Call +44 800 9755 164

Public tenders for electrical in Zvolen Slovakia

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

Repair of electrical rotating machines

Železničné opravovne a strojárne Zvolen, a.s. | Published January 31, 2017
cpvs
50532000

Repair of electrical rotating machines under the provisions of the Regulation concerning the repair of electrical rotating machines driving railway vehicles APPLICATION FOR ACTION 48/83 and in accordance with the relevant regulations of UIC Standards EN, STN, TNŽ, guidelines and standards for repair of rolling stock, in accordance with the Act. no. 513/2009 Coll tracks, according to Ministry of Transport Decree no. 205/2010 Coll of technical equipment and determined activities and activities on designated technical equipment, according to the Ministry of Transport Decree no. 351/2010 Coll transport order paths as amended by Decree No. MDVRR SR. 12/2012 Coll, in accordance with applicable regulations of the Railway Company Slovakia, as well as other related regulations in line with other legislation in force in Slovakia republike- orders for IV. Q 2016

Repair of electrical rotating machines

Úrad pre verejné obstarávanie | Published November 4, 2016  -  Deadline April 12, 2016
cpvs
50532000

Repair of electrical rotating machines under the provisions of the Regulation concerning the repair of electrical rotating machines driving railway vehicles APPLICATION FOR ACTION 48/83 and in accordance with the relevant regulations of UIC Standards EN, STN, TNŽ, guidelines and standards for repair of rolling stock, in accordance with the Act. no. 513/2009 Coll tracks, according to Ministry of Transport Decree no. 205/2010 Coll of technical equipment and determined activities and activities on designated technical equipment, according to the Ministry of Transport Decree no. 351/2010 Coll transport order paths as amended by Decree No. MDVRR SR. 12/2012 Coll, in accordance with applicable regulations of the Railway Company Slovakia, as well as other related provisions, in accordance with other laws in force in the Slovak Republic

Electricity

Technická univerzita vo Zvolene – Rektorát | Published March 2, 2017
Winner
Slovenský plynárenský priemysel, a.s.
cpvs
09310000

The contract is the supply of electricity to the assumption of responsibility for deviation towards clearing, provision of electricity distribution and distribution services distribution system operator from 00.00. CET on 01.01.2017 to 24.00. CET and on 31.12.2019 in medium and low voltage sampling sites of the contracting authority, ie the objects of the Technical University in Zvolen.

Expected scope of the contract: 6,557,925 kWh for three years. The envisaged amount was determined on the basis of the annual electricity consumption for individual delivery points contracting converted to the required number of years. Estimated electricity consumption will be entitled to exceed customer or nedočerpať without applying the mark-up. Invoice will amount actually collected. The successful tenderer will also provide interoperability with the historical supplier with disconnection and connection points of supply.

Electricity

Technická univerzita vo Zvolene – Rektorát | Published September 28, 2016  -  Deadline November 3, 2016
cpvs
09310000

Expected scope of the contract: 6,557,925 kWh for three years. The envisaged amount was determined on the basis of the annual electricity consumption for individual delivery points contracting converted to the required number of years. Estimated electricity consumption will be entitled to exceed customer or nedočerpať without applying the mark-up. Invoice will amount actually collected. The successful tenderer will also provide interoperability with the historical supplier with disconnection and connection points of supply.

Electricity

Technická univerzita vo Zvolene – Rektorát | Published October 14, 2016  -  Deadline November 3, 2016
cpvs
09310000

The contract is the supply of electricity to the assumption of responsibility for deviation towards clearing, provision of electricity distribution and distribution services distribution system operator from 00.00. CET on 01/01/2017 24:00. CET and on 31.12.2019 in medium and low voltage sampling sites of the contracting authority, ie the objects of the Technical University in Zvolen.

Electricity

Národné lesnícke centrum (NLC) | Published December 5, 2014
Winner
Right Power Energy, s.r.o.
cpvs
09310000

Electricity for NFC, including taking responsibility for deviation. The anticipated period of power supply to points of delivery of the contracting authority: from 01.01.2015 to 31. 12. 2016 (for 2 points of supply from 1. 4. 2015 to 31. 12. 2016).

Electricity

Národné lesnícke centrum (NLC) | Published October 31, 2014
cpvs

Dodávka elektrickej energie

Supply of electricity.

Národné lesnícke centrum (NLC) | Published October 6, 2014  -  Deadline October 23, 2014
cpvs
09310000

Supply of electricity for the NLC, including taking responsibility for deviation. Expected period of power supply to delivery points of the contracting authority: from 1.1. 2015 31 12 2016 (2 to take points from 1 4 2015 31 12 2016).

