Public tenders for electrical in Kostrzyn-nad-odra Poland

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!
ElectricalPolandkostrzyn-nad-odra

Electricity distribution

Burmistrz Gminy Kostrzyn, Urząd Miejski | Published November 10, 2015
Winner
ENEA SA
cpvs
65310000, 09310000

A detailed description of the contract, including the names and locations of objects, the forecasted demand for electricity during the contract period, the types of tariffs, contracted capacity, place of delivery and the necessary data to conclude an agreement included in Appendix No. 5 to the Offer. The actual settlement will take place on the basis of current indications of metering and billing for electricity supply in accordance with the Contractor's tender for electricity distribution will take place on the basis of the charges associated with the tariff for electricity distribution services Distribution System Operator properly. The condition of the option is run by the Purchaser to submit a written declaration of intent regarding the exercise of this option in the range specified by him. The Contracting Authority reserves the right to modify the collection points set out in the Annex. No. 5 to the offer during the contract period, depending on their needs - elimination of existing tollbooths. The Contracting Authority reserves the right settlement only on the basis of actual electricity consumption on energy intake points, or in the event of failure of the measuring device based on estimates by the Contractor invoices accepted by the Purchaser. The Employer shall not bear the costs arising from the occurrence of the need to replace the measuring systems in the tariff B and adapt these systems to the TPA principle. 623) Tariff for electricity distribution services properly the Distribution System Operator (DSO Tariff) Operation and Maintenance Manual Distribution Network (DGOMI) and generally applicable legislation. The Contractor is required to have at the commencement of comprehensive services contract with the Distribution System Operator, which are connected network objects Employer, enabling the provision of comprehensive services for facilities covered by the contract. After signing the agreement on public procurement contractor is obliged to: a) notice on behalf of the Employer and all units of electricity sales contracts and contracts for the provision of distribution services to individual objects, if such a necessity arises; b) to conclude a new comprehensive contracts or annexes to the existing comprehensive agreements for the supply and distribution of electrical energy for all objects involved in this proceeding with the appropriate unit. Andrzejewo 17, 62-025 Kostrzyn, on 08/20/2015. The estimated amount of energy delivered during the delivery period is 6 107 072 kWh (value during a period of 24 months): I. The energy accounted clock 5 490 466 kWh; II. energy settled in the zone of peak 207 240 kWh;

Electricity distribution

Burmistrz Gminy Kostrzyn Urząd Miejski | Published October 10, 2015  -  Deadline October 29, 2015
cpvs
65310000, 09310000

A detailed description of the contract, including the names and locations of objects, the forecasted demand for electricity during the contract period, the types of tariffs, contracted capacity, place of delivery and the necessary data to conclude an agreement included in Appendix No. 5 to the Offer. The actual settlement will take place on the basis of current indications of metering and billing for electricity supply in accordance with the Contractor's tender for electricity distribution will take place on the basis of the charges associated with the tariff for electricity distribution services Distribution System Operator properly. The Employer makes the opportunity to take advantage of this option by adding new points of electricity consumption and increased demand for the supply of electricity to run the EPP condition of the option is the submission by the Purchaser a written declaration of intent regarding the exercise of this option in the range specified by him. The Contracting Authority reserves the right to modify the collection points set out in the Annex. No. 5 to the offer during the contract period, depending on their needs - elimination of existing tollbooths. The Contracting Authority reserves the right settlement only on the basis of actual electricity consumption on energy intake points, or in the event of failure of the measuring device based on estimates by the Contractor invoices accepted by the Purchaser. The Employer shall not bear the costs arising from the occurrence of the need to replace the measuring systems in the tariff B and adapt these systems to the TPA principle. 623) Tariff for electricity distribution services properly the Distribution System Operator (DSO Tariff) Operation and Maintenance Manual Distribution Network (DGOMI) and generally applicable legislation. The Contractor is required to have at the commencement of comprehensive services contract with the Distribution System Operator whose network are connected objects Employer, enabling the provision of comprehensive services for facilities covered by the contract after the signing of the agreement on public procurement contractor is obliged to: a) notice in on behalf of the Employer and all units of electricity sales contracts and contracts for the provision of distribution services to individual objects, if such a necessity arises; b) to conclude a new comprehensive contracts or annexes to the existing comprehensive agreements for the supply and distribution of electrical energy for all objects involved in this proceeding with the appropriate unit. Andrzejewo 17, 62-025 KOSTRZYN, on 08.20.2015 r. Estimated amount of energy delivered during the delivery period is 6 107 072 kWh (value during a period of 24 months): I. The energy accounted clock 5 490 466 kWh II. energy settled in the area 207 240 kWh of peak III. energy settled in the area 409 366 kWh off-peak power with contracts for all collection points is a total of 2 639,5 kW The bid must be unambiguous and cover the full range of contract. Employer requires the Contractor to ensure the stability of the bid price until the end of the contract. SERVICES. To calculate the gross offer price Contractor accepts VAT rate of 23%. NOTES: 1) Employer does not provide an electronic auction. 2) The Purchaser does not provide for a framework agreement. 3) The Purchaser does not provide for the possibility of granting Contractor contractor performing the contract, payments towards the performance of the contract. 4) The Purchaser does not provide for the establishment of a dynamic purchasing system. 5) The Purchaser does not intend to convene a meeting of the contractors, unless such a need arises. 6) ordering provides for the possibility of correspondence by mail or fax em. 7) ordering a possibility of entrusting the execution of the contract to subcontractors, provided the Contractor of the contract, which it intends to entrust the Subcontractor. The Purchaser does not allow for partial bids. Supplementary orders is orders consisting exclusively on repeating the same type of supplies and services that were covered by the basic contract. Purchaser does not allow variant bids

