Public tenders for electrical in Tychy Poland

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

Electrical power systems design services

Gmina Miasto Tychy | Published April 26, 2017  -  Deadline June 5, 2017
cpvs
71323100, 71320000

The subject of the contract is the development of an energy audit, a description (expert opinion) determining the technical condition of existing lighting columns subject to modernization together with photographic documentation, design documentation and investment cost estimates for particular areas of Tychy. The subject of the order is divided into 4 parts (tasks), for which the ordering party allows partial submissions.

Detailed description of the object of the order is enclosed in Appendix 4 to Siwz.

Task No. 1 includes the project of lighting modernization in the first area separated from the borders of Tychy City, located between the streets:

Beskidzka - Sikorskiego - Home Army - Independence with Os, W, Przemysłowa, Metalowa, Fabryczna, Targiel, Strzelecka, Baikal and the junction of Auschwitz and Beskidzka.

Detailed description of the object of the order is enclosed in Appendix 4 to Siwz.

Task No. 2 includes the project of modernization of lighting in the area of ​​the second area separated from the city of Tychy, located between the streets:

Sikorskiego - Bielsko - Home Army - Oświęcim

Detailed description of the object of the order is enclosed in Appendix 4 to Siwz.

Task No. 3 includes the project of lighting modernization in the area of ​​the third area separated from the city of Tychy, located between the streets:

Railway line - Bielsko - Myśliwska

Detailed description of the object of the order is enclosed in Appendix 4 to Siwz.

Task No. 4 includes the project of lighting modernization in the area of ​​the fourth area separated from the city of Tychy, located between the streets:

Railway line - Bielsko / Katowicka together with Graniczna and Murarska.

Detailed description of the object of the order is enclosed in Appendix 4 to Siwz.

Electricity

Tyski Sport S.A. | Published January 3, 2017
Winner
Tauron Sprzedaż GZE Sp. z o.o.
cpvs
09310000

Sale of electricity for the City Stadium Tychy, ul. Education 7.

Electricity, heating, solar and nuclear energy

Master Odpady i Energia Sp. z o.o. | Published May 2, 2015  -  Deadline June 11, 2015
cpvs
09300000

The contract is for the supply of electricity to the Department of Inter-Municipal Waste Management Complex (MZKZOK) in Tychy, "The MZKZOK installed two units of the CHP Cogeneration HE-KEC-LG329-B power of 332 kW el each to produce renewable electricity and heat from biogas produced in horizontal dry anaerobic digestion and cogeneration PETRA one unit 460C type APL 3560 CCH with the power of 356kVA / kWel to produce renewable electricity and heat from landfill biogas. The total electric power three 1,020 kW cogeneration units. The Employer has a license in the generation of electricity in cogeneration, wydanąej by the ERO President Concession No. WEE / 958C / 13756 / W / EYE / 2014 / MMi1 of 24/03/2014. The Contracting Authority is not the final purchaser within the meaning of the Excise Tax Act and is liable to pay excise duty as an entity with a license to generate electricity. Object of the contract Local 11, Duration of the contract - 36 months from the date of signing the contract. Specifications power supply: Places inclusion in the mains MV-20 kV substation Urbanowice Section No. 1 and No. 2 I.2 ENERGY DATA Power Connection: Connection 1: 3050kW PPE code PLGZEO00000590748333000013339084 connection No. 2: 3050kW of PPE PLGZEO00000590748333000013339789 site of attachment to the network power: connection No. 1: MV cable connection powered by performing tapping the 20kV cable Urbanowice relations section No. 1- Tychy - Manuli. Connection No. 2: MV cable connection powered by performing tapping in relation 20kV cable Urbanowice Section No. 2 - Tychy - Hilton Foods 2. cordial. The network works with earthed neutral by forcing resistor to ground fault current at 500A values. Assumptions for electricity consumption: Expected power consumption of about 750 kW per month on port 1 and 2. The expected aggregate annual electricity consumption for the entire plant about 19 000 MWh in the period of 36 months. In MZKZOK will produce renewable electricity and heat from biogas. Expected production within 36 months at the level of 8,000 MWh to 15,000 MWh. All the energy produced in the first instance will be used to fund MZKZOK, and the surplus will be sold to the operator. Purpose of the acquired energy - MZKZOK personal use. Electricity consumption in Section Selective collection of municipal waste (PSZOK) in tariff group C11 Mikołowska long-Base Companies "TRANSPRZĘT" aggregate consumption within 36 months: about 50 MWh Expected power consumption of about 3 kW per month. Other terms of delivery Contractor shall not be entitled to any claim for download by the Employer is not expected maximum amount of energy. A possible change in the expected estimated consumption will not result in additional costs to the Employer, except settlement for the amount of energy actually consumed by the prices specified in the tender documents. Created as part of the task is required, if the necessary changes seller. The Supplier shall calculate the price that the Purchaser has no obligation to requirements planning of electricity in the day-hourly system meeting the requirements of the functioning of the electricity market in Poland. During the notice period the existing contracts of the Contractor is not entitled to remuneration. Electricity purchased under the Agreement will be consumed for the needs of the end user. Energy supplier is required no later than the conclusion of the agreement on the contract in question, have signed a distribution agreement with the Distribution System Operator (DSO) objects specific to the Employer. Supplied electricity must meet technical standards in accordance with the provisions of the Act of 10 April 1997. - Energy Law and Regulations implementing this law and European Union standards. Deadline for completion of the contract. Duration Contracts of 36 months from the date of signing the contract. Attachments on the subject of the Contract: Agreement No. DS. / SZ / SS / Master / 1/2014 of 06.09.2014 contract for the provision of electricity distribution services WO 06-1424 dated 2014-07-01 (dot. Distribution Department of electricity to the Inter-Municipal Waste Management Complex (MZKZOK) in Tychy)

