Lighting equipment and electric lamps

Gmina Rzeczenica | Published November 7, 2017  -  Deadline December 12, 2017
cpvs
31500000, 45316110, 45311200, 45311000, 71355200, 45316100

The subject of the order is the replacement of 1274 inefficient and energy-saving lighting fixtures for energy-saving LEDs and booms together with the use of autonomous power reduction in luminaires located in communication lines and public access areas in the communes of Rzeczenica, Przechlewo and Czarne. The scope of the task envisages: electrical power works dismantling of luminaires and booms, electrical power works of mounting luminaires and booms, measurement and control works. The scope of work also includes the replacement of the power supply wires, the protection with the clamps on the overhead lines for the luminaires. The scope of investments does not include the replacement of posts or overhead lines and lighting cabins. Upon completion of the assembly, measurements of the impact resistance of the cable posts and photometric measurements shall be made.

Lighting equipment and electric lamps

Gmina Rzeczenica | Published October 31, 2017  -  Deadline December 12, 2017
cpvs
31500000, 45316110, 45311200, 45311000, 71355200, 45316100

Upon completion of the assembly, measurements of the impact resistance of the cable posts and photometric measurements shall be made.

The scope of works includes:

- installation of 22 timers in all lighting cabinets,

- replacement of luminaires and booms,

- replacement of wires for luminaires, safety devices and terminals on overhead lines,

Power factor tgφ. for the modernized lighting network throughout the lighting period, it is to comply with the requirements of the distribution network operator in order not to exceed the contractual consumption of passive energy;

- replacement of cables in cable posts,

- disassembled material to be disposed of for disposal or to the owner, depending on the decision of the owner of the disassembled property,

- execution of measurements of the effectiveness of anti-shock protection for cable posts,

- photometric measurements after retrofit prior to and after power reduction in luminaires for photometric calculations in design documentation,

- supply of software and necessary hardware allowing the maintenance engineer to change the parameters of the power reduction levels in the luminaires.

- as-built documentation.

It was designed to replace 285 luminaires. The total rated power of the luminaires after replacement must not exceed 16.66 kW.

For the construction of road luminaires, specified in the localities in Annex 1 to the technical documentation.

It is allowed to use equivalent luminaires below. conditions:

5 for technical documentation .. specified for individual roads in Annex 1 to the technical documentation.

The lighting equipment used must not exceed 16.66 kW of total installed capacity.

The equivalent luminaires must meet the following requirements:

- II class of fire protection

- color temperature of light sources not more than 4300K

- Color rendering index Ra ≥ 70.

- Impact resistance of luminaires ≥ 4 kV.

- Degree of protection IK min 08 for the luminaire (incl.

- Degree of protection IP 65.

In the case of park luminaires, black is acceptable.

- a minimum of 80% of the nominal light output at 60,000 h, due to the need to maintain electricity savings of electr. It is not possible to use in the luminaires the automatic reduction of the luminous flux (the luminaires must be constant during the life of the project);

- Shade made of glass for roadside or polycarbonate resistant to

- UV for park luminaires.

- LED current of not more than 700 mA.

- Hold a declaration of ownership allowing the manufacturer to place the CE mark and be admitted to trading in the territory of the Republic of Poland.

EU and confirm the performance in accordance with the standards that ENEC confirms.

- Adjustable luminaire angle not less than -10º + 10º.

- Programmable self-limiting luminous flux reduction at night to 3 reduction levels.

Light fittings must be programmed for power reduction before installation

between 23:00 and 5:00 to 70% of the rated value.

It is the Contractor's responsibility to achieve an ecological effect:

- the energy consumption after modernization is not more than 60 018 kWh per year;

- Reduction of CO2 emissions by not less than 77.56 [Mg / y], ie reduction of CO2 emissions by no less than 61.3%, which will be confirmed by the report (according to the model in the agreement) for each year of modernization. street lighting, starting with the report for 2018 until 2023.

The scope of works includes:

- installation of 36 timers in all lighting cabinets,

- replacement of luminaires and booms,

- replacement of wires for luminaires, safety devices and terminals on overhead lines,

Power factor tgφ. for the modernized lighting network throughout the lighting period, it is to comply with the requirements of the distribution network operator in order not to exceed the contractual consumption of passive energy;

- replacement of cables in cable posts,

- disassembled material to be disposed of for disposal or to the owner, depending on the decision of the owner of the disassembled property,

- execution of measurements of the effectiveness of anti-shock protection for cable posts,

- photometric measurements after retrofit before and after power reduction in luminaires for photometric calculations in the document. design,

- supply of software and necessary hardware allowing the maintenance engineer to change the parameters of the power reduction levels in the luminaires.

