Public tenders for electrical in Kwidzyn Poland

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

Electricity

Gmina Kwidzyn | Published December 19, 2015  -  Deadline January 11, 2016
cpvs
09310000

Electricity

Electricity

Gmina Kwidzyn | Published February 2, 2016
Winner
ENEA S.A.
cpvs
09310000

1. The contract is for the supply of electricity in the period from 03/01/2016 to 30/06/2018 for the premises and facilities and for road lighting.

2. Distribution services will be provided under separate contracts entered into between the Purchaser (consumers / taxpayers) a distribution system operator (DSO).

3. The distribution system operator - as described in Appendix 1a, 1b column "Distribution System Operator".

4. The Contractor shall, on the basis of the granted power of attorney shall be obliged to report on their own behalf and the Purchaser (consumers / taxpayers) electricity sales agreement to the competent DSO in accordance with applicable regulations.

5. In the absence of important distribution agreements at the date of the sale agreement (Appendix 7a / 7b to the ToR), the Contractor (based on the granted power of attorney) will be obliged to deposit on behalf of the Employer (consumers / taxpayers) applications to conclude distribution agreements and to submit required by the OSD statement or agreement.

Petroleum products, fuel, electricity and other sources of energy

Miasto Kwidzyn | Published January 5, 2016
Winner
Obrót SA
cpvs
09000000, 09300000

Energy law.

Petroleum products, fuel, electricity and other sources of energy

Miasto Kwidzyn | Published October 20, 2015  -  Deadline November 25, 2015
cpvs
09000000, 09300000

The present contract is the purchase of electricity to the Employer objects and organizational units specified in Annexes 1, 2, 3 hereto, in accordance with the provisions of the Act of 10.4.1997 Energy Law.

Electricity

Gmina Kwidzyn | Published December 4, 2015  -  Deadline January 11, 2016
cpvs
09310000

1. The contract is for the supply of electricity in the period from 03/01/2016 to 06/30/2018 for the premises and facilities and for street lighting. 2. Distribution services will be provided under separate contracts entered into between the Purchaser (consumers / taxpayers) and the distribution system operator (DSO). 3. The distribution system operator - as described in Annex 1a, 1b column "Distribution System Operator". 4. The Contractor shall, on the basis of granted power of attorney shall be obliged to report on their own behalf and the Purchaser (consumers / taxpayers) contracts for the sale of electricity to the competent DSO in accordance with applicable regulations. 5. In the absence of important distribution agreements for the day of sale agreement (Annex 7a / 7b to the ToR), the Contractor (based on granted power of attorney) will be obliged to deposit on behalf of the Employer (consumers / taxpayers) applications to conclude distribution agreements and to submit required by the OSD statement or conclusion of a contract.

Kwidzyn: Reconstruction of the building forester White Manor.

Nadleśnictwo Kwidzyn | Published August 8, 2016  -  Deadline August 4, 2016
Winner
DOMBUD Usługi Ogólnobudowlane Bogdan Mielczarek, ul. Toruńska 21C, 82-500 Kwidzyn, kraj/woj. pomorskie.
cpvs
45211000, 45310000, 45332000, 45331100

Reconstruction of the building forester White Manor. Site: Ryjewo ul. Grunwaldzka 116, forestry White Manor, cadastral plot 223/1, cadastral Ryjewo. scope of work includes construction works in the field of buildings, electrical installations; water works and sewage; works in the central heating system. A detailed description of the contract include: construction project; technical specification and execution of construction works; bills of quantities ..

Petroleum products, fuel, electricity and other sources of energy

Miasto Kwidzyn | Published November 5, 2015  -  Deadline November 26, 2015
cpvs
09000000, 09300000

Produkty naftowe, paliwo, energia elektryczna i inne źródła energii

Kwidzyn: Adaptation of the building at ul. Warsaw 18 in Kwidzyn on the needs of the Day House Senior-Vigor

Miasto Kwidzyn | Published July 26, 2016  -  Deadline August 10, 2016
cpvs
45262500, 45262300, 45261000, 45261210, 45442100, 45421100, 45431100, 45431200, 45432130, 45421152, 45421146, 45332200, 45331100, 45311000, 45312200, 45312200

As part of the reconstruction they will also be carried out construction works in the building. SCOPE OF REPAIR: Robots External: - Reconstruction of sidewalks and entrances, - Repair of external stairs - Demolition dependence from the north-east - Repair of facades, - Repair of the insulation of horizontal and vertical foundation walls. Robots internal - Change of functional spaces, adaptation to new features (reconstruction of existing premises). - Replacement of windows and doors for new wood, restoration of the old in the new technology and the current performance while maintaining the historical character. - Replacing floors and floors, strengthening the existing structure of the joists. - Replacing the walls and ceilings, along with the implementation of fire protection. - Replacement of the roof structure, reconstruction of old. - Replacement of roofing. - Reconstruction of the porch, along with the reconstruction and construction of lifts for the disabled. - Replacement of the heating system - Changing the installation of water. ch. - Replacing the electrical system. - Implementation of the lightning protection system. - Implementation of the structural system. - Implementation of the system intrusion. - Implementation of the installation of fire alarm. - Reconstruction of ventilation systems and chimneys. A detailed description of the contract is the design-budget documentation and technical execution and delivery of the works, attached to the Contracting Authority: www.bip.kwidzyn.pl >> Public Procurement Municipalities urban Kwidzyn >> >> Current contract title. The Purchaser reserves to apply to the construction materials have the necessary technical approvals and safety certificates and hygienic certificates. Employer allows the implementation of the order the use of equipment and materials equivalent to the quality and raw materials used to make them the materials and equipment specified in the project documentation subject to approval by the Employer.
  • 1