Electricity distribution

Burmistrz Gminy Kostrzyn – Urząd Miejski | Published August 29, 2015  -  Deadline October 6, 2015
cpvs
65310000, 09310000

The contract is for the provision of comprehensive services involving the supply of electricity with electricity distribution services to the needs of the Employer, ie. To facilities owned and on the board of the Commune Kostrzyn and located in its territory. A detailed description of the contract, including the names and locations of objects, the forecasted demand for electricity during the contract period, the types of tariffs, contracted capacity, place of delivery and the necessary data to conclude an agreement included in Appendix No. 5 to the Offer. The actual settlement will take place on the basis of current indications of metering and billing for electricity supply in accordance with the Contractor's tender for electricity distribution will take place on the basis of the charges associated with the tariff for electricity distribution services Distribution System Operator properly. The condition of the option is run by the Purchaser to submit a written declaration of intent regarding the exercise of this option in the range specified by him. The Contracting Authority reserves the right to modify the collection points set out in the Annex. No. 5 to the offer during the contract period, depending on their needs - elimination of existing tollbooths. The Contracting Authority reserves the right settlement only on the basis of actual electricity consumption on energy intake points, or in the event of failure of the measuring device based on estimates by the Contractor invoices accepted by the Purchaser. The Employer shall not bear the costs arising from the occurrence of the need to replace the measuring systems in the tariff B and adapt these systems to the TPA principle. 623) Tariff for electricity distribution services properly the Distribution System Operator (DSO Tariff) Operation and Maintenance Manual Distribution Network (DGOMI) and generally applicable legislation. The Contractor is required to have at the commencement of comprehensive services contract with the Distribution System Operator whose network are connected objects Employer, enabling the provision of comprehensive services for facilities covered by the contract after the signing of the agreement on public procurement contractor is obliged to: a) notice in on behalf of the Employer and all units of electricity sales contracts and contracts for the provision of distribution services to individual objects, if such a necessity arises; b) to conclude a new comprehensive contracts or annexes to the existing comprehensive agreements for the supply and distribution of electrical energy for all objects involved in this proceeding with the appropriate unit. Andrzejewo 17, 62-025 Kostrzyn on 20.08.2015 r. Estimated amount of energy delivered during the delivery period is 6 139 296 kWh (value during a period of 24 months): I. The energy accounted clock 5 522 690 kWh II. energy settled in the area 207 240 kWh of peak III. energy settled in the area 409 366 kWh off-peak 1) Employer does not provide an electronic auction. 2) The Purchaser does not provide for a framework agreement. 3) The Purchaser does not provide for the possibility of granting Contractor contractor performing the contract, payments towards the performance of the contract. 4) The Purchaser does not provide for the establishment of a dynamic purchasing system. 5) The Purchaser does not intend to convene a meeting of the contractors, unless such a need arises. 6) ordering provides for the possibility of correspondence by mail or fax em. 7) ordering a possibility of entrusting the execution of the contract to subcontractors, provided the Contractor of the contract, which it intends to entrust the Subcontractor.

Kostrzyn: Reconstruction, extension and adaptation of the City Library in Kostrzyn, together with the needs of people with disabilities.

Miejska Biblioteka Publiczna w Kostrzynie nad Odrą | Published September 1, 2016  -  Deadline August 25, 2016
Winner
PHU IKAA Aneta Suchomel, ul. Jana Pawła II 1A, 66-470 Kostrzyn nad Odrą, kraj/woj. lubuskie.
cpvs
45212330, 45210000

The subject of the contract is works pn task: Reconstruction, extension and adaptation of the City Library in Kostrzyn, together with the needs of people with disabilities. The scope of works includes min: reconstruction and adaptation with the arrangement of existing rooms on the function of office and administrative salle workshop for visitors, library library, warehouses, sanitary facilities, construction platform of the lift adapted for disabled persons, exchange of plumbing, electrical, central heating , installation of mechanical ventilation and air conditioning systems, construction of a new external facade with colors ...

Kostrzyn: Reconstruction, extension and adaptation of the City Library in Kostrzyn, together with the needs of people with disabilities.

 | Published July 13, 2016  -  Deadline September 22, 2017
cpvs
45212330, 45210000

The subject of the contract is works pn task: Reconstruction, extension and adaptation of the City Library in Kostrzyn, together with the needs of people with disabilities. The scope of works includes min: reconstruction and adaptation with the arrangement of existing rooms on the function of office and administrative salle workshop for visitors, library library, warehouses, sanitary facilities, construction platform of the lift adapted for disabled persons, exchange of plumbing, electrical, central heating , installation of mechanical ventilation and air conditioning systems, construction of a new external facade with colors ..

