Call +44 800 9755 164

Public tenders for electrical in Warsaw Poland

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

Electricity

„Przewozy Regionalne” Sp. z o.o. | Published February 17, 2017  -  Deadline March 6, 2017
cpvs
09310000

The contract is for the sale of electricity within the meaning of the Act of 10.4.1997 r. - Energy Law (Journal of Laws of 2017. Pos. 220), for own Purchaser.

Construction work

Główny Urząd Statystyczny | Published January 21, 2017
cpvs
45000000

Modernization of electrical lighting and sockets.

Warsaw: Purchase of electricity

Uniwersyteckie Centrum Zdrowia Kobiety i Noworodka Warszawskiego Uniwersytetu Medycznego Sp. z o.o. | Published July 21, 2016  -  Deadline August 31, 2018
cpvs
09000000, 09300000

The contract is for purchase of electricity under the provisions of the Act of 10 April 1997. Energy Law. The estimated electricity demand for the object included in the Detailed Description of the Contract in the period from 01.09.2016 r. To 31.08.2018 r. Is 610 MWh. Employer informs that the switching process takes place once again. The current energy supplier ENEA SA.

Fuses, caps, igniters and electric detonators

Inspektorat Uzbrojenia | Published January 25, 2017  -  Deadline March 2, 2017
cpvs
24615000

The contract is for delivery in the period 2017 - 2020 detonating gunpowder, in the amount of 580 000 m.

The fuse must meet the requirements specified in the standard defensive NO-13-A222: 2013 Engineer ammunition, fuse, gunpowder special, basic parameters and test methods - the admission of exceptions and additional requirements that were included in the terms of reference (TOR) - on this website web ordering - http://www.iu.wp.mil.pl

The fuse is subject to conformity assessment in the mode III, in accordance with Regulation of the Minister of National Defence of 01.11.2013 r. On the detailed list of products subject to conformity assessment and the manner and procedure of carrying out conformity assessment of products intended for defense of the state (OJ pos. 136 ).

Electricity, heating, solar and nuclear energy

PKP Intercity S.A. | Published February 3, 2017  -  Deadline March 3, 2017
cpvs
09300000

1. The contract is for the purchase of electricity in the indicated locations. Object of the contract has been divided into four distinct parts (tasks).

a) Part 1 -Purchase energy comprising the area of ​​the Head Office and the Department of the Central

b) Part 2 -Purchase energy comprising the area of ​​the Department of the North

c) Part 3 - energy purchase comprising the area of ​​the Department of the West

d) Lot 4 -Purchase energy comprising the area of ​​the Department of the South

2. Description of the order is specified in Chapter V of the SETC.

The contract for lot 1 is the purchase of electricity to the area headquarters and the Central Department. Estimated demand of electricity in the period of 24 months is 28 763 909.39 kWh.

Purchase of electricity to the North Plant. Estimated demand of electricity in the period of 24 months is 12 887 859.27 kWh.

The contract is for the purchase of energy for the Department of the West. Estimated demand of electricity in the period of 24 months is 3 403 472.90 kWh.

Purchase of electricity to the Southern Department. Estimated demand of electricity in the period of 24 months is 8 870 979.40 kWh.

Electricity, heating, solar and nuclear energy

Agencja Mienia Wojskowego | Published February 9, 2017  -  Deadline February 22, 2017
cpvs
09300000

The contract is for the supply of electricity includes sale of electricity to the real estate held by the Military Property Agency.

Supply of electricity to the Regional Branch in Lublin in the amount estimated for the period of 24 months - 2756480 [kWh] for zone I and 44 000 [kWh] for zone II.

Detailed information on points of PPE, tariffs and zones included in the tender documents.

Supply of electricity to the Regional Branch in Olsztyn, in the amount estimated for the period of 24 months - 463 094,00 [kWh] for zone I and 98 420 [kWh] for zone II.

Detailed information on points of PPE, tariffs and zones included in the tender documents.

Supply of electricity to the Regional Branch in Bydgoszcz in the amount estimated for the period of 24 months - 509 326,00 [kWh] for Zone I.

Detailed information on points of PPE, tariffs and zones included in the tender documents.

Supply of electricity to the Regional Branch in Cracow in the amount estimated for the period of 24 months - 112 040 [kWh] for Zone I.

