Public tenders for electrical in Turkey

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

International Consultancy Services on Waste Electrical and Electronic Equipment (WEEE) for Energy Efficient Electric Motors

UNDP County Office - TURKEY | Published April 12, 2018  -  Deadline May 5, 2018
cpvs

1. BackgroundPlease see Annex 1 (Terms of Reference). 2. Scope of Work, Responsibilities and Description of the Proposed Analytical WorkPlease see Annex 1 (Terms of Reference). 3. Requirements for Experience and QualificationsPlease see Annex 1 (Terms of Reference). 4.Documents to be Included when Submitting the ProposalsInterested individual consultants should submit the following documents/information to demonstrate their qualifications:1. Proposal:(i) A one-page Letter of Interest, explaining why they are the most suitable for the work(ii) Personal CV or UN Personal History Form (P11 Form) including past experience in similar projects and accessible contact details (preferably mobile phones) for at least 3 references. 5. Financial ProposalThe candidates, who are technically qualified will be requested to submit financial proposals as per the template which will be shared with the shortlisted candidates only, after the technical evaluation of the documents indicated in Section 4. 6. EvaluationThe evaluation will be based on cumulative analysis (i.e. technical qualifications and price proposal). The weight of the technical criteria is 70%; the weight of the financial proposal is 30%. Candidates that obtain a minimum of 49 pts out of a maximum 70 pts will be considered for the financial evaluation. Candidates that do not meet the minimum requirements will be disqualified.

IPA — construction of Bulancak water supply system

Ministry of Environment and Urbanisation | Published January 20, 2012
cpvs
45231100, 45231111, 45231300, 45232152, 45247270

The scope of the works contract will cover construction of the following: — rehabilitation and renewal of house connections and installation of monitoring system, — reconstruction of 6 new storage tanks and rehabilitation of 4 existing reservoirs, — re-drilling of new wells, reconstruction of well pump houses and replacement of pumps with all mechanical and electrical works, — renovation of 3 existing pumping stations and construction of 2 new pumping stations, including pumps and all related accessories, mechanical and electrical installation works, — replacement of 20,4 km (approximately) transmission lines between storage tanks (diameter varies between Ø 100 and Ø 400), — installation of micro-filter and chlorination systems including all mechanical and electrical installation works, — renewal and new construction of water distribution network (approximately 72 km renewal in existing network and 32 km new construction). The contract will be implemented as per FIDIC conditions of contract.

IPA — supply for improving the quality of public employment services

European Union Coordination Department of the Ministry of Labour and Social Security | Published May 10, 2012  -  Deadline July 13, 2012
cpvs
30200000, 31600000, 31710000

The subject of the contract is the delivery, installation, putting into operation, inspection, testing, training and warranty of information technology equipment, electrical and electronic equipment (including air conditioner, refrigerator and generator) which will be used in 43 provinces over the 12 NUTS II regions in order to improve the quality of public employment services.

Procurement of Electric Fence System Against Boars

UNDP Country Office - TURKEY | Published April 20, 2018  -  Deadline May 16, 2018
cpvs

Procurement of Electric Fence System Against Boars within the scope of Göksu Taşeli Watershed Development Project

Design , manufacturing, procurement, supply, transportation, installation, erection, supervision of erection, testing and commisisonig of Electro-Mechanical (E&M) Equipment of Pervari Dam and HEPP Project with installed capacity 2 units x 195,5 MW (Main Powerhouse-Francis turbines, vertical axis) and 2 units x 9,2 MW (Ecological Powerhouse-Francis turbines, horizontal axis).