Electricity, heating, solar and nuclear energy

Miejski Ośrodek Sportu i Rekreacji | Published January 26, 2017
Winner
Przedsiębiorstwo Energetyki Cieplnej Sp. z o.o.
cpvs
09300000

The contract is for gradual delivery of heat energy from the heating network for the needs of the objects managed by MOSiR in the period from 01.01.2017 r. Until 31.12.2017 r. For the supply of thermal energy, it is understood the heat supplied through a medium (hot water) for variable temperature, dependent on weather conditions according to the tables of regulatory temperatures for the heating system of Belgrade.

Electricity, heating, solar and nuclear energy

Tyski Sport S.A. | Published June 19, 2015
Winner
Przedsiębiorstwo Energetyki Cieplnej Sp. z o.o.
cpvs
09300000

The contract is to provide the Employer thermal energy supplies from May 2015. Municipal Stadium for the needs of Tychy. Ordered thermal power total: 3 800 MW.

Tychy: modernization of the transformer and power distribution facilities Hospital Megrez Sp. z oo

MEGREZ Sp. z o.o. | Published October 5, 2016  -  Deadline October 3, 2016
Winner
konsorcjum firm: PUH ELMAX Jan Żywicki i Elmax - Hurt Sp. J., ul. Frabryczna 25, 43-100 Tychy, kraj/woj. śląskie.
cpvs
45315700, 45317200

The contract is the modernization of the transformer and power distribution facilities Hospital Megrez Sp. z oo includes: - replacement of transformer units for transformers so. dry - exchange switchgear transformer station NN-panel 20 / 0.4 kV, - exchange of electrical installations in the public station transformer and distribution, - connecting the generator in automatic mode according to the attached: a) detailed design: b) Takeoff, c) STWiOR -em.

Tychy: Beer spa and other associated works at the Aqua Park in Tychach- supplementary contract for the construction of the Water Park in Tychy

Regionalne Centrum Gospodarki Wodno-Ściekowej S.A. | Published September 2, 2016  -  Deadline September 1, 2016
Winner
Mostostal Warszawa S.A., ul. Konstruktorska 11a, 02-673 Warszwa, kraj/woj. mazowieckie.
cpvs
45212212, 45300000, 45311000, 45400000

Object of the contract: a) Baths Brown and the related change of the system and the type of attractions in the area of ​​the sauna Water Park in Tychy on level 1; b) The necessary changes in systems of electrical and telecommunication installations resulting from the architecture; c) The necessary changes in systems, sanitary, heating and technological industry of architecture. The contract covers an area of ​​± 850 m2 Detailed description of the order and the manner of its execution is specified in the Documentation project, the Bill of Quantities Specifications and technical performance and acceptance of works developed for this contract in Annex 5 to the invitation ..