Detailed information on points of PPE, tariffs and zones included in the tender documents.

Supply of electricity to the Regional Branch in Warsaw in the amount estimated for the period of 24 months - 2 188 396,00 [kWh] for Zone I.

Detailed information on points of PPE, tariffs and zones included in the tender documents.

Supply of electricity to the Regional Branch in Poznań in the amount estimated for the period of 24 months - 13 800.00 [kWh] for Zone I.

Detailed information on points of PPE, tariffs and zones included in the tender documents.

Electricity, heating, solar and nuclear energy

Uniwersytet Warszawski, Interdyscyplinarne Centrum Modelowania Matematycznego i Komputerowego | Published February 17, 2017  -  Deadline March 29, 2017
cpvs
09300000

Supply of electricity.

The contract is for the supply of electricity for the following points to join the University of Warsaw:

CB No. 12187 Street. Pawińskiego 5a, Warsaw.

CB ul. Guild 32, Warsaw.

Supply of electricity.

The contract is for the supply of electricity for the following points to join the University of Warsaw:

CB No. 12187 Street. Pawińskiego 5a, Warsaw;

CB ul. Guild 32, Warsaw.

The value of Z [MWh] = 30 000 MWh is the estimated amount given in order to determine the value of the order, which does not reflect the real or the declared use of electricity during the contract and in any event can not be the basis for any claims by the Contractor. The Contracting Authority reserves the right to reduce the amount of ordered electricity. The Contracting Authority reserves the right to change the size of the supply of electricity - with the proviso that the total size of the order will not be greater than Z [MWh].

Employer allows changing the points of connection in the course of the contract.

Electricity, heating, solar and nuclear energy

Agencja Mienia Wojskowego | Published February 17, 2017  -  Deadline March 3, 2017
cpvs
09300000

The contract is for the supply of electricity includes sale of electricity to the real estate held by the Military Property Agency.

Warsaw: SUPPLY OF ELECTRICITY FOR CENTRAL CENTRE geodetic and cartographic documentation

Centralny Ośrodek Dokumentacji Geodezyjnej i Kartograficznej | Published July 20, 2016  -  Deadline December 31, 2017
cpvs
09310000

1.Przedmiotem contract is the supply of electricity for the needs of Central Documentation Centre of Geodesy and Cartography of 2 buildings located in Warsaw at ul. John Albert 94 B, and in Lesznowola Street. Polish Army 81, under the conditions described in this Terms of Reference hereinafter referred to as the Terms of Reference. The supply must be in accordance with the provisions of the Act of 10 April 1997. Energy Law (Dz. U. of 2012. Item. 1059, as amended.) And the regulations to the Act. 2. In order to describe the object of contract, the Contracting Authority approved that: 1) Estimated total energy consumption during the delivery period is 1790000 kWh 2) The total contracted capacity for abstraction points is 352 kW. 3.Szczegółowe information on the consumption points is described in Annex 1 to the ToR ..

Electricity, heating, solar and nuclear energy

Biuro Ochrony Rządu | Published February 8, 2017  -  Deadline March 14, 2017
cpvs
09300000

Supply of electricity to buildings Government Protection Bureau in m. Warszawa, Raducz and Gdańsk.

Parts of railway or tramway locomotives or rolling stock; railways traffic-control equipment

Metro Warszawskie Sp. z o.o. | Published February 17, 2017  -  Deadline March 28, 2017
cpvs
34630000

The contract is for the supply of "spare parts for subway cars Series 81" broken down into tasks:

Task I - delivery of electronic components,

Task II - supply of mechanical parts,

Task III - supply of electrical components,

Task IV - the supply of pneumatic components,

Task V - supply of spare regulated by the Act on waste electrical and electronic equipment,

Task VI - delivery of electronic components (software) regulated by the Act on waste electrical and electronic equipment.

All delivered parts have to be brand new.

Delivery of electronic components according to the list.

Delivery of mechanical parts according to the list.

Delivery of electrical parts according to the list.

Delivery of pneumatic accordance with the list.

Delivery of spare regulated by the Act on waste electrical and electronic equipment in accordance with the list.

Delivery of electronic components (software) regulated by the Act on waste electrical and electronic equipment in accordance with the list.