Pervarİ Elektrİk Üretİm Madencİlİk ve Sanayİ Tİcaret A.Ş. (Owned by Enerjisa) | Published September 13, 2013  -  Deadline November 15, 2013
cpvs
45000000

Pervari Elektrik Üretim Madencilik ve Sanayi Ticaret A.Ş. (Owner) now invites distinguished and reputable Hydro-Power Equipment Manufacturers (Bidders) to submit their bids for the design, procurement of materials and equipment, manufacturing, assembly and field and shop testing, complete fitting out and final painting, packing for sea and/or land transport to site, unloading and storing at site, erection at site, supervision of erection, testing and commissioning and guarantee of the equipments and systems and switcyard equipments for Pervari HEPP (the Project) including but not limited to the following: — Turbines and auxiliaries — Inlet Valves and auxiliaries — Generators and auxiliaries (Both Mechanical and Electrical) — Balance of Plant equipment — Instrumentation, Control and SCADA system — Station Service equipment — Protection and Measurement equipments — Switchgear equipment at Generator output voltage level and busbar — Generator step up Transformers — HV Switchgear equipments — Spare parts — Special tools — All works from turbine inlet valve on upstream water side to end of draft tube lining on the downstream water side and to switchgear on electrical side in the Project — All works related to synchronization of generator outputs to 154 kV switchgear — Complete design documentation with detailed drawings, as built documents, erection manuals, operation and maintenance manuals and all test procedures — Training The following are out of the Scope of the Project: 380 kV Overhead Short Transmission Line — All civil and hydromechanical works 2.3 Duration of Works . 48 months Pervari Elektrik Üretim Madencilik ve Sanayi Ticaret A.Ş. (Owner) now invites distinguished and reputable Hydro-Power Equipment Manufacturers (Bidders) to submit their bids for the design, procurement of materials and equipment, manufacturing, assembly and field and shop testing, complete fitting out and final painting, packing for sea and/or land transport to site, unloading and storing at site, erection at site, supervision of erection, testing and commissioning and guarantee of the equipments and systems and switcyard equipments for Pervari HEPP (the Project) including but not limited to the following: — Turbines and auxiliaries — Inlet Valves and auxiliaries — Generators and auxiliaries (Both Mechanical and Electrical) — Balance of Plant equipment — Instrumentation, Control and SCADA system — Station Service equipment — Protection and Measurement equipments — Switchgear equipment at Generator output voltage level and busbar — Generator step up Transformers — HV Switchgear equipments — Spare parts — Special tools — All works from turbine inlet valve on upstream water side to end of draft tube lining on the downstream water side and to switchgear on electrical side in the Project — All works related to synchronization of generator outputs to 154 kV switchgear — Complete design documentation with detailed drawings, as built documents, erection manuals, operation and maintenance manuals and all test procedures — Training The following are out of the Scope of the Project: 380 kV Overhead Short Transmission Line — All civil and hydromechanical works

Framework-based Local Finance Consultancy for Electric Motor Replacement Programmes

UNDP Country Office - TURKEY | Published April 27, 2018  -  Deadline May 7, 2018
cpvs

1 BackgroundPlease see Annex 1 (Terms of Reference). 2 Scope of Work, Responsibilities and Description of the Proposed Analytical WorkPlease see Annex I (Terms of Reference)3 Requirements for Experience and QualificationsPlease see Annex I (Terms of Reference)4 Documents to be Included when Submitting the ProposalsInterested individual consultants should submit the following documents/information to demonstrate their qualifications:A one-page Letter of Interest, explaining why they are the most suitable for the workPersonal updated CV or UN Personal History Form (P11 Form) including past experience in similar projects and accessible contact details (preferably e-mails and mobile phones) for at least 3 references.5 Financial ProposalThe candidates, who are technically qualified will be requested to submit financial proposals as per the template which will be shared with the shortlisted candidates only, after the technical evaluation of the documents indicated in Section 4.6 EvaluationThe evaluation will be based on cumulative analysis (i.e. technical qualifications and price proposal). The weight of the technical criteria is 70%; the weight of the financial proposal is 30%. Candidates that obtain a minimum of 49 pts out of a maximum 70 pts will be considered for the financial evaluation. Candidates that do not meet the minimum requirements will be disqualified.