Electricity for NLC

Národné lesnícke centrum (NLC) | Published October 22, 2014
cpvs

Dodávka elektrickej energie pre NLC

Repairs of electric rotary machines

Železničné opravovne a strojárne Zvolen, a.s. | Published August 1, 2017  -  Deadline January 9, 2017
cpvs
50532000

Repairs of electric rotary machines in accordance with the provisions of the regulation for the repair of electric rotary machines of PTO 48/83 and in accordance with the relevant UIC regulations, technical standards EN, STN, TNŽ, guidelines and standards for the repair of rolling stock, no. 513/2009 Coll., On the tracks, according to MDPT SR Decree no. Decree No. 205/2010 Coll. On specified technical devices and activities and activities on specified technical devices, according to MDPT SR Decree no. 351/2010 Coll. On the Traffic Code of Railways, as amended by the Decree of the Ministry of Foreign Affairs of the Slovak Republic no. 12/2012 Coll., In accordance with applicable regulations of the Railway Company of Slovakia, as and other related regulations, in accordance with other legal regulations in force in the Slovak Republic - Orders for II. Q 2017

Guest house guards of Zvolen - renovation and construction work

Jozef Cibula - HOSTINEC STRÁŽE NAD ZVOLENOM | Published February 6, 2015
Winner
BARBITRANS, s.r.o.
cpvs
45212411

The contract is carrying out renovation and construction work related to modernization inns guards over the elected: a.Rekonštrukcia inn building b.Vybudovanie covered terrace c.Rekonštrukcia cottages d.Spevnenie surface area for entering the inn e.Vonkajšie connections to the cottages sewerage, water supply, electrical Lighting f.Oplotenie and landscaping g.Terénne and landscaping

Industrial machinery

Obalprint, a.s. | Published November 21, 2015
Winner
Soma spol. s r.o.
cpvs
42000000, 42990000, 42991000

The contract is the delivery of goods: previnovací cutting machine, including related service of his supply, in the light of the detailed description of the subject of the contract, which is listed in a separate section labeled specifications B.1 Description of the object of the contract. Related services: transport, installation, validation (test equipment, test machine), staff training, technical documentation and electrical diagrams, warranty service.

Oil Sewerage IX. Elementary school, youth 587/17 Square in Zvolen

Základná škola | Published July 22, 2015
Winner
LS spol. s r.o.
cpvs
45232410, 45332300

The object of the acquisition of Oil Sewerage works at IX. Elementary School, Youth Square 587/17, Zvolen. This is a repair, replacement and rebuilding horizontal drains that drain waste water from the kitchen to the public sewer via Grease. This is the replacement sewer lines including replacement of concrete sewage shafts and exchange of grease. In connection with the exchange will be implemented sewer construction work - dismantling large-scale electrical kitchen equipment and kitchen areas vacated, - demolition of ceramic tiles, floors and external surfaces (finished flooring: ceramic tiles, PVC, concrete screed, etc.) in accordance with PD than in the interior and outdoor education, while in demolition work and earthwork excavation should be approached cautiously, because in these places are also other distribution network (water supply, electrical), - removal and dismantling of the original sewers, floor drains, manholes, grease and the other part of the solution drains - laying and installation of new sewers, floor drains, manholes, grease and other part of the solution drains by PD - earthworks (excavation and trenching, shoring, shroudings, powders) Base concrete and obetonávky - patching respectively. implementation of new tiles and flooring, including the affected finishes in exterior (the restoration) - disposal, removal and storage of demolishing rubble and other construction waste arising in the landfill,

Greening combined production of electricity and heat in Zvolenská teplárenská Inc.

Zvolenská teplárenská, a.s. | Published March 3, 2017  -  Deadline March 4, 2017
cpvs
45000000

The contract is the execution of works for the construction of buildings: Greening the combined production of electricity and heat in Zvolenská teplárenská Inc., which essentially seeks to greening its current source of heat for electricity production and for heat supply to external customers, which is in the form of steam and hot water. Detailed definition of the object of the contract described in Volume 3 - Description of the object of the contract specifications.