Architectural, construction, engineering and inspection services

Zakład Gospodarowania Nieruchomościami w Dzielnicy Praga–Południe m.st. Warszawy | Published February 8, 2017
cpvs
71000000

Execution of project-estimate the electrical system of obtaining permits for the renovation of five buildings administered by zgn in Praga-South Capital City Warsaw. Part 1 for buildings: ul. Minsk 24, 26, 28. Part II buildings at ul. Minsk 32/36, deaf 3A.

Laboratory, optical and precision equipments (excl. glasses)

12 Terenowy Oddział Lotniskowy w Warszawie | Published January 25, 2017  -  Deadline March 3, 2017
cpvs
38000000, 50000000

The contract is for the supply of assembly and the accompanying work within the task "Adaptation antenna tower DB-110 for mounting the dome antenna" at the airport Lask, including among others, works in building structures, electrical installations and air conditioning for the installation of the dome of random on an existing tower reinforced concrete.

The contract is for the supply of assembly and the accompanying work within the task "Adaptation antenna tower DB-110 for mounting the dome antenna" at the airport Lask, including among others, works in building structures, electrical installations and air conditioning for the installation of the dome of random on an existing tower reinforced concrete.

Detailed information about the order given in the Terms of Reference on the website of the Employer www.12tol.wp.mil.pl

Construction work

Ministerstwo Kultury i Dziedzictwa Narodowego – Centrum Edukacji Artystycznej | Published January 19, 2017  -  Deadline February 27, 2017
cpvs
45000000, 45331200, 45331100, 45310000, 45421100, 45320000

Documentation consists of files in the folder to which access has been indicated in the announcement on the website of the Employer dedicated przedmiotowemu proceedings. 

Documentation consists of files in the folder to which access has been indicated in the announcement on the website of the Employer dedicated przedmiotowemu proceedings.

In particular, the contractor is obliged to perform the following works:

a) Installation of mechanical ventilation and air conditioning,

b) Replacement of the electrical system of internal and external lighting,

c) Execution of electrical installations low current

d) Execution of lightning protection,

e) Installation of photovoltaic panels on the facade of the building,

f) Execution of specialist equipment concert hall,

g) Make a new substation (PEC)

h) Replacement of the heating system

i) Replacement of plumbing,

j) Performing a new installation of storm water drainage, installation of heated inlets divisions of rain,

Warsaw: PERFORMANCE REVIEW AND MAINTENANCE WIRING in educational institutions in the district of Mokotów in Warsaw

Miasto Stołeczne Warszawa Dzielnica Mokotów | Published July 25, 2016  -  Deadline August 31, 2017
cpvs
50700000

The contract involves making every quarter the technical review of individual installations and electrical equipment in 100 educational institutions in the district of Mokotów in Warsaw. The social clause: The contracting authority requires that the three persons proposed to carry out activities involving the execution of repair works - maintenance, were employed during the contract on the basis of a full-time job within the meaning of the Labour Code under par. 5 model contract ..

Insurance services

Instytut Matki i Dziecka | Published February 8, 2017  -  Deadline March 16, 2017
cpvs
66510000

Comprehensive Insurance Institute for Mother and Child.

Compulsory insurance of liability of performing medical activities

Voluntary insurance of civil liability of medical activities

Voluntary insurance of civil liability of business and property.

Property insurance against all risks

Insurance of electronic equipment in the system all risks

Insurance machines electrical damage.

Motor insurance.

Railway construction works

PKP Polskie Linie Kolejowe S.A. | Published February 15, 2017  -  Deadline March 22, 2017
cpvs
45234100, 45231400, 45234115, 71320000

The scope of tasks includes:

1) The realization of works in the following areas: surface and track bed, railway traffic control devices (SRK) unit and electrical power systems up to 1 kV, engineering structures, platforms, infrastructure passenger, rail crossings - road, elimination of redundant infrastructure.

2) Design documentation, including: development of as-built documentation, including the geodesic as-built documentation.