Engineering, Procurement And Construction Agreement of Dağpazarı WPP Extension Project.

Enerjisa Enerji Üretim A.Ş. | Published July 10, 2013  -  Deadline July 13, 2013
cpvs
45000000

ENERJİSA ENERJİ ÜRETİM AŞ. (the 'Owner') wishes to develop a wind power plant, namely Dağpazarı Wind Power Plant Extension ('WPP Extension'), with a total capacity of 21 MW within the site boundaries of existing 39 MW Dağpazarı Wind Power Plant near Mersin. The EPC Contract are planned to be awarded to a contractor ('Contractor') to engineer, procure and construct as well as operate and supply maintenance for the WPP Extension. The following works and services will be provided by the Contractor: Design, engineering, supply, transportation, customs clearance, construction, installation, erection, commissioning and testing of complete Wind Power Plant Extension including but not limited to; Civil Works, premises (such as offices, control and logistic buildings, covered and uncovered storages, parking, facilities), roads, turbine platforms, turbine foundations, cable trenches, building, switchyard civil works, RMU buildings (if required); Electrical Infrastructure, the Plant, Major Components, Electrical Equipment and connections, WTGs together with associated equipment, unit step-up transformers, towers, control and monitoring system, lightning protection, earthing system, foundation bolts, MV/HV system, control systems, MV RMUs and auxiliaries, RMU buildings and auxiliaries, main step-up transformers, 154 kV substations and auxiliaries; retrofit of Dağpazarı WPP 154 kV substation and Spare Parts, unloading of all the relevant equipment and materials at the Site, and installation and commissioning of the works; and Operation and maintenance of the WPP Extension, supply of spare parts and training of Owner's staff for operation and maintenance of the WPP Extension.

Supply of Electro-Mechanical (E&M) Equipment of İncir Dam and HEPP Project.

İBA ELEK.ÜRE.MAD.SAN.VE TİC.A.Ş. | Published July 10, 2013  -  Deadline August 12, 2013
cpvs
45000000

İBA Elektrik Üretim Madencilik ve Sanayi Ticaret A.Ş. (Owner) now invites distinguished and reputable Hydro-Power Equipment Manufacturers (Bidders) to submit their bids for the Design, Procurement of Materials, Manufacturing, Assembly and Shop Testing, complete fitting out and final painting, packing for sea and/or Land Transport to site, unloading and storing at site, erection at site, supervision of erection, testing and commissioning and guarantee of the equipments and systems for İncir HEPP (the Project) including but not limited to the following: - Turbines and auxiliaries - Inlet Valves and auxiliaries - Generators and auxiliaries (Both Mechanical and Electrical) - Balance of Plant equipment - Instrumentation, Control and SCADA system - Station Service equipment - Protection and Measurement equipments - Switchgear equipment at Generator output voltage level and busbar - Generator step up Transformers - HV Switchgear equipments - Spare parts - Special tools - All works from turbine inlet valve on upstream water side to end of draft tube lining on the downstream water side and to switchgear on electrical side in the Project - All works related to synchronization of generator outputs to 154 kV switchgear - Complete design documentation with detailed drawings, as built documents, erection manuals, operation and maintenance manuals and all test procedures - Training The following are out of the Scope of the Project: - 154 kV OHL - All civil works

construction work

Enerjisa Enerji Üretim A.Ş. | Published October 17, 2012  -  Deadline November 26, 2012
cpvs
45000000

