Public tenders for electrical in Szczecin Poland

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

Szczecin: Execution of annual and five-year maintenance of electrical installations and lightning in facilities and buildings ZUT in Szczecin

Zachodniopomorski Uniwersytet Technologiczny w Szczecinie | Published July 18, 2016  -  Deadline July 12, 2016
Winner
AMPER Grzegorz Paczkowski, Popowo 29, 64-510 Wronki, kraj/woj. wielkopolskie.
cpvs
71630000, 71356100, 71355000

Object of the contract include: review of electrical installations in buildings ZUT in Szczecin, an overview of the installation of internal lighting, inspection of electrical installations external illumination, an overview of the installation of emergency lighting, an overview of the installation of lightning protection and earthing work, preparation of minutes of the made inspections of electrical installations, preparation of sketches on the carried out installation electrical and lightning. The detailed scope of the contract is given in Annexes No. 1A to 1D tender documents.

Construction work involving the reconstruction of the expansion of the paint shop in the building workshop No. 58 with the implementation of the reconstruction of exterior electrical wiring, sewage and external and internal distribution system for the whole building, located at the JW. 2117 in Kolobrzeg (PKOB 1274) ..

 | Published December 30, 2014  -  Deadline January 21, 2015
cpvs
45000000, 45300000, 45111291

2117 in Kolobrzeg (PKOB 1274), in particular on how to carry: a) the works, including demolition, earthworks, masonry, concrete, metalwork, steel structures, plastering works, thermal insulation and proof, execution coverings and linings walls floors, painting works, building insulation, construction roofing, flashings and drainage facilities, a band around the building, b) sanitary installations, including: internal central heating and mechanical ventilation, heating system, external plumbing, c) electrical installations including: internal electrical systems, lightning protection, power heating, electrical paint shop station, alarm system, d) land development, e) technology: Furnishing paint shop building with equipment necessary to meet the intended function of the building, according to the nature of the process equipment included documentation. 1) Contractor under the contract will receive a final decision on the permit to use, based on powers of attorney Employer. Transfer shall be subject to the decisions of the object, as well as operation and maintenance instructions: object, facilities and equipment associated with this object. Materials from the demolition of non-disposal contractor will manage on their own.

Electricity, heating, solar and nuclear energy

Zachodniopomorski Uniwersytet Technologiczny w Szczecinie | Published October 13, 2017  -  Deadline November 21, 2017
cpvs
09300000

The subject of the order is the purchase (purchase) of electricity to all objects of the West Pomeranian University of Technology in Szczecin - to its points of collection. A detailed description of the object of the contract, including the location of the objects and the description of the points of electrical power, is included in Annex No. 1 of the specification.

1. The subject of the order is the delivery (purchase) of electricity to all objects of the West Pomeranian University of Technology in Szczecin - to its points of collection. A detailed description of the object of the contract, including the location of the objects and the description of the points of electrical power, is included in Annex No. 1 of the specification.

2. This contract does not cover electricity distribution services. Distribution services will be provided on the basis of a separate agreement concluded with ENEA Operator Sp. z oo - the owner of the network to which the Purchaser's facilities are connected.

3. The execution of the order shall take place in particular under the conditions set out in the Energy Law of 10.4.1997 (Journal of Laws of 2017, No. 220) together with the implementing regulations issued on the basis of the delegations included in this Act.

4. The electricity at issue here shall be delivered to the end user, which means that the Purchaser is not an energy company.

within the meaning of the Energy Law Act.

5. The Ordering Party requires that the actions for the subject of this order be made in the manner and under the conditions set out in Chapter XV of the Specifications.