Refuse and waste related services

Miasto Kostrzyn nad Odrą | Published January 6, 2016
Winner
Miejskie Zakłady Komunalne Sp. z o.o.
cpvs
90500000, 90511000, 90511200, 90513100

The contract is for the implementation of a service that serves the organization and the separate collection (referred to as "PSZOK") in the city of Kostrzyn 1.1 Organization and accessories These costs may not include other functions not related to the acceptance of waste from property owners living from the land Kostrzyn. Summary received in PSZOK waste and transfer card received in PSZOK proving their legal waste management will be transferred to the Employer and the invoice for the previous month. 1.2 Management of incoming waste contractor is obliged to indicate in the tender form or entities authorized installations which will provide the various types of waste to land-use or disposal. 1.3 Estimated amount of waste for collection PSZOK The Contracting Authority estimates that during performance of the contract to PSZOK will be delivered the following waste: 1) green 360 Mg 2) plastic multi-material packaging 30 Mg; 3) paper and paperboard 10 mg; 4) glass, colorless glass, and the colored glass 10 mg; 5) The biodegradable Kitchen 4 Mg; 6) large-scale 60 Mg; 7) waste electrical and electronic equipment 4 Mg; 8) of waste tires 30 Mg; 9) 2 Mg dangerous; 10) 1 Mg of used oils; 11) The construction and renovation and demolition of 400 Mg, 12) clothing and textiles 5 Mg. Contractor before the offer must be aware that, when given values ​​based on the calculation takes into account the risk of changes during performance of the contract. 1.4 Prepayments and compensation should be provided for all costs and fees associated with the performance of the contract.

Refuse collection services

Miasto Kostrzyn nad Odrą | Published March 10, 2015
Winner
Miejskie Zakłady Komunalne Sp. z o.o.
cpvs
90511000, 90512000, 90513100

The contract is for the implementation of the service including collection and recycling of municipal waste from property owners living and the organization and conduct of separate collection in the City of Kostrzyn, in accordance with the rules of cleanliness and order in municipalities - Resolution No. XXVIII / 216/13 City Council Kostrzyń Oder from 03.21.2013 as amended .: 1.1 Removal from all properties residing in the city Kostrzyn following fractions of municipal waste: 1) mixed (unsorted); 2) paper and cardboard; 3) glass, including glass colorless and colored glass; 4) made of plastic, metal and multi-material packaging; 5) kitchen biodegradable municipal waste and biodegradable packaging; 6) bulky waste, waste electrical and electronic equipment and waste tires; 7) issued after Christmas next to bins or containers lights on Christmas trees; 8) any other municipal waste containers defaulting next waste collection; 9) medicines collected in containers placed in the following points in Kostrzyna Oder: Jagiellonian 16/2, Water 6, Sikorski, 35, Sikorski, 12, Konopnickiej 1, limit 2, The number of residents indicated in the Annex may be increased or decreased up to 15 %. 1.2 Equipment by the Contractor of all properties residing in containers with parameters satisfying the provisions of the Rules of maintaining cleanliness and order in the city Kostrzyn and bags for municipal waste collection on the following principles: 1) a multi-family housing) containers for mixed municipal waste (segregated) with the inscription "mixed", b) containers for collection of paper and cardboard in blue with the words "paper and paperboard", c) containers for the collection of clear glass and colored in green with the word "glass", d) containers for the collection of plastic packaging multimaterial and metals in yellow with the word "plastic, metal and composite packaging", e) containers for the collection of biodegradable kitchen waste and biodegradable packaging in brown with the word "biodegradable kitchen." The proposal to replace the containers IGLOO or other mesh will be issued if they are in the location of their place difficulties in the timely receipt of the waste (eg. Not possible directions of the vehicle with the boom, the risk of property damage bystanders while collecting and parked cars), or there will be no delineation of space meeting the requirements. 2) vir_listalng_zabudowa_jednorodzinna a) containers for mixed municipal waste (segregated) with "mixed", b) to collect bags of paper and cardboard in blue with the words "paper and paperboard", c) to collect the bags of clear glass and colored in color green with the word "glass", d) bags for collecting plastic, metals and multi-material packaging in yellow with the word "plastic, metal and composite packaging", e) bags for the collection of biodegradable kitchen waste and biodegradable packaging in brown labeled "biodegradable kitchen." Sets the minimum capacity of bags: - blue - 120 dm3, - green - 120 dm3, - yellow - 120 dm3 - brown - 60 dm3. 1.3 Delivery, on the occasion of receiving the waste, the property living in detached houses or terraced prepared by the Employer flyers, brochures, etc. Informing about occurred during the execution of the contract changes for waste management or services (eg .: the change in regulations, a change fee for waste management or methods of counting, the change in the scope of services provided, rescheduling of waste collection, prints declarations, etc.). 1.4 Organization and conduct for separate collection of municipal waste in Kostrzyna Oder 1000 to 1800, for which he receives a proportionately greater number of points in the evaluation of bids, in accordance with the provisions of Chapter XIII siwz) to calculate the service PSZOK during its opening hours necessary to adopt provided by residents municipal waste should be provided for 1 person. Summary of waste received in PSZOK will be transmitted to the Employer and the invoice for the previous month.

