Plumbing and sanitary works

Gmina Siewierz | Published December 28, 2016  -  Deadline February 2, 2017
The project will run for up to 460 residential buildings (including building rectory) and 9 public buildings Commune Siewierz. 

The 6 public buildings should build a new installation of hot water using solar systems, including solar panels.

Salary will be determined as-built calculation, based on the unit prices of works and services covered by the contract referred to by the Contractor in the price calculation Appendix 7 of the Terms of Reference in accordance with the amount of work actually performed, confirmed by the Purchaser.

3.Zamawiający indicates that the price calculation, price concept for the type of the solar system can not exceed 2% of the price for the construction of the type of the solar system, the price of the project documentation for the type of the solar system may not exceed 5% of the price for the construction of the type of the solar system , the price of the project documentation for the public building shall not exceed 7% of the price for the execution of works in the public building.

Currently, the procedure for signing in / in contracts.

5.Realizacja tasks will be using the "Design and Build".

6.Projekt is co-financed by the European Union from the European Regional Development Fund under the Regional Operational Programme of Silesia for the years 2014-2020.

7.Każdy of 469 solar systems must be marked in a conspicuous place the sticker / label informing grants awarded in accordance with the labeling projects under the Regional Operational Programme of Silesia for the years 2014-2020.

The Contractor is obliged to prepare a report on the achievement of the environmental effect determining the value of these indicators after the completion of the task: - additional capacity to produce thermal energy from renewable sources [MW], - estimated annual decrease of greenhouse gas emissions [tonnes CO2 equivalent] - the degree of reduction in PM 10 [tons /year].

Shall specify the obligation of employment under a contract of work of all persons performing work under the supervision of the construction manager, works manager or Contractor, including the following activities

in the implementation of the contract: to perform plumbing, installation of electrical systems, installation of equipment and installation elements - according to par.16 model contract.

During the warranty period is valid Contractor free service and free installation overview at least 1 once a year and in the fifth year replacement of the heating medium for all installed systems.

The contractor may offer a longer warranty period up to 84 months, which will be taken into account during the evaluation and testing of tenders on the terms specified in Part XIX Terms of Reference.

The location of individual solar systems may vary within the Commune Siewierz.