Repair of electrical installations in five drainage pumping stations in the district Sławno.

 | Published November 6, 2014  -  Deadline November 21, 2014
cpvs
45311100, 45311200, 45315600

1.2 Place of performance: Getting to the village Żukowo Maritime provincial road Koszalin Darlowo and continue along the path of the plates JOMB length of 100 m. Access to the village Jezierzany asphalt road Sławno-Jarosławiec. Distances by provincial Koszalin Darlowo and continue along a dirt road length of 55 m. Distances by provincial Koszalin Darlowo. Getting to the pumping station west bank of the River Hog, along the waterfront of the port state existing Task No. 1: Pumping Rusko-Darlowo II. General Function: drainage pumping station. Dewatered area: 520 ha. The chamber pumps: pow.26,52 m2. Mains Energa Operator conventional pumping power is 60kW. The pump units are mounted pump two pump units: type PR-24 with a capacity of 600l / s with an engine power of 40 kW type 40P-20 with a capacity of 250 / s with an engine power of 15 kW Control of pump units is done manually using the buttons on the facade switching and automatically switches float. Main switchboard The boxes are built: the main switch ŁR-400, and meter energy metering system, apparatus safety and control of pump units and pumps lubricated, securing auxiliary counter hours of operation, static capacitors for reactive power compensation engine pumping units. Control is the type of float switches cameras LPA. The pumping station building is made of wires with Al-mounted installation of sockets 3 and 1 phase and lighting. The whole installation is provided for removal. Problem # 2: Pumping Głównica. General Function: drainage pumping station. The area drained 1 146 ha area inside the walls: 108m2 .Komora pumps: pow.53,56m2. Mains Energa Operator conventional pumping power is 135kW. Pump units are installed in the pumping station three pump units: 1 pump type PR-26 with a capacity of 700l / s, with an engine power of 45 kW pump No. 2 type PR-26 with a capacity of 700l / s, with an engine power of 45 kW pump No. 3 type PR-26 with a capacity of 700l / s, with an engine power of 45 kW units require lubrication pump sleeve bearing - grease guns are mounted. The boxes are built: the main switch płpośredni energy measurement system, safety equipment, and control of pump units, securing auxiliary counter hours of operation, static capacitors for reactive power compensation engine pumping units. The control is done manually with the elevation of the switchgear. The pumping station building is made of wires with Al-mounted installation of sockets 3 and 1 phase and lighting. The whole installation is provided for removing Problem # 3: Pumping Bukowo Sea. General Function: drainage pumping station. Dewatered area: 150 ha. 23.3 m2. Building 2 pumping station: year of construction: before 1945, storied, brick, gable roof covered with tile, Mains Energa Operator supply system and energy measurement shall not be rebuilt. The pump units are mounted pump two pump units: unit 1 type PR-17 with a capacity of 300l / s with an engine power of 22kW unit No. 2 type PR-17 with a capacity of 300l / s with an engine power of 22kW Control of pump units is done manually with the on the facade switching and automatically float switches. Main switchboard The boxes are built: the main switch ŁR-400, protective equipment, and control of pump units and lubricating pump, auxiliary circuits protection counter hours of operation, static capacitors for reactive power compensation engine pumping units. Control is float switches - equipment type LPA. The pumping station building is made of wires with Al-mounted installation of sockets 3- and 1-phase and lighting. The whole installation is provided for removal. Problem # 4: Pumping Dabki. General Function: drainage pumping station. Dewatered area: 620 ha. The chamber pumps: pow.19,5m2. Mains Energa Operator supply system and energy measurement shall not be rebuilt. The pump units are mounted pump two pump units: unit 1 type PSP-3 with a capacity of 300l / s with an engine power of 20 kW generator No. 2 type PSP-3 with a capacity of 300l / s with an engine power of 20 kW Control of pump units is done manually with the on the facade switching and automatically float switches. Main switchboard The boxes are built: the main switch securing auxiliary counter hours of operation, static capacitors for reactive power compensation engine pumping units. Control is the type of float switches cameras LPA. The pumping station building is made of wires with Al-mounted installation of sockets 3 and 1fazowych and lighting. The whole installation is provided for removal. Problem # 5: Pumping Rusko-Darlowo I Darłówko On