Refuse collection services

Miasto Kostrzyn nad Odrą | Published January 3, 2015  -  Deadline February 11, 2015
cpvs
90511000, 90512000, 90513100

The contract is for the implementation of the service including collection and recycling of municipal waste from property owners living and the organization and conduct of separate collection in the City of Kostrzyn, in accordance with the rules of cleanliness and order in municipalities - Resolution No. XXVIII / 216/13 City Council Kostrzyń Oder from 03.21.2013 as amended .: 1.1 Removal from all properties residing in the city Kostrzyn following fractions of municipal waste: 1) mixed (unsorted); 2) paper and cardboard; 3) glass, including glass colorless and colored glass; 4) made of plastic, metal and multi-material packaging; 5) kitchen biodegradable municipal waste and biodegradable packaging; 6) bulky waste, waste electrical and electronic equipment and waste tires; 7) issued after Christmas next to bins or containers lights on Christmas trees; 8) any other municipal waste containers defaulting next waste collection; 9) medicines collected in containers placed in the following points in Kostrzyna Oder: Jagiellonian 16/2; Water 6; Sikorski 35; Sikorski 12; Konopnickiej 1; Border 2. The number of residents indicated in the Annex may be increased or decreased up to 15%. 1.2 Equipment by the Contractor of all properties residing in containers with parameters satisfying the provisions of the Rules of maintaining cleanliness and order in the city Kostrzyn and bags for municipal waste collection on the following principles: 1) multi-family housing: a) containers for mixed municipal waste (segregated) from the word "mixed"; b) containers for collection of paper and cardboard in blue with the words "paper and paperboard"; c) containers for the collection of clear glass and colored in green with the word "glass"; d) containers for the collection of plastic and metal packaging multimaterial in yellow with the word "plastic, metal and composite packaging"; e) containers for the collection of biodegradable kitchen waste and biodegradable packaging in brown with the word "biodegradable kitchen." The proposal to replace the containers IGLOO or other mesh will be issued if they are in the location of their place difficulties in the timely receipt of the waste (eg. Not possible directions of the vehicle with the boom, the risk of property damage bystanders while collecting and parked cars), or there will be no delineation of space meeting the requirements. 2) vir_listalng_zabudowa_jednorodzinna a) containers for mixed municipal waste (segregated) with "mixed"; b) bags for collecting paper and cardboard in blue with the words "paper and paperboard"; c) to collect the bags of clear glass and colored in green with the word "glass"; d) bags for collecting plastic, metals and multi-material packaging in yellow with the word "plastic, metal and composite packaging"; e) bags for the collection of biodegradable kitchen waste and biodegradable packaging in brown with the word "biodegradable kitchen." Sets the minimum capacity of bags: - blue - 120 dm, - green - 120 dm, - yellow - 120 dm - brown - 60 dm. 1.3 Delivery, on the occasion of receiving the waste, the property living in detached houses or terraced prepared by the Employer flyers, brochures, etc. Informing about occurred during the execution of the contract changes for waste management or services (eg .: the change in regulations, a change fee for waste management or methods of counting, the change in the scope of services provided, rescheduling of waste collection, prints declarations, etc.). 1.4 Organization and conduct for separate collection of municipal waste in Kostrzyna Oder. 10: 00-18: 00, for which he receives a proportionately greater number of points in the evaluation of bids, in accordance with the provisions of Chapter XIII siwz) to calculate the service PSZOK during its opening hours necessary to adopt supplied by the inhabitants of municipal waste should be provided for 1 person. Summary of waste received in PSZOK will be transmitted to the Employer and the invoice for the previous month.

Krościenko nad Dunajcem Pavilion main rafting marina at Sromowce Wyżne - Kąty. Repair works in the catering

Pieniński Park Narodowy | Published October 24, 2016  -  Deadline December 21, 2015
Winner
Zakład Produkcji, Usług wielobranżowych i Handlu Robert Szczepaniak, ul. Skotnicka 51, 31-460 Szczawnica, kraj/woj. małopolskie.
cpvs
45000000

The contract is for refurbishment of public facilities kuchenno-storage hall and consumption of replacement systems: electrical, water and sewage, heating, ventilation and window and door frames with trim premises by the construction project and the applicable standards in the building of the pavilion main rafting marina at Sromowce Wyżne - Katy ..

Rudnik nad Sanem: Construction outbuilding with shelter for forest nursery in Rudnik.

Nadleśnictwo Rudnik z siedzibą w Rudniku nad Sanem | Published July 14, 2016  -  Deadline July 14, 2016
Winner
Firma Budowlana TANI DOM Wacław Bełzak, ul. E. Kwiatkowskiego 19, 37-400 Nisko, kraj/woj. podkarpackie.
cpvs
45000000, 45262522, 45261100, 45261000, 45422000, 45421100, 45320000, 45300000

The contract is for the construction of an outbuilding at the school complex in Forest District Rudnik in Rudnik. Object of the contract includes the construction of an outbuilding with the construction of the internal electrical system. A detailed description of the contract defines the bill of quantities, design and technical documentation and technical specification of the workmanship and the receipt of work, which are attached hereto ..

Electricity

Gmina Józefów nad Wisłą | Published February 26, 2015
Winner
PGE Obrót S.A., Oddział z siedzibą w Lublinie
cpvs
09310000

The subject of this contract is to supply electricity in accordance with the provisions of the Act of 10.4.1997 Energy Law (Journal of Laws of 2012. Pos. 1059, as amended. D.) (The EP). The total estimated energy consumption (kWh) in the period from 1.1.2015 to 31.12.2016 is 8 398 092 kWh. This contract does not include electricity distribution services. The material scope of the contract specifies the scope of this proceeding detailed description of the contract (Annex 1 hereto) contains the location and description of the point of delivery of electricity and a draft contract (Annex 6 to the SETC) with est. No. 1 (list of facilities covered by the contract of the contracting authority ) and No. 2 (power of attorney), an integral part of the terms of reference.

