Electrical installation work

Solna stad | Published September 19, 2015  -  Deadline October 28, 2015
cpvs
45310000, 45315100, 50710000, 50711000

This request relates framework agreement for electrical works at Solna's properties as well as the city leased premises and properties belonging to Rasunda suburb AB. While other departments within the city, if requested, be able to use signed framework agreements. The agreement pertains to smaller contracts regarding electrical work. The framework agreement does not include operating, maintenance and service.

Framework agreements Electrical work (TND 2015: 360)

Solna stad | Published September 16, 2015  -  Deadline October 28, 2015
cpvs
45310000, 45315100, 50710000, 50711000

This request relates framework agreement for electrical works at Solna's properties as well as the city leased premises and properties belonging to Rasunda suburb AB. While other departments within the city, if requested, be able to use signed ramavtal.Ramavtalet intends smaller contracts regarding electrical work. The framework agreement does not include operating, maintenance and service.

Electrical services

Bostadsstiftelsen Signalisten i Solna | Published April 20, 2016
Winner
Projektengagemang Elmiljö Sverige AB
cpvs
71314100, 45310000, 71318100, 71530000

The contract relates to the signing of a framework agreement for the provision of consultancy services for the current call-off of all or part of the building process within the category Elkonsult. Framework agreements will be signed with four consulting firms.

Electrical services

Bostadsstiftelsen Signalisten i Solna | Published November 27, 2015  -  Deadline January 4, 2016
cpvs
71314100, 45310000, 71318100, 71530000

The contract relates to the signing of the framework agreement for the provision of consulting services for current call-off of all or part of the building process category Elkonsult. Framework agreements will be signed with four consulting firms.

Electrical wiring and fitting work

Trafikverket | Published June 24, 2016
cpvs
45311000, 45312100, 45314000, 45314100, 45314310, 45315000, 45315100, 45315300, 45316000, 45316110, 45316211, 45317000, 45331000, 45331210, 45332000, 45340000, 45350000

Advance information Installation Contracts, E4 Stockholm Bypass.

New pumping station for wastewater and stormwater Kolonnvägen, electrical and control works (Sleeping 2015: 30)

Solna Vatten AB | Published November 9, 2015  -  Deadline December 1, 2015
cpvs
45232431, 45231300, 45232000, 45232152

Within the framework of the expansion of the sewage system in and around Kolonnvägen should Solna Water Company to build a new pumping station for wastewater and stormwater in the grass area between Kolonnvägen and office buildings at Gårdsvägen. A performance contract involving land, management, construction and excavation work for this pumping station has påbörjats.Denna contracts relating to the electrical and control works on the above mentioned pumping station.

Electrical Power (TND / 2016: 1090)

Solna stad | Published September 1, 2016  -  Deadline October 11, 2016
cpvs
09310000

Procurement for the supply of electricity to the City of Solna, Rasunda suburban AB, Solna Water Company's facilities. See further administrative regulations point 2.4

Electrical Power (TND / 2016: 123)

Solna stad | Published March 23, 2016  -  Deadline May 9, 2016
cpvs
09310000

Procurement for the supply of electricity to the City of Solna, Rasunda suburban AB, Solna Water Company's facilities. See further administrative regulations point 2.4

HVC Lot 1 Fuel handling system for wood pellets.

Vattenfall AB Procurement Heat | Published February 24, 2016  -  Deadline March 29, 2016
cpvs
45250000, 42417200, 45251142, 65000000, 65400000

HVC boiler conversion from peat to wood pellets, Uppsala Sweden referred to as HVC Boiler conversion.

The scope of HVC Lot 1 is the delivery of a fuel handling system for wood pellets with a capacity of approximately 60 ton/h and a storage capacity of approx. 4 000 m3. The scope includes process design with function guarantees and delivery, installation and commissioning of process equipment. Included in the scope are fire and explosion protection and solutions for preventing spread of dust as well as delivery and installation of necessary electrical/instrumentation installation for Lot 1.

Related Civil works and general electrical installations will be procured separately in HVC Lot 3 which will also include all coordination and integration activities related to the works.

HVC Lot 3 General civil works and buildings.

Vattenfall AB Procurement Heat | Published February 24, 2016  -  Deadline March 29, 2016
cpvs
45100000, 45200000, 45250000, 45251142, 65000000, 65400000

HVC boiler conversion from peat to wood pellets, Uppsala Sweden referred to as HVC Boiler conversion.