- as-built documentation.

Electricity, heating, solar and nuclear energy

Gmina Rzeczenica | Published August 29, 2015  -  Deadline September 23, 2015
cpvs
09300000, 09310000, 09000000

Energia elektryczna, cieplna, słoneczna i jądrowa

Electricity, heating, solar and nuclear energy

Gmina Rzeczenica | Published November 28, 2017
Winner
PGE Obrót S.A.
cpvs
09300000

The subject of this order is the supply of electricity to the objects listed in Appendix No. 1 to SIWZ with estimated electricity demand in the period from 1.1.2018 to 31.10.2019 is 17 319 335 kWh:

- in the period from 1.1.2018 to 31.12.2018 - 9 446 915 kWh

- in the period from 1.1.2019 to 31.10.2019 - 7 872 420 kWh

The detailed scope of the contract is specified in Appendix No. 1 to SIWZ, in accordance with the provisions of the Law of 10.4.1997 Energy Law. Other conditions concerning the execution of the contract are specified in the draft contract of sale of electricity - Appendix No. 2 to SIWZ.

The subject of this order is the supply of electricity to the objects listed in Appendix No. 1 to SIWZ with estimated electricity demand in the period from 1.1.2018 to 31.10.2019 is 17 319 335 kWh:

- in the period from 1.1.2018 to 31.12.2018 - 9 446 915 kWh

- in the period from 1.1.2019 to 31.10.2019 - 7 872 420 kWh

The detailed scope of the contract is specified in Appendix No. 1 to SIWZ, in accordance with the provisions of the Law of 10 April 1997 Energy Law. Other conditions concerning the execution of the contract are specified in the draft contract of sale of electricity - Appendix No. 2 to SIWZ.

Electricity supply will be provided on the basis of the provisions of the Act of 10.4.1997 - Energy Law (ie OJ of 2017, item 220, 791) and in accordance with the implementing regulations issued in this Act in particular with standards of customer service quality specified in the Ordinance of the Minister of Economy of 18.8.2011 on detailed rules of shaping and calculation of tariffs and settlements in electricity trading (Journal of Laws of 2013, item 1200).

Distribution services will be provided on the basis of a separate contract concluded by the Ordering Party with the relevant Distribution System Operator.

Electricity, heating, solar and nuclear energy

Gmina Rzeczenica | Published October 27, 2015
Winner
PGE Obrót S.A.
cpvs
09300000, 09310000, 09000000

The contract is for the supply of electricity with a total estimated volume of approximately 13 854 862 kWh with the right options is 18 011 321 kWh. Other conditions for the contract are set out in the draft agreement on electricity sales - Appendix 2 hereto. 1126, as amended. d.). Energa Operator SA

Petroleum products, fuel, electricity and other sources of energy

Zakład Gospodarki Komunalnej w Rzeczenicy Spółka z o.o. | Published December 16, 2015
Winner
Energia Obrót S.A.
cpvs
09000000

Comprehensive supply of electricity to the facilities Department of Public Utilities in Rzezczenicy.

Petroleum products, fuel, electricity and other sources of energy

Zakład Gospodarki Komunalnej w Rzeczenicy Spółka z o.o. | Published September 4, 2015  -  Deadline October 1, 2015
cpvs
09000000

Produkty naftowe, paliwo, energia elektryczna i inne źródła energii

Electricity, heating, solar and nuclear energy

Gmina Rzeczenica | Published August 18, 2015  -  Deadline September 23, 2015
cpvs
09300000, 09310000, 09000000

The contract is for the supply of electricity with a total estimated volume of approximately 13 854 862 kWh with the right options is 18 011 321 kWh. Other conditions for the contract are set out in the draft agreement on electricity sales - Appendix 2 hereto. 1126, as amended. d.). Distribution services will be provided under a separate agreement concluded by the Purchaser with the relevant Distribution System Operator, ie Energa Operator SA

Petroleum products, fuel, electricity and other sources of energy

Zakład Gospodarki Komunalnej w Rzeczenicy Spółka z o.o. | Published August 4, 2015  -  Deadline October 1, 2015
cpvs
09000000

COMPREHENSIVE SUPPLY OF ELECTRICITY FOR OBJECTS Department of Public Utilities in RZECZENICY.
  • 1