Electricity distribution

Gmina Miasto Tychy | Published February 7, 2015
Winner
TAURON Dystrybucja S.A.
cpvs
65310000

The contract is: "Distribution of electricity for street lighting, public buildings and public places located in the administrative boundaries of the Municipality of Tychy in the period from 1.1.2015 to 31.12.2017" For each unit will be prepared in Tychy Municipality of separate agreements for the distribution of electricity by the selected contractor. The list of electricity consumption is attached to IWZ 1b.

Buses and coaches

Przedsiębiorstwo Komunikacji Miejskiej Sp. z o.o. | Published October 30, 2015
Winner
SG Equipment Leasing Polska Sp. z o.o.
cpvs
34121000, 66114000

1.Przedmiotem contract is an operating lease, consisting of: a) the acquisition by the Contractor within the scope of his commercial activity and devotion to the Employer to use and enjoy the period, 1 wysokopokładowego tourist bus, biaxial, produced no earlier than in 2015, meets the technical requirements set out in the specification - Appendix 5 hereto. The Contractor shall provide the Employer Authorization / Contractor is obliged to obtain the commitment of the Seller to provide the Employer Authorization * (after the required training in the repair and maintenance of the bus) to perform maintenance and warranty of the bus in the following areas: transmission, drive axle, axles, filter air, exhaust and flue gas treatment, cooling system, drive shaft, suspension, Pneumatic system, braking, steering, wheels, tires, skeleton, flashings plastic parts, bumpers, windows, flaps maintenance, electrical, electronic, installation Electrical and lighting, heating, ventilation, air-conditioning, a digital video surveillance system, finish and furnishings, central lubrication system, door passenger seat, power supply system. * depending on whether the authorization grants the Contractor or the Contractor shall obtain the Seller's obligation to grant him authorization by the Employer. With the delivery of the bus contractor is obliged to provide full technical documentation including parts catalog. 5 of the Public Procurement Law provides for the application of the law of options. At the same time ordering described in the order specification supply of diagnostic equipment, specialty tools to perform technical services and current repairs and the redemption value - 1% - fee final paid with the last installment of the lease, for use by the Purchaser with the option to buy, hereinafter referred to as "option ". Settlement for providing a range falling within the scope of the option will be based on the price specified in the tender form (Appendix 1 hereto);

Buses and coaches

Przedsiębiorstwo Komunikacji Miejskiej Sp. z o.o. | Published July 29, 2015  -  Deadline September 3, 2015
cpvs
34121000, 66114000

The contract is for operating leases consisting of: a) the acquisition by the Contractor, within the scope of his commercial activity and devotion to the Employer to use and enjoy the period, 1 wysokopokładowego tourist bus, biaxial, produced no earlier than 2015, meeting the technical requirements presented in this specification - Appendix 5 hereto. Contractor is obliged to provide to the Employer Authorization (after the required training in the repair and maintenance of the bus) to perform maintenance and warranty of the bus in the area: transmission, drive axle, steering axles, air filter, exhaust and flue gas treatment, cooling system, the shaft propellant, suspension, Pneumatic system, braking, steering, wheels, tires, skeleton, flashings plastic parts, bumpers, windows, flaps maintenance, electrical, electronic, electrical installation and lighting, heating, ventilation, air-conditioning, video surveillance system digital video, finishes and furnishings, central lubrication system, door passenger seat, power supply system. With the delivery of the bus contractor is obliged to provide full technical documentation including parts catalog. 5 of the Public Procurement Act provides for the application of the law of options. At the same time ordering described in the order specification delivery of diagnostic equipment, specialty tools to perform technical services and current repairs and the redemption value - 1% - final fee paid with the last installment of the lease, in the case of use by the Purchaser with the option to buy, hereinafter referred to as "option ". Settlement for delivery falling within the scope of the option rights will be based on the price specified in the tender form (Appendix 1 hereto); b) the payment by the Employer to the Contractor, in agreed installments cash compensation in accordance with the conditions laid down in the tender documents. Detailed terms of the lease: a) the currency lease - PLN, b) equal to the lease payments, subject to subparagraph k), c) entry fee - no, d) security deposit - no e) the surrender value - 1% - final fee paid with the last installment of the lease, for use by the Purchaser with the option to buy, Purchaser reserves that do not allow addiction Insurer selection of Contractor's consent - insurance on their own (chosen by the Employer insurance company). g) the cost of registering a vehicle borne by the Contractor, h) cost of tax on means of transport, the Employer shall be held on the basis of costs re-invoice issued by the Contractor, i) the Purchaser allows payment charges incurred in the course of the contract (prompts, the fee for solution / resume contract, interest arrears, annexes, opinions, manufacturing of the new arrays, proof of registration in case of loss, etc.), and therefore they should not be factored into the offer price. j) the Employer does not provide collateral agreement in any form, k) variant of financing - variable, according to the changes in WIBOR for one-month interbank deposits (WIBOR 1M) Offers that do not contain the full range of the order will be rejected.