The scope of Lot 3 is removal of old domestic waste depot under the construction site and delivery of civil works for Lot 1 and Lot 2 including receiving station, storage silo, milling building and foundations for conveyors. Included in the scope is HVAC for the buildings, general electrical installations, general piping installation and fire protection.

HVC Lot 2 Milling and combustion of wood pellets.

Vattenfall AB Procurement Heat | Published February 24, 2016  -  Deadline March 29, 2016
cpvs
42310000, 45250000, 45251142, 65000000, 65400000

HVC boiler conversion from peat to wood pellets, Uppsala Sweden referred to as HVC Boiler conversion.

HVC Lot 2 — Milling and combustion of wood pellets.

The scope of lot 2 is delivery of a milling system and replacement of existing burners for the existing heat only boiler with a capacity of 120 MW. The scope includes process design with function guarantees and delivery, installation and commissioning of process equipment. Included in the scope are fire and explosion protection and solutions for preventing spread of dust as well as delivery and installation of necessary electrical/instrumentation installation for Lot 2.

Civil works will be procured separately in lot 3 which will also include HSE coordination and integration activities related to the works.

Electricity

Solna stad | Published December 14, 2016
Winner
Switch Nordic Green AB
cpvs
09310000

Procurement for the supply of electricity to the City of Solna, Rasunda suburban AB, Solna Water Company's facilities. See further administrative instructions in paragraph 2.4.

Electricity

Solna stad | Published September 3, 2016  -  Deadline October 11, 2016
cpvs

Procurement for the supply of electricity to the City of Solna, Rasunda suburban AB, Solna Water Company's facilities. See further administrative instructions in paragraph 2.4.

Electricity

Solna stad | Published July 28, 2016
cpvs
09310000

Electricity

Electricity

Solna stad | Published March 25, 2016  -  Deadline May 9, 2016
cpvs
09310000

Procurement for the supply of electricity to the City of Solna, Rasunda suburban AB, Solna Water Company's facilities. See further administrative instructions in paragraph 2.4.

Electricity

Bostadsstiftelsen Signalisten i Solna | Published August 6, 2015
Winner
Energi Försäljning Sverige AB
cpvs
09310000

Signalling Tens contracts for physical and financial electricity purchase expires 31.12.2015 and the Client intends thereby to procure this service. The contract includes electric power for about 500 facilities (measuring points). The number of plants can, however, vary a lot during the contract period. The overall electricity consumption is estimated to be about 10 GWh per year. Consumption Volumes may change during the term. The Purchaser shall have the right to add / remove sites to the agreement during the agreement period. A list of the facilities included in the contract and the expected electricity consumption reported in Appendix 2 Plant List.

New Playground Bergshamravägen (15/27)

Solna stad | Published March 11, 2015  -  Deadline April 5, 2015
cpvs
45236000, 34928510, 45112000, 45112500, 45112723, 45231100, 45232000, 45236210, 45262300, 45315100, 45316100, 77300000, 77314100

Solna City procures construction of a new playground in Bergshamravägen work includes ground work, electrical work, wiring and equipment.

Electricity

Skatteverket | Published November 13, 2015  -  Deadline December 22, 2015
cpvs
09310000

Tax Board (SKV) and the bailiff (KFM) will procure electricity to their premises. SKV and KFM will write the respective framework agreements, with a single supplier. SKV estimated volume of future framework agreements for a total of about 50 million KWh of all extension options are used (max. Contract duration 4 years). The assignment means that the supplier initially agrees to sell electricity at variable prices, according to Nord Pool Spot. SKV and KFM will be able to switch between the mobile and the fixed price at intervals throughout the contract period.

Ventilation consultancy services

Bostadsstiftelsen Signalisten i Solna | Published April 20, 2016
Winner
Levin VVS-konsult Aktiebolag
cpvs
71321400, 71310000, 71321300, 90490000, 90713100

The contract relates to the signing of a framework agreement for the provision of consultancy services for the current call-off of all or part of the building process within the category Plumbing, Electrical and Control. Framework agreements will be signed with four consulting firms.

Ventilation consultancy services

Bostadsstiftelsen Signalisten i Solna | Published November 27, 2015  -  Deadline January 4, 2016
cpvs
71321400, 71310000, 71321300, 90490000, 90713100

The contract relates to the signing of the framework agreement for the provision of consulting services for current call-off of all or part of the building process within the category of HVAC, Electrical and Control. Framework agreements will be signed with four consulting firms.