Restoration of the building of the Old Town Hall Square SNP 21/31 Zvolen

Mesto Zvolen | Published August 13, 2015
Winner
BEGBIE, s.r.o.
cpvs
45000000, 45212000

The contract works are aimed at the rehabilitation / reconstruction of historical buildings of the Old Town Hall. The building is an immovable cultural monument. The scope of work defined by the project documentation for the implementation of processed Ing. Henry Pitoňák, authorized architect, report and assessment. The project issued statements of all the parties and participants of the construction costs. Construction works are: -sanácia and treatment of the truss, replacement of metal sheet of titanium-zinc plate, chimney repair, get to the attic, -reštaurovanie facade plaster and metal accessories, including their production (consoles, grilles) -sanácia balcony and new balcony railings, -EXCHANGE gateways, -klampiarske structure of titanium-zinc sheet (roof plumbing construction, rainwater downpipes and gutters, exterior window sills), -obitie moist interior plaster in the basement and renovation plaster, -sanácia static disorder in the ceiling above the basement, -reconstruction bathrooms on the first floor (tiles, floor tiles, sanitary ware), -Klimatizace providing ventilation and air exchange in bathrooms. equipment in the room designated as a center for prevention and first floor social hall on the second floor, -sanácia internal wooden doors and frames on the second floor, -Internal paintings, -in the town hall at the new wooden floor according to the proposal (parquet, The historic) , -delivery and installation of the shift in terms of social halls, electrical installation, including exchange-Adjusts the lighting and illumination of facades, -bleskozvod -terénne adjustments (gutter pavement, the English courts, paved areas in front of the entrance door), -oprava water connection, sewage connection, including -oprava implementation of two Manhole. -odvoz and disposal of construction waste more detailed specification is indicated in the design documentation and bill of quantities, which are part of the specifications.

Restoring the Old City Hall Building on the SNP Square in Zvolen 21/31

Mesto Zvolen | Published February 16, 2015  -  Deadline March 5, 2015
cpvs
45000000, 45212000

The contract works are aimed at the rehabilitation / reconstruction of the historic building of the Old Town Hall. The building is an immovable cultural monument. Scope of work defines project documentation for processed Ing. Henry Pitoňák, authorized architect, report and assessment. The project was issued statements of all the parties and participants of the construction costs. Construction works are: -sanácia and update the roof, metal roofing replacement of titanium-zinc sheet, chimney repair, get into attics, -reštaurovanie facade plaster and metal accessories, including their production (consoles, grilles), -sanácia balcony, new balcony railings, -EXCHANGE gateways, -klampiarske structure of titanium-zinc sheet (roof plumbing construction, rainwater downpipes and gutters, exterior window sills), -obitie moist interior plaster in the basement and Remediation plaster, -sanácia static disorder in the ceiling above the basement, -reconstruction social facilities on the first floor (tiles, floor tiles, sanitary ware), -AIRCONDITIONING ensuring ventilation and air exchange in the bathroom. equipment in the room designated as a Center of prevention on the 1st Floor and the town hall on the second floor, -sanácia internal wooden doors and frames on the 2nd Floor, -Internal paintings, -in the town hall at the new wooden floor under the proposal (parquet, The historic) , -delivery and installation of sliding perspective in social halls, including the exchange Adjusts electrical lamps and illumination of facades, -bleskozvod -terénne matter (gutter pavement, the English courts, paved area in front of the entrance door), -oprava water connection, sewer connections, including -oprava implementation of two Manhole. -odvoz and disposal of construction waste more detailed specification is indicated in the project documentation and bills of quantities, which are part of the specifications.

Purchase of electricity and natural gas

Špecializovaný liečebný ústav Marína, š.p. | Published March 3, 2015
Winner
Nákup elektriny a zemného plynu
cpvs

Nákup elektriny a zemného plynu

Purchase of electricity and natural gas

Špecializovaný liečebný ústav Marína, š.p. | Published May 5, 2015
Winner
Slovenský plynárenský priemysel, a.s.
cpvs
09310000, 09123000

The contract is the supply of electricity, including the guarantees for variation and natural gas for the needs of the contracting authority.

Purchase of electricity and natural gas

Špecializovaný liečebný ústav Marína, š.p. | Published January 5, 2015  -  Deadline February 2, 2015
cpvs
09310000, 09123000

The contract is the supply of electricity, including the guarantees for the variation and natural gas for the needs of the contracting authority.

Kitchen remodeling school Sliač

Mesto Sliač | Published July 17, 2015
Winner
SOAR, spol. s r.o.
cpvs
45212500

Reconstruction of internal sanitary and electrical installations and the consequent need restoration flooring, tiles and plaster. Reconstruction is designed only in the dining room and the kitchen and the rooms around warehouses and sanitary equipment. In other parts of the building will be minimal interventions. Since the kitchen is the technology of varying quality, it is necessary to replace the hood. As part of the demolition is to rebel and unused chimney in the middle of the kitchen. Detailed description - project documentation.