Chemical industry machinery

Pulverit Polska Sp. z o.o | Published October 18, 2016  -  Deadline November 18, 2016
cpvs
42993000

Extruder for the production of industrial powder coatings

The system consists of two components:

1.Dwu-screw extruder with a capacity of between 600 and 800 kg / h. having the following characteristics:

- Suitable diameter of the screw

- Heating and cooling unit

- Temperature control unit

- feeder

- heat exchanger

- An additional set of screws and bolts of working elements (1 set of additional two-bolt)

- Metal detector installed on the inlet feeder

- Declaration of conformity and CE marking

2. Suitable feeder cooled extruder with a performance in line with extruder - MAX. 1000 KG / H

- Cooling conveyor belt

- Integrated calender and breaker

- A seamless connection tape

- Electrical control panel

- Housing with stainless steel

- Electro-mechanical feed system

- Cooling in a closed circuit (tank, pump and heat exchanger).

Chemical industry machinery

Pulverit Polska Sp. z o.o. | Published August 26, 2016
Winner
Xtrutech Ltd
cpvs

The contract relates to 2 pcs. Of fixed assets:

1. The twin screw extruder with a capacity of between 600 and 1000 kg / h, with the following characteristics:

- The diameter of the screws: 300 mm

- Heating and cooling unit

- Temperature control unit

- feeder

- heat exchanger

- A set of screws and bolts of working elements (1 set of two screws)

- Metal detector installed on the inlet feeder.

- Required declaration of conformity and CE marking.

2. cooled conveyor belt with the following characteristics:

- Maximum capacity: 1000 kg / h

- Integrated calender and shredder

- Cooling conveyor belt

- A seamless connection tape

- Electrical control panel

- Housing with stainless steel

- Electro-mechanical feed system

- Cooling in a closed circuit (tank, pump and heat exchanger)

- Cold water system.

Chemical industry machinery

Pulverit Polska Sp. z o.o. | Published December 3, 2016
Winner
Xtrutech Ltd
cpvs
42993000

Extruder for the production of industrial powder coatings

system consists of 2 elements:

1.Dwu-screw extruder with a capacity of between 600 and 800 kg / hr. the following

characteristics:

- Suitable diameter of the screw

- Heating and cooling unit

- Temperature control unit

- feeder

- heat exchanger

- An additional set of screws and bolts of working elements (1 set of additional two-bolt)

- Metal detector installed on the inlet feeder

- Declaration of conformity and CE marking

2. Suitable feeder cooled extruder with a performance in line with

extruder - max. 1000 kg / h

- Cooling conveyor belt

- Integrated calender and breaker

- A seamless connection tape

- Electrical control panel

- Housing with stainless steel

- Electro-mechanical feed system

- Cooling in a closed circuit (tank, pump and heat exchanger).

Tychy: Performing extension ul. Raven to the street. Quail in Tychy

Miejski Zarząd Ulic i Mostów | Published July 15, 2016  -  Deadline August 1, 2016
cpvs
45233000, 45100000, 45110000, 45111000, 45232452, 45231220, 45232130, 45232300, 45233161, 45233221, 45233290, 45112710, 45314310, 45342000, 71323100, 77211400, 77314100