Electricity, heating, solar and nuclear energy

Gmina Józefów nad Wisłą | Published October 10, 2017  -  Deadline November 15, 2017
cpvs
09300000, 09310000

The subject of the order is the supply of electricity for the needs of municipalities and their organizational units and other entities belonging to the purchasing group in the period 1.1.2018 - 31.12.2019.

1. The subject of the order is the supply of electricity in the period 1.1.2018 - 31.12.2019 in accordance with the provisions of the Act of 10 April 1997 Energy Law (ie OJ of 2017, item 220 as amended). d.) for the needs of the following municipalities and their organizational units:

1. Commune of Józefów nad Wisłą, ul. Opolska 33F, 24-340 Józefów nad Wisla

2. Chodel Municipality, ul. Partyzantów 24, 24-350 Chodel

3. Karczmiska Commune, ul. Centralna 17, 24-310 Innocents

4. Gmina Łaziska, Laziska 76, 24-335 Laziska

5. Wilków Commune, Wilków 62A, 24-313 Wilków

and other entities belonging to the purchasing group:

6. Opolskie Przedsiębiorstwo Komunalnych Sp. z oo, al. 600-Lecia 8, 24-300 Opole Lubelskie

2. The total estimated electricity consumption [MWh] in the period 1.1.2018 - 31.12.2019 is 7 359,513 MWh.

3. The scope of the subject matter of the order is detailed description of the subject of the order (enclosure 1 to SIWZ), containing the locations and description of the points of energy consumption and the model of the contract (Appendix No. 4 to SIWZ) together with the enclosure 1 (list of electricity consumption points covered by the contract ) and No. 2 (power of attorney), forming an integral part of this SIWZ.

4. This contract does not cover electricity distribution services.

Collection and recycling of municipal waste with real estate residing in the municipality of Nowe Miasto nad Warta.

 | Published December 5, 2014  -  Deadline December 15, 2014
cpvs
90500000

The contract is for the implementation of the service reception and handling of municipal waste from residential real estate in the commune of Nowe Miasto nad Warta. As part of the contract the Contractor is obliged to receive and development: a) unsorted municipal waste (mixed); b) selectively collected municipal waste (segregated), c) of biodegradable waste (including green waste), d) bulky waste, e) waste electrical and electronic equipment. A detailed description of the order and its implementation has been defined in Section III, the Terms of Reference.

Construction Jabłoniowa street in New Town.

 | Published March 16, 2015  -  Deadline March 31, 2015
cpvs
45100000, 45233000, 45233100

Construction of a street in New Town Jabłoniowa Pilica: demolition (sidewalks, concrete pavement) - 232.65 m2, ground works to transport ore - 1330 m3, profile-not and compaction of the ground, the foundation of natural aggregates thick. layers 10, 15 and 30 cm - 2 994 m2 surface and exits of cobblestones gr. 8 cm - 2007 m2, paving walkways gr. 6 cm - 806.80 m2, curbs - 670 m, edging - 407 m, lawns - 155 m2, in accordance with the project construction and engineering construction permit, offer cost estimate and the terms of reference. Additionally, you should move approx. 0.50 m 3 existing electrical boxes and three lampposts. These tasks are not included in the cost estimate ..

Refuse transport services

Gmina Dobrzyń nad Wisłą | Published December 27, 2014
Winner
<CONTACT_DATA_WITHOUT_RESPONSIBLE_NAME><ORGANISATION><OFFICIALNAME>Sita Płocka Gospodarka Komunalna</OFFICIALNAME></ORGANISATION><ADDRESS>ul. Przemysłowa 31</ADDRESS><TOWN>Płock</TOWN><POSTAL_CODE>09-400</POSTAL_CODE><COUNTRY VALUE="PL"/></CONTACT_DATA_WITHOUT_RESPONSIBLE_NAME>
cpvs
90512000, 90513000, 90514000