:Enerjisa Enerji Üretim A.Ş. (Owner) now invites distinguished and reputable Hydro-Power Equipment Manufacturers (Bidders) to submit their bids for the Design, Procurement of Materials, Manufacturing, Assembly and Shop Testing, complete fitting out and final painting, packing for sea and/or Land Transport to site, unloading and storing at site, erection at site, supervision of erection, testing and commissioning and guarantee of the equipments and systems for Alpaslan II HEPP (the Project) including but not limited to the following: — turbines and auxiliaries, — inlet valves and auxiliaries, — generators and auxiliaries, — balance of plant equipment (both mechanical & electrical), — instrumentation, Control and SCADA system, — station service equipment, — protection and measurement equipments, — switchgear equipment at generator output voltage level and busbar, — generator step up transformers, — HV switchgear equipments, — spare parts, — special tools, — limit of Works of the Project covers the following: —— all works from turbine inlet valve on upstream water side, to end of draft tube lining on the downstream water side, and to switchgear on electrical side in the Project, —— all works related to synchronization of generator outputs to 154 kV switchgear, —— complete design documentation with detailed drawings, as built documents, erection manuals, operation and maintenance manuals and all test procedures, —— training, — the following are out of the scope for the Project: —— 154 kV OHL, —— all civil works including cable channels.

Technical assistance for structure and capacity improvement of Turkish Electricity Transmission Corporation (TEIAS)

Central Finance and Contracts Unit (CFCU) | Published February 20, 2013
Winner
RTE International.
cpvs
65300000, 71356200, 72315000, 79414000, 80550000

Technical assistance for structure and capacity improvement of Turkish Electricity Transmission Corporation (TEIAS)

IPA — technical assistance on structure and capacity improvement of Turkish Electricity Transmission Corporation (TEIAS)

Central Finance and Contracts Unit (CFCU) | Published October 16, 2012  -  Deadline October 30, 2012
cpvs
65300000, 71356200, 72315000, 79414000, 80550000

IPA — technical assistance on structure and capacity improvement of Turkish Electricity Transmission Corporation (TEIAS)

IPA — technical assistance for structure and capacity improvement of Turkish Electricity Transmission Corporation (TEIAS)

Central Finance and Contracts Unit (CFCU) | Published April 11, 2012  -  Deadline May 14, 2012
cpvs
65300000, 71356200, 72315000, 79414000, 80550000

This contract is aiming at improving the institutional structure and capacity of Turkish Electricity Transmission Corporation (TEIAS) by performing activities mentioned below: 1) establishment and implementation of the live working system by determining the live working operations and tools; training of operators; assistance for setting up legal basis of TEIAS; 2) development of work safety and training performance by performing training for electricity transmission lines and substations; improving TEIAS work safety regulation in accordance with directives and regulations of the EU; 3) development of the human resources policies and rules by revising human resources policies of TEIAS; 4) renovation of TEIAS organisational structure by determining the organisational and IT structure of TEIAS.

IPA — technical assistance for structure and capacity improvement of Turkish Electricity Transmission Corporation (TEIAS)

Central Finance and Contracts Unit (CFCU) | Published April 11, 2012  -  Deadline May 14, 2012
cpvs
65300000, 71356200, 72315000, 79414000, 80550000

IPA — technical assistance for structure and capacity improvement of Turkish Electricity Transmission Corporation (TEIAS)

IPA — technical assistance for structure and capacity improvement of Turkish Electricity Transmission Corporation (TEIAS)

Central Finance and Contracts Unit (CFCU) | Published April 14, 2012  -  Deadline May 14, 2012
cpvs
65300000, 71356200, 72315000, 79414000, 80550000

IPA — technical assistance for structure and capacity improvement of Turkish Electricity Transmission Corporation (TEIAS)

IPA — technical assistance for structure and capacity improvement of Turkish Electricity Transmission Corporation (TEIAS)

Central Finance and Contracts Unit (CFCU) | Published April 14, 2012  -  Deadline May 14, 2012
cpvs
65300000, 71356200, 72315000, 79414000, 80550000

IPA — technical assistance for structure and capacity improvement of Turkish Electricity Transmission Corporation (TEIAS)

IPA — construction of Merzifon waste water treatment plant

Ministry of Environment and Urbanisation | Published February 28, 2012
cpvs
45252127

The scope of the works contract consists of the complete engineering design and construction (civil, mechanical and electrical works), start-up of the plant, commissioning, operational training of the beneficiary's personnel and handover of the waste water treatment plant (WWTP) to the municipalities, ready for operation. The waste water treatment plant will serve the population of 71 791 persons in 2025 and will have the extended aeration activated sludge process with biological nitrification/denitrification, aerobic sludge stabilisation in the activated sludge tanks, and sludge dewatering, etc. This contract will also cover the civil and pipe-laying works including testing and commissioning of the discharge line and extension of the existing main collector to the plant. The contract will be implemented as per FIDIC (Yellow Book) conditions of contract.