1. Road works, including: - the development of a project of temporary traffic organization, assembly, maintenance and dismantling of temporary traffic organization; - Preparatory work (measuring robots including surveying inventory-built, demolition of road elements, removal of trees and shrubs, fences demolition); - Earthworks (excavation); - The execution of a French drain; - Construction of the road with asphalt concrete with layers; - Construction of pavement with concrete paving stones with layers; - Construction of exits paving concrete with layers; - Construction of speed bumps with cobble stone; - Elements of streets (concrete curbs, edging concrete palisade of concrete slabs); - Adjustments of the nastudziennych; - Green Road; - Marking horizontal and vertical; - The construction of fences. 2. Electrical works - street lighting, including: - earthworks; - Laying of protective pipes; - Laying of cables; - Installation of lighting poles; - Measurements on the installation; - Grading the land and sow grass. 3. Robots energy, including: - earthworks; - Construction and installation (cable laying, installation joints, testing the cable line). 4. Robots gas, including: - earthworks; - Construction and installation (installation of pipelines, installation of protective pipes, marking the route of the pipeline, tightness and strength). 5. drainage work, including: - earthworks; - Construction and installation (strengthening trenches, laying pipes, leak test, teleinspekcja). 6. Robots telecommunication, including: - earthworks; - Assembly works (construction of cable ducts, laying of cables, measurements Final) ..

Reconstruction of Sewage Treatment Plant Tychy Urbanowice construction of a new station sludge dewatering

 | Published March 25, 2016  -  Deadline April 25, 2016
cpvs
45252121, 45111200, 45111230, 45223500, 45320000, 45110000, 45233000, 45223820, 45262500, 45223100, 45442000, 45223800, 45261200, 45262300, 45432100, 45431000, 45430000, 45420000, 45410000, 45442100, 45432200

Construction on the existing wastewater treatment plant, the new station sludge dewatering installations external sewage sludge, drinking water and technology, power cables and other infrastructure support. The project involves the construction of the station building sludge dewatering with equipment and technological installations, which locates the hall main dewatering station storage, preparation and dispensing polieletrolitu room electrical switchboard room control a sanitary toilet and washroom total area of ​​the designed building 528 m2 Total usable area planned building 514.71 m2 Total building capacity dewatering 6 407.00 m3 sheds adjacent to the building receiving position dewatered sludge to transport building area of ​​216 m2 biofilter air-purifying ventilation installations with a building area of ​​88 m2 pumping sludge fermented in an existing building adjacent to the underground tank sludge cable digested sludge section of existing pipe in the area of ​​the old sewage works of the new station roads and building area 1 471,00 m2 Detailed description of the contract and the manner of its execution is specified in the Documentation project, the Bill of Quantities Specifications and technical performance and acceptance of works developed for the purposes of this order in Annex 8 to the Terms of Reference ..

Reconstruction of the siphon with a connecting pipeline to discharge storm water drainage system at the pumping station from the street. Zygmunt.

 | Published February 10, 2015  -  Deadline February 25, 2015
cpvs
45000000, 45231300, 45310000

The contract is for the reconstruction of the siphon with a connecting pipeline to discharge storm water pumping station in the area from the street. Zygmunt range includes tasks m.in .: - the demolition of the existing building pumping stations and reservoirs covering existing steel structure shed after raising the walls of the tank above the ground; - Reconstruction pipeline pumped from pumping rainwater pipe section consisting of two strings pressed depending on the type of waste water discharged: * a string of rainy discharging effluent into the river Gostynka through the existing storm water drainage north of the existing pumping station, * a string of mixed sewage drainage and rain to existing sewage discharge pipe, where waste collector will go to the south; - Execution of supply and pump control after demolition of the building; - Execution of power and control valves work in the chamber detailed scope of work, method and technology of detail in Annex 7 to the Terms of Reference, which consists of: - Building Design stormwater pumping station canopies in Tychy by MSc. Marek Winiarski - Voltar SYSTEM Sp. z oo in Katowice - Modernization of pumping Z (P31) in Tychy - electrical industry, by M. Sc. Damian Szkabara - Voltar SYSTEM Sp. z oo in Katowice - Modernization of storm water pumping station in Tychy - Sanitary by Eng. Wladyslaw turmoil - Voltar SYSTEM Sp. z oo in Katowice.