The contract involves the collection and recycling of municipal waste from the area of ​​the Municipality Dobrzyn on the Vistula collected by the owners of the property on which they live inhabitants. Scope of the contract includes: 2.1. waste collection directly from the property owners of all residential real estate located in the Municipality Dobrzyn on the Vistula River based on the dual system of segregation of waste by: a) wet waste, b) dry waste and mixed municipal waste, if not carried out by the owner of the selective collection, 2.2. waste management set out in paragraph 2.1. The exact list will be forwarded to the Contractor before signing. 2.3. collection and waste management problem provided by the property owners living for mobile Selective Points Rebounds Municipal Waste, ie .: a) furniture and other bulky waste, b) waste electrical and electronic equipment, c) waste batteries and accumulators, d) expired drugs and chemicals e) used tires, f) construction and demolition waste. Containers for drugs provides the Purchaser. As part of the contract the Contractor is obliged to equip residential property owners, located in the Municipality Dobrzyn on the Vistula River, in containers for collection of municipal waste for the duration of the contract. Estimated number and capacity of the containers is as follows: 1 190 pcs. Per dry waste, 475 pcs. Per dry waste, 25 pcs. Per dry waste. The Contractor is required to repair and replace if damaged containers through no fault of the user. The bags must be made of a film having a thickness adapted to the type of waste, which makes it impossible to tear the bag. The exact number and capacity of containers for waste collection will be transferred to the Contractor no later than the date of signing of the contract. The Contractor is responsible for ensuring that property owners with the necessary containers after signing an agreement with the Employer, but not later than 31.12.2014. For reasons beyond the Contractor may be considered, in particular, at least three irreplaceable property owner at the address indicated at intervals of at least 3 days, the hours 700-2 000. Characteristics containers for: a) property with a building single-family, multi-family building zagrodowym and to 7 units: - material - low-pressure high-density polyethylene, metal - capacity: 120l, 240l, 100l 1 - equipped with wheels, b) property multifamily building is more than 7 units: - material - low-pressure high-density polyethylene, metal, - capacity - 1 100l, - equipped with wheels. As part of the contract the Contractor will organize in the month of October 2015. and 2016. three mobile Selective Points Rebounds Municipal Waste - problem (furniture and other bulky waste, waste electrical and electronic equipment, waste batteries and accumulators, expired drugs and chemicals, used tires, construction and demolition waste) and equip each of the following containers and boxes : - 1 container outdoor furniture and other bulky waste with a capacity of at least 7 000 l, - 1 container waste electrical and electronic equipment with a capacity of at least 3 000 l, - 1 container for used batteries and accumulators with a capacity of at least 240l, - 1 container for overdue drugs with a minimum capacity of 120l, - 1 chemical container with a capacity of at least 240l - 1 outdoor container for used tires with a capacity of at least 7 000 l - 1 outdoor container for construction and demolition waste with a capacity of at least 7 000l. For more waste problem over capacity containers and delivery Artist additional bins and containers. 1800 Saturday) at the locations indicated by the Purchaser. Contractor is obliged to mobile surveillance points and maintaining cleanliness and order around w / the points after finishing the collection. The Contractor is required to submit to the Employer for each month of the contract evidence of these steps, ie. Waste transfer card. The Contractor is required to receive municipal waste: a) continuously, without disturbing the silence of night, b) the dates specified in the adopted schedule delivery, c) regardless of weather conditions, d) vehicles adapted for receiving mixed, wet and separately collected municipal waste and vehicles that enable the reception of the waste from the property with difficult dojeździe eg. a narrow road, the inability to maneuver large vehicles. As part of the contract the Contractor is obliged to receive municipal waste with the following frequencies: 7.1. once a month or wet waste, mixed waste from property owners built single-family and multi-family building seven dwellings, 7.2. once a week, or from wet waste

Collection and recycling of municipal waste from residential real estate in the commune Dobrzyn the Vistula River

Gmina Dobrzyń nad Wisłą | Published October 18, 2014  -  Deadline November 24, 2014
cpvs
90512000, 90513000, 90514000

Scope of the contract includes: 2.1. municipal waste collection directly with the property of all resident property owners located in the Municipality Dobrzyn on the Vistula River, based on a dual system of segregation of waste by: a) wet waste, b) dry waste and mixed waste, if not carried out by the owner of selective rebounds, 2.2. waste management set out in paragraph 2.1. The exact list will be forwarded to the Contractor prior to signing the contract. 2.3. collection and waste management problem provided by the property owners residing in a mobile Selective Points Rebounds Municipal Waste, ie .: a) furniture and other bulky waste, b) waste electrical and electronic equipment, c) waste batteries and accumulators, d) expired drugs and chemicals e) worn tires, f) construction and demolition waste. Containers for drugs provides Contracting Authority. As part of the contract the Contractor is obliged to equip the property owners residing, located in the Municipality Dobrzyn on the Vistula River, in containers for collection of municipal waste for the duration of the contract. Estimated number and capacity of containers is as follows: 1 190 pcs. Dry waste, 475 pcs. Dry waste, 25 pcs. Dry waste. The Contractor is required to repair and possible replacement of damaged containers through no fault of the user. For reasons beyond the Contractor may be considered, in particular, at least three irreplaceable property owner at the address indicated at intervals of at least 3-day, from 7:00 - 20:00. Characteristics of bins: a) property with a building single-family, multi-family building zagrodowym and up to 7 units: - material - high density polyethylene, high-density metal - capacity: 120 l, 240 l, 1 100 l, - equipped with wheels, b) property multi-family building is more than 7 units: - material - high density polyethylene, high-density metal - volume - 1 100 l, - equipped with wheels. As part of the contract the Contractor will organize in the month of October 2015 and 2016, three mobile Selective Points Rebounds Municipal Waste - problem (furniture and other bulky waste, waste electrical and electronic waste batteries and accumulators, expired drugs and chemicals, used tires, construction and demolition waste ) and equip each of them in the following containers and containers - one container outdoor furniture and other bulky waste with a capacity of at least 7 000 l, - 1 container for waste electrical and electronic equipment with a capacity of at least 3 000 l, - 1 container for used batteries and batteries with a minimum capacity of 240 l, - 1 container for expired drugs with a capacity of at least 120 l, - 1 container for chemicals with a minimum capacity of 240 l, - 1 outdoor container for used tires with a minimum capacity of 7 000 l, - 1 container outdoors for construction and demolition waste with a capacity of at least 7 000 l. For more waste problem than the capacity of containers and container contractor DELIVERIES additional containers and containers. 1800 Saturday) at the locations indicated by the Employer. The contractor is required to submit to the Employer for each month of the contract evidence of these steps, ie. Transfer card waste. The Contractor is required to receive of municipal waste: a) continuously, without disturbing the silence of night, b) the dates specified in the adopted schedule delivery, c) regardless of weather conditions, d) vehicles adapted to receive mixed, wet and separately collected municipal waste and vehicles which enable reception of the waste from the property of difficult dojeździe example. narrow road, the lack of maneuverability of large vehicles. As part of the contract the Contractor is obliged to receive municipal waste with the following frequencies: 7.1. monthly wet waste or mixed waste from property owners built single-family and multi-family building to seven dwellings, 7.2. weekly wet waste or mixed waste from property owners with residential building multifamily dwellings above seven. 7.3.Odpady dry are received: 7.3.1 once a month from property owners building is detached and multi-family dwellings to seven, 7.3.2 once a week from property owners with residential building multifamily dwellings above seven.

