricals
cpvs
45310000

The project is based in the Yeatman Hospital, Sherborne and comprises the proposed replacement of the main low voltage switch panel, sub distribution panel and standby generator controls.

GB-Poole: DH399 Replacement Distribution Boards Jersey Ward Alderney Hospital

Dorset HealthCare University NHS Foundation Trust | Published September 12, 2016
Winner
Craft Electrical Contractors Ltd
cpvs
31600000

Supply and Installation of replacement Electrical Distribution Boards Jersey Ward Alderney Community Hospital, Poole.

Street Lighting Equipment Replacement and Maintenance.

Borough of Poole | Published September 14, 2015
Winner
Volker Highways Ltd
cpvs
34000000, 31712341, 34928500, 50232100

The Services will be provided under two separate contracts, both of which will be awarded to the same supplier. Equipment Replacement — Borough of Poole Only The equipment replacement contract will consist of the following Year 1 — replacing 8640 lanterns with LED lanterns. Year 2 — replacing 4390 lamp columns and associated lanterns (new lanterns to be LED). Year 3 — replacing 4390 lamp columns and associated lanterns (new lanterns to be LED). The planned start date for this contract is August 2015 Maintenance — Borough of Poole and Bournemouth Borough Council. The maintenance contract will be for the ongoing maintenance of the street lighting stock and will include routine maintenance and cleaning, fault repairs, electrical testing, structural testing and painting of the public lighting stock which includes illuminated traffic signs, illuminated traffic bollards and amenity lights.

GB-Shaftesbury: Westminster Memorial Hospital - JLU and Abbey Rooms

Dorset HealthCare University NHS Foundation Trust | Published November 17, 2016  -  Deadline December 8, 2016
cpvs
45000000

Name: JLU Suite and Abbey Room Upgrade. • Nature: Minor internal alterations to existing rooms including associated mechanical and electrical works. • Location: Westminster Memorial Hospital, Magdalene Lane, Shaftesbury SP7 8BD.

GB-Bridport: BRIDPORT HOSPITAL - VENTINALTION AND CONTROL WORKS, MINOR INJURIES OPERATING THEATRE *Duplicated*

Dorset HealthCare University NHS Foundation Trust | Published May 4, 2017  -  Deadline April 24, 2017
Winner
Wessex Building Services Ltd
cpvs
42500000

Supply, install test and commission replacement cooling equipment for the air conditioning system with associated electrical service controls all serving the Minor Injuries Operating Theatre and its Recovery Room at Bridport Hospital.

GB-Poole: DH366 Alderney Hospital Replacement Boiler Plant Jersey Ward

Dorset HealthCare University NHS Foundation Trust | Published May 17, 2016  -  Deadline June 9, 2016
cpvs
71334000

Electrical isolation of the boilerplant and strip out of its electrical services back to the control panel Isolation of the boiler gas supply Summer strip out of the existing boilerplant including most of the LPHW services in the plantroom, local gas supply pipework and the boiler flues and flue header Installation of temporary power supplies for the two hot water generators, the HWS secondary pump and the associated instrumentation and the new gas safety shut-off valve Installation of a circular sheet steel protector to the 152 x 152 building column Extension of the boiler concrete base Installation of a stainless steel flashing plate for the boiler flues replacing the wired glass panel above the plantroom doors Installation of a back inlet gully immediately outside the plantroom with 100mm drain pipe to the existing manhole and 50mm metal sleeve through the outside wall Installation of an extract grille and frame over the opening in the chimney stack left when the flue header is removed Preparation of gas supply pipework Shutdown of the gas supply and installation of a safety shut-off valve and isolating valves Installation of the new boilerplant with its flues, LPHW pipework, gas pipework, condensate and general drainage pipework Installation of an expansion vessel and pressurisation unit with mains cold water supply, system feed and drain pipework Installation of a mains cold water supply for flushing of the Adey magnetic filter Thermal insulation of all new and modified LPHW and mains cold water pipework Remedial thermal insulation to any existing insulation cut back or damaged by the works Installation of a new plantroom power supply isolator, plantroom distribution board, plantroom lighting, emergency lighting and double switched socket outlet all with galvanised steel cable containment Installation of a new plant control panel for the boilerplant and the existing HWS plant Installation of field wiring for the new boilerplant esting and commissioning Reconnection of the field wiring to the HWS plant and testing Clearing site Provision of as fitted drawings and an operation and an operation and maintenance manual Demonstration of the new boiler plant and services to the Trust’s Estates department

GB-Poole: Installation of Hygenic Wall Coverings at St Ann's Hospital Kitchen Poole