Szczecin: RENOVATION OF THE BUILDING OF THE FACULTY OF CONSTRUCTION AND ARCHITECTURE West Pomeranian University of Technology in Szczecin THE ZAD I - RENOVATION CORRIDOR IN ROOM 344 ​​ROOMS AND NO 332A, 332B, 332C, 332D, 332E, 312, 314 BUILDING AT AL.PIASTÓW then place the dowels 50 ZAD II - RENOVATION ROOM NO 124 BUILDING then place the dowels STREET. Żołnierska 50

Zachodniopomorski Uniwersytet Technologiczny w Szczecinie | Published August 18, 2016  -  Deadline July 26, 2016
Winner
MANILO Sp. z o.o. Sp. k., ul. Smolańska 4/205, 70-026 Szczecin, kraj/woj. zachodniopomorskie.
cpvs
45000000, 45450000, 45262522, 45410000, 45431200, 45421100, 45450000, 45442100, 45431100, 45310000, 45331000, 45400000, 45450000, 45421140, 45421153

The scope of the contract includes the construction work (bricklaying, plastering, painting, flooring works, installation of doors and transoms, suspended ceilings, reconstruction of the interior walls); sanitary industry (reconstruction of plumbing and what, reconstruction of mechanical ventilation), electrical industry (installing electrical switchgear, electrical repairs with equipment lighting, testing and electrical measurements, installation of sound and screens); industry teletechnicznej- associated with the reconstruction of interior walls seat, the platform and the cathedral.

Electricity

Generalna Dyrekcja Dróg Krajowych i Autostrad. Prowadzący postępowanie: Generalna Dyrekcja Dróg Krajowych i Autostrad, Oddział w Szczecinie | Published February 22, 2017  -  Deadline March 8, 2017
cpvs
09310000, 09300000

The contract is for the supply of electricity to the facilities operated by GDDKiA Branch in Szczecin. The details of the order is specified in Volume III (description of the contract) terms of reference.

Electricity

Województwo Zachodniopomorskie – Urząd Marszałkowski Województwa Zachodniopomorskiego | Published February 28, 2017
cpvs
09310000

The contract "Purchase of electricity for facilities Westpomeranian Region".

A detailed description of the order is attached as Appendix 1 hereto.

The contract "Purchase of electricity for facilities Westpomeranian Region".

Object of the contract must meet the requirements set out in the following regulations:

- Act of 10.4.1997 r. Energy Law

- Ordinance of the Minister of Economy of 04.05.2007 r. On detailed conditions for the operation of the power system,

- Polish Standard PN-EN 50160: 2010 Voltage characteristics of electricity supplied by public distribution networks.

List of points of energy consumption covered by the contract is attached to the terms of reference (Annex no. 1 hereto).

Electricity

Województwo Zachodniopomorskie – Urząd Marszałkowski Województwa Zachodniopomorskiego | Published January 21, 2017
cpvs
09310000, 65310000

The subject of this contract is a comprehensive supply of electricity including the sale and distribution services for electricity in accordance with the provisions of the Act of 10.4.1997 r. Energy Law (Dz. U. of 2012. Item. 1059, as amended. D.) For the Region Zachodniopomorskie and its organizational units. The total estimated energy consumption [MWh] in the period from 01.01.2018 r. To 31.12.2018. Will be approx. 32 000 MWh. The scope of the contract will be specified in detail in the description of the contract, the contract and the Annex no. 1 to the agreement (the customer list of facilities covered by the contract) are an integral part of the terms of reference.

Electricity

Województwo Zachodniopomorskie – Urząd Marszałkowski Województwa Zachodniopomorskiego | Published March 25, 2017
cpvs
09310000

The contract is for the purchase of electricity for facilities Westpomeranian Region.

Electricity

Generalna Dyrekcja Dróg Krajowych i Autostrad. Prowadzący postępowanie: Generalna Dyrekcja Dróg Krajowych i Autostrad, Oddział w Szczecinie | Published January 31, 2017  -  Deadline March 8, 2017
cpvs
09310000, 09300000

The contract is for the supply of electricity to the facilities operated by GDDKiA Branch in Szczecin. The details of the order is specified in Volume III (description of the contract) terms of reference.