purchase of specialist equipment to the workshop nautical project Revitalization of the waterfront on the river Noteć in Nakło nad Notecią - to create a comprehensive database of tourist areas dependent on fisheries through the rooms of the building harbor facilities with the necessary equipment for the development of tourist infrastructure ..

 | Published December 5, 2014  -  Deadline December 15, 2014
cpvs
43800000, 42636100, 42924740, 42630000, 43136000, 42662100, 44315100, 44317000

The contract is for the purchase of specialist equipment to the workshop nautical Revitalization project on the river water harbor Notec in Nakło - to create a comprehensive database of tourism in the area dependent on fisheries by providing the rooms of the building dock equipment necessary for the development of tourism infrastructure. The contract involves the purchase, delivery and installation of equipment: 1) Locksmith table vise - 3 pcs. CPV 43800000-1 2) Hydraulic presses up to 50 kN - 1 pc. CPV 42636100-4 3) Manual auto parts washer - 1 pc. CPV 42924740-8 4) Sharpening Tool Bench - 2 pcs. CPV 42630000-1 5) Bench Drill - 2 pcs. CPV 43136000-5 6) electric welder coated electrode - 1 pc. CPV 42662100-5 7) electrical welder welding consumable electrode inert gas (MIG / MAG) - 1 pc. CPV 42662100-5 8) electric welder welding consumable tungsten electrode in inert gas (TIG) - 1 pc. CPV 42662100-5 9) kit for welding and -1 gas cutting set of CPV 44315100-2 10) Set fiber ropes and steel - 1 set - CPV 44317000-5 detailed order is specified in Annex 1 hereto. Specified in the order specification equipment to be brand new and should have a manual in Polish. All specifications listed in the order specification should be considered as minimal. Employer allows the supply of equipment with higher technical parameters ..

Nakło nad Notecią: Modernization Conference Hall in the facility Nakło Cultural Centre in Nakło nad Notecią Stage

Gmina Nakło nad Notecią | Published July 21, 2016  -  Deadline July 20, 2016
Winner
Zakład BUD-MAR Marek Żołecki, Olszewka 39, 89-100 Nakło nad Notecią, kraj/woj. kujawsko-pomorskie.
cpvs
45000000, 45100000, 45300000, 45400000, 45200000, 93000000

The contract is for a comprehensive renovation of the conference room NOK in Nakło nad Notecią. Basic data of the building (part of a conference room). Area after modernization: Conference Room - 229,50 m2 - lower part (Dance) - 92,67 m2 - bigger part of the scene - 136.83 m2 Stage - 49.00 m2 Pom. Technical (facilities) - 5.92 m2 TOTAL - 283.22 m2 Height of room for suspended ceiling - 408,00 cm height of the suspended ceiling on the stage - 370,00 cm assumed to support the internal communication system so far, the existing room Klubokawiarnia. Within the scope of the task is steel structure - lattice wall mount mobile by drawing or diagram producer walls. Existing technical room will be adapted to the room acoustics by making new walls and execution of glazing walls by inserting a Venetian mirror. On the part of the wall will be installed wall panels. On the walls in places where there is no wall panels and mirrors designed uniform finish of the walls in the form of high-quality decorative smooth plaster interior color shade of gray and white. AC5. Diversity of color components used on existing, coffered ceiling, painted some of the existing panels darker and lighter. Within the scope of the task is also manufacturing and installing the plenum conference room, installation of pipes, in order to perform later in ventilation and air - conditioning to the exit outside the building and execution of blind holes. The scope of work to be done. Demolition works - demolition of the layers under the floor - pipe replacement power installation at - radiators, - the possibility of forging a puncture holes - dismantling lining the walls and other according to the project, - dismantling of existing installations: electrical - dismantling door woodwork and walls, Painting and decorating: - implementation of the new layer under the floor along with the outpouring of the self-leveling layer, - performing the partition technical room acoustics, - making ornamental plaster, - construction of the walls lining (lining of the mirrors and wooden panels) - painting works - manufacture and assembly of the mounting wall mobilnej- set - with the delivery and installation of mobile walls - construction and installation of flooring laminate flooring AC 5 and KU 33. - fabrication and installation of pipes in the ceiling to install air conditioning and - ventilation. Before delivery and embedding elements of finishing (paint, panels, etc.). The contractor is obliged to agree on the color and design of the Employer and get his approval regarding the installation. The contractor is required before the commencement of works to pass the Employer BIOZ plan drawn up by the Construction Manager. Annexes to the object of the contract: - architectural design - building together with technical specifications for execution and acceptance of works, - bill of quantities,