Warsaw: Reconstruction of a barracks building No. 301 along with the construction devices for internatowych CSŁiI in Zegrze - Case 43/2016

Stołeczny Zarząd Infrastruktury | Published July 27, 2016  -  Deadline March 30, 2018
cpvs
45400000, 45233200, 39144000, 45331000, 45314300, 45315300, 45311100, 45450000, 45200000, 77211400, 45332000, 45312300, 45314310, 45262700, 45430000, 39141000, 45331100, 45421000, 45312100, 45312320, 45440000

The subject of the public contract is the reconstruction of the barracks building No. 301 along with the construction devices for internatowych CSŁiI in Zegrze. Reconstruction of the building No. 301 include: - renovation of all storeys of the building; - Repair of staircases; - Roof repair; - Reconstruction of the surface of the building; - Minimum equipment rooms; - Repair of external stairs; - Reconstruction of sanitary installations, sewage, water, air conditioning, ventilation; - Reconstruction of the electrical installation including cable lines, power supply, cable routes, lighting installation; - Reconstruction of telecommunication installation in the expansion of cable ducts, installation of fire., SSWiN, cctv, rtv-TV, the local term vision of 09.08.2016 r. Hr. 10.00.

Warsaw: Development of design documentation and tender in the framework of the investment task. Adaptation of the main building at ul. Old at the Centre for Support of Families Family Warsaw with land development and the author's supervision.

Miasto Stołeczne Warszawa - Stołeczny Zarząd Rozbudowy Miasta | Published July 15, 2016  -  Deadline December 15, 2017
cpvs
71000000, 71300000, 71248000

Old at the Centre for Support of Families Family Warsaw with land development and the author's supervision. a) Characteristics of the facility. It is made in the traditional technology of masonry walls, a flat roof is not ventilated. Change of use will expand operations CWR Family Warsaw on new actions on behalf of children and their families. It is located in the urban New Town entered in the register of monuments under the number A-1196. b) The characteristic technical parameters of the existing building: 1) Built-up area of ​​the building - 181.93 m 2; 2) The floor area of ​​the building - 516 m2. c) Description of the material scope of works: 1) stabilization of foundations, assessment and repair of structural elements, protection of the escarpment; 2) Execution of thermo - the exterior walls, roof, replacement of windows and doors; 3) Reconstruction of the building (pom. Administrative - office, pom. Studio, rooms for social workers, utility room in the basement), etc .; 4) Interior design, compilation of a first equipment; 5) Reconstruction and installation of sanitary (which, water. - Can., Mechanical ventilation, air conditioning, fire protection.); 6) Reconstruction and electrical installations; 7) Execution of telecommunication installations (CCTV, LAN, SSWiN, intercom systems, fire.); Old, making new external stairs and sidewalks, green. The scope of the contract includes in particular: 1) the execution of all necessary starting materials for the design, including: a) updated maps for design purposes, b) execution of an inventory of the existing facility, together with an assessment of the technical condition with particular emphasis on the design and an indication of the elements necessary to replace or reconstruction in terms of: - architectural and construction elements design - 3 copies. - plumbing - 3 copies. - electrical and telecommunication installations - 3 copies. - land management with inventory greenery - 3 copies. c) to document the geotechnical and research geological terrain entire investment - 3 copies. d) development expertise the design - 3 copies. 2) Implementation of the project of building a multi-branch with all the necessary arrangements in 6 copies., comprising: a) land development plan includes, among others, design of green economy and green existing sidewalks, exterior stairs, b) architectural and building thermo-modernization and reconstruction of containing the energy performance of the building together with the certificate of energy performance for the building and geological documentation, c) installation projects - sanitary, electrical, telecommunication, d) information on BIOZ, e) developing expertise fire. agreed with the appropriate Commander PSP. 3) Execution of projects implementing works - in 6 copies. A) architecture with a scenario of fire, b) Architecture - Interior together with the statement and equipment c) architecture interior design with a book room, d) design, including design protection embankment and building before settling.

Sleepers

PKP Polskie Linie Kolejowe S. A. | Published February 9, 2017  -  Deadline February 24, 2017
cpvs
34947100

The contract is for the supply of 166 700 pieces of brand new manufactured in the 2016/2017 year, prestressed concrete sleepers PS-93/60 / E1 or PS-94/60 / E1, along with complete przytwierdzeniami system SB in the amount of 333 400 sets (333 400 units spacers podszynowych shaped, 666 800 units gripper elastic, 666 800 pieces of electrical insulation inserts) intended for installation in class 1 track on line 351 class load D3 under a contract separate pn. "Execution of works on the section leading elephant - Szczecin Dabie from km 128.680 to km 195.170 in the project" Work on the railway line E 59 Poznan Main - Szczecin Dabie. "