Dorset Healthcare University NHS Foundation Trust | Published January 12, 2016  -  Deadline January 26, 2016
cpvs
45432210

The scope of works will entail the installation over Altro Whiterock hygienic wall coverings to the following areas located in the main kitchen at St Ann’s Hospital, 69 Haven Road, Canford Cliffs, Poole, Dorset BH13 7LN. The main contractor is to make allowances within his tendered price to remove the following items, please note the list is not exhaustive but will include: •All fixtures and fittings signage, notice boards knife racks etc •Wash hand basins and associated pipe work and brackets for the Whiterock to be installed behind •Sinks and associated stainless steel tabling •Wall cupboards •Racking The contractor is to employ a suitably qualified electrical contractor (NICEIC approved) to remove all light switch plates, socket outlets, control panels, mains isolators and all other wall mounted items to enable the hygienic wall covering to be installed. Any damaged switches or sockets are to be reported to the Project Manager and an instruction will be given to replace such items with a modern equivalent. Upon completion of works the main contractor is to employ a specialist contractor to carry out the required sealant works between wall covering and appliances. Colour to be agreed at the pre contract meeting. The works will take place over late afternoon and night periods. This will mean that an electrician and plumber must be available to disconnect and re connect all items ready for the work area to be back in use the following day.

GB-Poole: Installation of Hygenic Wall Coverings at St Ann's Hospital Kitchen Poole

Dorset Healthcare University NHS Foundation Trust | Published February 8, 2016  -  Deadline February 8, 2016
Winner
Honan Building Services Ltd
cpvs
45215000

The scope of works will entail the installation over Altro Whiterock hygienic wall coverings to the following areas located in the main kitchen at St Ann’s Hospital, 69 Haven Road, Canford Cliffs, Poole, Dorset BH13 7LN. The main contractor is to make allowances within his tendered price to remove the following items, please note the list is not exhaustive but will include: •All fixtures and fittings signage, notice boards knife racks etc •Wash hand basins and associated pipe work and brackets for the Whiterock to be installed behind •Sinks and associated stainless steel tabling •Wall cupboards •Racking The contractor is to employ a suitably qualified electrical contractor (NICEIC approved) to remove all light switch plates, socket outlets, control panels, mains isolators and all other wall mounted items to enable the hygienic wall covering to be installed. Any damaged switches or sockets are to be reported to the Project Manager and an instruction will be given to replace such items with a modern equivalent. Upon completion of works the main contractor is to employ a specialist contractor to carry out the required sealant works between wall covering and appliances. Colour to be agreed at the pre contract meeting. The works will take place over late afternoon and night periods. This will mean that an electrician and plumber must be available to disconnect and re connect all items ready for the work area to be back in use the following day.

Supply of vehicle and plant parts and workshop consumables via a supplier managed inventory service.

Borough of Poole | Published January 29, 2015
Winner
Adams Morey Limited
cpvs
34300000

The Council are proposing to Contract for the supply of vehicle and plant parts including workshop consumables via a supplier managed inventory service. The services' will include a ‘One Stop Shop' for managing the supply of vehicle and plant parts relating to the Council's fleet (see attached appendix 2014). The selected Contractor shall be responsible for the supply of goods as the preferred but not exclusive Supplier through their own and/or other distribution networks for the following: — Body parts; — Chassis parts; — Hydraulic Parts and Oils; — Filtration and Lubricants; — Electrical and Lighting Components; — Engine Parts; — Suspension, Transmission and Braking Parts; — Fitted Ancillary Equipment Parts including Lifting Equipment, Pressure Vessels, Sweeper Gear, brushes, skirts; — Workshop Consumables. This arrangement will exclude Tyres and Associated Parts, and excludes services not associated with parts supply such as vehicle cleaning, bodywork repairs, MOT and other inspections The proposed Contract will provide for the ‘on-request' supply of Vehicle and Plant Parts on an imprest and as required basis to meet the daily demands of the Vehicle Workshops. The Contractor will be permanently based in the Council's workshop premises, covering hours of 8:00 hrs-17:30 hrs and will manage the daily administration and operation of: Vehicle parts acquisition, Parts stock control and Issuing of parts, Invoicing the Council on a daily basis, Communications with and reporting to the Council's staff. The proposed contract term will be 5 years plus 1 year plus an additional year. The annual demand for this contract period is expected to be in the order of: 325 000 GBP. Borough of Poole operates an on-going fleet replacement strategy which may change the future fleet profile and quantities. No guarantee is given or implied as to the quantities of goods or categories of goods that will be taken under the proposed arrangement.
  • 1