Supply of electricity to facilities operated by GDDKiA Branch in Szczecin.

Electricity

Województwo Zachodniopomorskie – Urząd Marszałkowski Województwa Zachodniopomorskiego | Published August 27, 2016  -  Deadline September 28, 2016
cpvs

The contract is "Supply and distribution of electricity for objects organizational units of the Westpomeranian Region (comprehensive service) - the area of ​​distribution PKP Energetyka SA". A detailed description of the contract is given in Annex 1 to the Terms of Reference.

Electricity

Województwo Zachodniopomorskie – Urząd Marszałkowski Województwa Zachodniopomorskiego | Published September 23, 2016  -  Deadline October 3, 2016
cpvs
09310000

1.Przedmiotem contract is the purchase and distribution of electricity for objects organizational units Westpomeranian Region - (comprehensive service). " The contract was divided into 3 tasks in the areas of distribution points for electricity consumption:

Electricity

Województwo Zachodniopomorskie – Urząd Marszałkowski Województwa Zachodniopomorskiego | Published November 8, 2016  -  Deadline November 14, 2016
cpvs
09310000, 65310000

The contract is "Supply and distribution of electricity for objects organizational units of the Westpomeranian Region (comprehensive service) - the area of ​​distribution Energa - Operator SA".

Electricity

Województwo Zachodniopomorskie – Urząd Marszałkowski Województwa Zachodniopomorskiego | Published October 28, 2016  -  Deadline November 14, 2016
cpvs
09310000

The contract "Purchase of electricity for facilities Westpomeranian Region".

Electricity

Samodzielny Publiczny Szpital Kliniczny nr 1 PUM | Published October 31, 2015  -  Deadline November 23, 2015
cpvs
09310000

Elektryczność

Electricity

Samodzielny Publiczny Szpital Kliniczny nr 1 PUM | Published October 29, 2015  -  Deadline November 18, 2015
cpvs
09310000

Elektryczność

Electricity

Województwo Zachodniopomorskie – Urząd Marszałkowski Województwa Zachodniopomorskiego | Published November 22, 2017
Winner
PKP Energetyka S.A. z siedzibą w Warszawie
cpvs
09310000, 65310000

The subject of the agreement is the purchase and distribution of electricity for the needs of the organizational units of the Zachodniopomorskie Voivodeship - (comprehensive service). The list of energy consumption points covered by the contract and a detailed description of the subject of the contract is included in Annex 1 to the invitation.

The subject of the agreement is the purchase and distribution of electricity for the needs of the organizational units of the Zachodniopomorskie Voivodeship - (comprehensive service).

The subject of the order must meet the requirements specified in the following legal regulations: Law of 10.4.1997 Energy Law (Journal of Laws of 2017, item 220), hereinafter referred to as "Energy Law", Notice of Minister of Economy of 4.5. 2007

on the announcement of the consolidated text of the Regulation of the Minister of Economy on detailed conditions for the functioning of the power system (Journal of Laws of 2007, No. 93, item 623, as amended), Law of 20.5.2016 on energy efficiency (Journal of Laws 2016, 831), the Act of 6.12.2008 on excise duty (Journal of Laws 2017, item 43, as amended).

The purchase will be made on the basis of a comprehensive agreement concluded between the Zachodniopomorskie Voivodeship, ul. Corsarzy 34, 70-540 Szczecin and the Contractor.

The list of energy consumption points covered by the order and a detailed description of the object of the contract is included in Annex 1 to the invitation.

Electricity

Województwo Zachodniopomorskie – Zachodniopomorski Zarząd Melioracji i Urządzeń Wodnych | Published November 23, 2017  -  Deadline December 8, 2017
cpvs
09310000

III Description of the subject of the contract.

The subject of the order is "Purchase and distribution of electricity for the needs of facilities administered by the Zachodniopomorskie Board of Land Reclamation and Water Facilities in Szczecin (comprehensive service)".