Sport markings works

Regionalne Centrum Gospodarki Wodno-Ściekowej S.A. | Published January 13, 2015
Winner
<CONTACT_DATA_WITHOUT_RESPONSIBLE_NAME><ORGANISATION><OFFICIALNAME>Mostostal Warszawa S.A.</OFFICIALNAME></ORGANISATION><ADDRESS>Konstruktorska 11a</ADDRESS><TOWN>Warszawa</TOWN><POSTAL_CODE>02-694</POSTAL_CODE><COUNTRY VALUE="PL"/></CONTACT_DATA_WITHOUT_RESPONSIBLE_NAME>
cpvs
45212213, 45000000, 45100000, 45200000, 45300000, 45400000

Object of the contract includes a) the construction of the main building - building area approx. 7545 m², - area of ​​approx. 15 554 m², - gross volume of approx. 109 863 m³ - mirror surface water approx. 1 687 m²; b) the construction of a technical building with złącznikiem and building area approx. 393 m²: - the usable area of ​​approx. 345 m², - gross volume of approx. 1 769 m³; c) the construction of parking d) the construction of the outer sauna with floor area of ​​approx. 44 m²: - the usable area of ​​approx. 38 m², - volume of approx. 70 m³; e) the economic construction of a building with an area of ​​approx. 42 m²; f) internal roads, squares, terraces and walkways with floor area of ​​approx. 10 217 m² with necessary: ​​installations including water and sewage, ventilation, gas, biogas, what and cooling, heat recovery, nodes of cold and heat production (in the building of two power prądotwórczycho electrical power 400 kW each), technology pool water, electricity, teletechnical, instrumentation and connections: water, sewage and storm water, which as well as the necessary equipment. As part of the contract should also make full technological start-up facility and obtain a final decision on the permit to use.

Tychy: Modernization of air conditioning and ventilation in the Maly Theatre in Tychy Street. Hlonda 1

Prezydent Miasta Tychy | Published July 14, 2016  -  Deadline July 12, 2016
Winner
ADG sp. z o.o., ul. L Szabatowskiego 7, 41-500 Chorzów, kraj/woj. śląskie.
cpvs
45300000, 45331000, 45311200

The detailed scope of the contract includes: 1. Dismantling works including m.in .: Remove the pedestal existing installation process heat, -Removal existing ventilation, 2. Construction and further including m.in .: -Installation ceiling and execution revision ceiling, ceiling panels -Okładziny cement - włóknowymi, gypsum-painting paint emulsyjną- 3 times with priming, -Cleaning and disinfection of concrete channels, -Exchange existing launchers roof 3. General construction work including m.in .: -Poduszki of concrete B 15 under the steel structure frame, -Wypełnienie holes mineral wool, -Uzupełnienie covered with 1 layer of roofing asphalt baskets drainage and facjatach, -Uzupełnienie walls and walling up the holes in the walls of brick, -Ponowny installation of doors to the rooms fan 4. the construction work / demolition including m.in .: -Rozbiórka construction with bricks on cement mortar, -Wykucie slots for steel beams, 6 cm - Manual demolition of structural elements of concrete unreinforced gr. 15 cm - The removal of rubble from demolished structures, 5. Installation of the steel structure including m.in .: - Mechanical performance of blind holes for anchors with a rear metal pins anchor - Construction supports - frame - supporting structure under the air handling unit, 15 cm with reinforcement of the foundation - welded mesh. 6. The installation process heat including m.in .: - galvanized steel pipes - Insulation of pipelines with pipe coverings, - Circulation pump with electronic speed control - mesh filters settler - Valves, - Ball valve shut-off, - gauges with a siphon tube, - Technical thermometers - valve differential pressure - valve adjustable - Automatic air vent with shut-off valves - tightness tests and trials with making adjustments. 7. Installation of air conditioning in the m.in .: - air conditioning of offices, - Power supply cooling air handling system N1W1 - Air conditioners with accessories. 8. Installation of mechanical ventilation including m.in .: - Supply System 1 - air intake system 1 - 1 exhaust system - ejecting arrangement 1 - Supply System 2 - 2 air intake system - Exhaust system 2 - 2 ejector system - system Supply 3 - Layout 3 air intake - exhaust system 3 - ejecting arrangement 3 system Supply 4 - air intake system 4 - 4 exhaust system - ejecting arrangement 4 - Supply system 5 - 5 exhaust system 9. electrical Installation including m.in .: - wiring - forge a furrow - wires wires in PVC jacket - insulated cables single core - walled furrows Switchboards - installation boxes and distribution boards, along with the construction - installation of accessories modular switchboards, additional Resources - checking and trying to turn itself off, - installation of components, handles, etc., - screwing trays - installation of fire detectors - mounting sockets fire - installation of additional equipment and elements of SAP, - installation of power supply buffer, - winidurowe pipes laid under plaster - removal of the existing lighting fixtures, -ponowny installation of lighting fixtures in the final ground - suspended ceiling.
  • 1