Call +44 800 9755 164

Public tenders for electrical in Stockholm Sweden

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

Electrical engineering installation works

Aktiebolaget Stockholmshem | Published November 2, 2016  -  Deadline December 11, 2016

Electrical work associated with pipe replacement Mole Hill.

Electrical work associated with pipe replacement Mole Hill (2016-19812)

Aktiebolaget Stockholmshem | Published October 28, 2016  -  Deadline December 11, 2016
Electrical work associated with pipe replacement Mole Hill

Electricity supply installations

Ellevio AB | Published November 3, 2016  -  Deadline December 1, 2016
In Contracts includes eg Cable installation, excavation, plowing, substation works, overhead line work, races insertion works and associated electrical work. The contracts to be performed from Q3 2017 to end of 2019. The FFU will be sent out in Q1 2017.

Electricity supply installations

Ellevio AB | Published November 5, 2016  -  Deadline December 2, 2016
Starting in 2017, the 5 pieces of 40/10 kV substation located in Skaraborg replaced. New switchgear in indoor version will be built parallel to the existing with those still in operation. Finally demolished the old outdoor switchgear including control buildings.

Procurement of electricity (16/1)

NORDISKA MUSEET | Published December 2, 2016  -  Deadline January 11, 2017
Nordic Museum procures electricity for about ten items with the four different network owners.

Consultancy for the inspection of lighting installations in Stockohlm (T2016-03515)

Stockholms Stad, Trafikkontoret | Published December 2, 2016  -  Deadline January 24, 2017
City of Stockholm Traffic Office intends to conclude a framework agreement with a supplier who can provide consulting services for the inspection of public lighting installations. The mission includes mainly construction inspection in the form of A pre, final inspection and after inspection of electrical work performed in the traffic office works on public lighting installations located in the City.

Railway construction works

A-Train Aktiebolag | Published November 8, 2016  -  Deadline December 16, 2016

The contract related to the operation and maintenance of the Arlanda Link.

Trace facility consists of two parts, the southern bend, which begins at Skavsta village 29 + 300 km and continues to Arlanda airport. The northern bend starts during Arlanda airport and continues to Myrbacken at 146 + 800 km, where the plant connects to the main line. The total length is 17.5 km. In addition, about 4 km, which only served by the plant during Arlanda Airport.

The maintenance items that are included in the contract is the maintenance of:

- Court, including overhead;

- The structures;

- Mountain Tunnels, including related systems, such as drainage, firefighting water, ventilation, smoke evacuation, lighting, emergency lighting, etc. Tunnels at the stations south of Arlanda, Arlanda Arlanda northern and central part of the maintenance work;

- Concrete tunnels under the Arlanda;

- Yard at tågserviceanläggningen in Blackvreten;

- Escape routes, evacuation tunnels and access tunnels;

- Electricity, signaling for train operations;

- Service Road;

- Curare, signaling cabinets, booths and alcoves, associated electrical, signaling.

What above mentioned is not an exhaustive list of what is included / may be included in the contract.

  • 1