Detailed description of the subject of the order is enclosed in Appendix No. 1 to SIWZ (together with the list of points included in Annex 2a, 2b to SIWZ).

The ordering party divided the order into the following parts:

1) Task No. 1 "Purchase and distribution of electricity for the needs of facilities administered by the Zachodniopomorskie Land Reclamation and Water Management Board in Szczecin (full service) - distribution area of ​​Enea Operator Sp. z oo "

2) Task No. 2 "Purchase and distribution of electricity for the purposes of administration administered by the Zachodniopomorskie Land Reclamation and Water Management Board in Szczecin (full service) - distribution area of ​​ENERGA - OPERATOR Sp. z oo "

The contractor is obliged to execute the contract on terms and conditions.

Common Procurement Vocabulary 09310000-5

(Electricity)

65310000-9

(Electricity transmission)

number of measuring systems used to calculate the electricity used 74

Total contracted capacity [kW] 3236

Tariff group According to the list in Annex 1 to the agreement

Estimated consumption during the contract period [MWh] 4125,530

Information on agreements currently in force, comprehensive agreement

Information on price changes during the term of the contracting entity does not provide for the change of the net unit price during the term of the agreement, apart from changes in the generally applicable law

Information on the availability of data on energy consumption points The Purchaser will make available all the necessary data necessary in the procedure of changing the seller in the Excel sheet.

Information on the application of unit prices for electricity distribution Unit prices of distribution parameters approved by the President of the Energy Regulatory Office will be introduced as of the date of implementation of the change.

Ordering party in case of change of tariff

OSD requires Contractors to send to the Buyer a relevant message containing new prices and the date of their implementation for settlement.

The manner of terminating the Contract does not require termination or termination

Information on the Employer's shares in promotional or loyalty campaigns The Client and Recipients did not sign any annexes concerning loyalty and promotional programs

Address of the West Pomeranian Voivodeship - Zachodniopomorskie Province Land Reclamation and Water Management Board in Szczecin

Teofila Firlika 19,

71- 637 Szczecin

Information on how to enter into a contract The contracting authority accepts the contract by exchange of correspondence by traditional or courier

The contractor is obliged to offer the same price for all points of energy consumption.

1 to the contract in the "T" column under the conditions set out in the Energy Law, in accordance with the regulations in force to the above mentioned. the provisions of the SETC and the electricity prices and the distribution parameters quoted in the tender presented on the basis of the current electricity distribution tariffs approved by the President of ERO.

The sale of electricity and the provision of electricity distribution services will take place within the framework of a comprehensive agreement on the terms and conditions laid down in the Energy Law and in accordance with the provisions of the Act.

Szczecin: Execution of additional works beyond the fixed remuneration consisting of the execution of the work defined in the project repair industry: sanitary (ie. Mechanical ventilation and air conditioning, water and sewage installation of a hydrant, what and medical gases), the electrical, architectural, konstrukcyjnej- within the framework of the task Construction of 2A with elevated helipad on the roof of the building and connectors functionally connecting building buildings 2A 2B, 2F and 1A

Samodzielny Publiczny Specjalistyczny Zakład Opieki Zdrowotnej "ZDROJE" | Published October 28, 2016  -  Deadline September 2, 2016
Winner
BUDIMEX S.A., ul. Stawki 40, 01-040 Warszawa, kraj/woj. mazowieckie.
cpvs
45000000

The execution of works further beyond the fixed remuneration consisting of the execution of the work defined in the project repair industry: sanitary (ie. Mechanical ventilation and air conditioning, water and sewage installation hydrant, as well as medical gases), the electrical, architectural, construction - within Construction of the building task 2A elevated helipad on the roof of the building and connectors functionally connecting building buildings 2A 2B, 2F and 1A.

Rolling stock

Województwo Zachodniopomorskie – Urząd Marszałkowski Województwa Zachodniopomorskiego | Published September 16, 2016
Winner
Newag SA
cpvs
34620000

The contract is "Execution and delivery of 17 units of electrical multiple units to operate