IPA — construction of Nizip water supply system

Ministry of Environment and Urbanisation | Published April 11, 2012  -  Deadline July 16, 2012
cpvs
38421110, 45231300, 45232152

The contract will include following works: a. replacement of house connections (approx. 8 375); b. renewal (approx. 14,8 km asbestos cement pipes and 29,7 km old PVC pipes according to the leak detection programme results) and new construction of water transmission and distribution network (approx. 170,7 km); c. installation of flow meters (6) to monitor the system; d. renewal of existing reservoirs and construction of 2 new reservoirs; e. construction of new riser main between new reservoir and the pumping station (approx. 8 000 m); f. construction of a pumping station (5 sets of pumps), including all supplies for mechanical and electrical installation. The contract will be implemented as per FIDIC conditions of contract for construction (Red Book).

IPA — construction of Soma waste water treatment plant

Ministry of Environment and Urbanisation | Published April 4, 2012
cpvs
45252127

The scope of the works contract consists of complete engineering design and construction (civil, mechanical and electrical works), start-up of the plant, commissioning, operational training of the beneficiary's personnel and handover of the waste water treatment plant (WWTP) to the municipalities, ready for operation. The waste water treatment plant will be designed and constructed for a population of 111 000 persons and 4 050 industrial p.e. The plant will be expanded in 2025 with the implementation of a second stage to serve till 2040 for 136 491 persons and 4 244 industrial p.e. and will have an extended aeration activated sludge process with biological nitrification/denitrification, aerobic sludge stabilisation in the activated sludge tanks and sludge dewatering, etc. This contract will also cover the civil and pipe-laying works including testing and commissioning of the discharge lines and extension of the existing main collectors to the plant. The contract will be implemented as per FIDIC ('Yellow Book') conditions of contract.

IPA — construction of Sorgun waste water treatment plant

Ministry of Environment and Urbanisation | Published March 6, 2012
cpvs
45252127

The scope of the works contract consists of complete engineering design and construction (civil, mechanical and electrical works), start-up of the plant, commissioning, operational training of the beneficiary's personnel and handover of the waste water treatment plant (WWTP) to the municipalities, ready for operation. The waste water treatment plant will serve a population of 75 093 persons in 2026 and will have an extended aeration activated sludge process with biological nitrification/denitrification, aerobic sludge stabilisation in the activated sludge tanks and sludge dewatering, etc. This contract will also cover the civil and pipe-laying works including testing and commissioning of the discharge lines and extension of the existing main collectors to the plant. The contract will be implemented as per FIDIC ('Yellow Book') conditions of contract.

IPA — construction of Seydişehir waste water treatment plant

Ministry of Environment and Urbanisation | Published March 6, 2012
cpvs
45252120

The scope of the works contract consists of complete engineering design and construction (civil, mechanical and electrical works), start-up of the plant, commissioning, operational training of the beneficiary's personnel and handover of the waste water treatment plant (WWTP) to the municipalities, ready for operation. The waste water treatment plant will serve a population of 46 800 persons in 2025 and will have an extended aeration activated sludge process with biological nitrification/denitrification, aerobic sludge stabilisation in the activated sludge tanks and sludge dewatering, etc. This contract will also cover the civil and pipe-laying works including testing and commissioning of the discharge lines and extension of the existing main collectors to the plant. The contract will be implemented as per FIDIC ('Yellow Book') conditions of contract.