Sewage, refuse, cleaning and environmental services

Gmina Nakło nad Notecią reprezentowana przez Burmistrza Miasta i Gminy Nakło nad Notecią | Published October 7, 2017  -  Deadline November 15, 2017
cpvs
90000000, 90500000, 90513100, 90533000

"Provision of services in the area of ​​the Nakło nad Notecka Town and Commune in the period from 1.1.2018 to 31.12.2018 in the scope of receiving municipal waste from property owners inhabiting the inhabitants".

All collectors collected from the Nakło nad Notec area of ​​the City and Commune will collectively collect the collected waste into the Selective Waste Collection Point

The detailed scope of the subject matter of the order can be found in Chapter IV Specification of Essential Terms of Contract.

Fragments: Frequency of receiving municipal waste from residential properties located in the Nakło nad Notecie municipality.

Collection of municipal waste will take place at the following frequency:

1) mixed municipal waste:

- for residential properties with a total of more than 10 units - minimum 1 x per week;

- for residential properties with a total of 10 units - minimum 1 x for 2 weeks;

2) Municipal waste selectively collected:

a) Plastics, metals, multi-material packages - 1 x per month,

b) Glass - 1 x per month,

c) Paper and cardboard - 1 x per month,

Note: Plastics, metals, multi-material packages, glass, paper and cardboard

Miniples, from which segregated waste will be received by the operator of the above points,

3) Used batteries and accumulators, used electrical and electronic equipment, furniture and other large-scale waste, worn tires - collected at the time of collection "

4) Construction and demolition waste - will be received in bags of the type BIG-BAG from the place indicated by the Ordering Party, according to the notification,

5) Outdated medicines - taken from containers placed in pharmacies for filing.

6) Green waste:

- 4 x per month in the period from 1 IV to 31 X from the area of ​​multi-family housing (over 10 premises)

- 2 x per month in March - November (other municipality, other real estate)

- in the remaining period no reception.

The contractor reserves in exceptional circumstances the possibility of changing the frequency of collection by the Contractor of municipal waste (resulting from the need to adjust the management of municipal waste to the need to maintain cleanliness and order in the town and commune Nakło nad Notecią).

The contractor is ready to change the frequency of municipal waste collection.

Property owners are obliged to allow the trader access to the containers and bags on the day of collection of the municipal waste from these properties (according to the specified schedule of receipt), the entrance to the property from the street, the possibility of entering the property or by displaying the container in front of the property, free access to them, except that:

1) Exposed containers may not be located outside the property for more than 12 hours before and after the collection date specified in the delivery schedule,

2) Exposed containers must not cause traffic congestion;

Collection of waste will take place in accordance with the schedule of collection of municipal waste.

It is the Contractor's responsibility to develop a timetable for collection of compliant waste

The next order accepted by the Orderer for the second half of 2018 should be delivered to property owners by 31 May 2018 at the latest, which will be valid from 1 July 2018.

When developing a schedule, the following principles should be taken into account:

a) the collection of individual mixed municipal waste, green and selectively collected should take place at different times,

b) If a statutory holiday occurs, the deadline for waste shipments should be scheduled one day in advance.

Detailed subject - Chapter IV of the SETC.

Refuse and waste related services

Gmina Nakło nad Notecią reprezentowana przez Burmistrza Miasta i Gminy Nakło nad Notecią | Published January 3, 2015
Winner
<CONTACT_DATA_WITHOUT_RESPONSIBLE_NAME><ORGANISATION><OFFICIALNAME>Zakład Usług Komunalnych Spółka z o.o.</OFFICIALNAME></ORGANISATION><ADDRESS>ul. Ciepła 4</ADDRESS><TOWN>Świecie</TOWN><POSTAL_CODE>86-100</POSTAL_CODE><COUNTRY VALUE="PL"/><PHONE>+48 523312778</PHONE><FAX>+48 523333075</FAX></CONTACT_DATA_WITHOUT_RESPONSIBLE_NAME>
cpvs
90500000, 90511000, 90512000, 90513100

The contract is for the provision of services within the City and Municipality Nakło over Notecią in the period from 1.1.2015 to 31.12.2015 in the collection of municipal waste from the owners of the property on which they live inhabitants. Characteristics of Communities: 1) urban-rural municipality. 2) The surface area of ​​the Commune is 186.97 km2 (of which covers an area of ​​10.62 km2 city Nakło over Notecią). 27 500 inhabitants (as of 06/30/2014). 4) The Municipality of the city creates Nakło over Notecią counting about 16 225 inhabitants and a rural area (29 villages), numbering about 11 275 inhabitants. 5) The number of inhabitants and the various villages of the commune, are presented in Appendix 1 to the contract. 6) for the location of the village commune is shown on the map in Annex 2 to the contract. 7) Part of the village commune Nakło over Notecią characterized by buildings of a compact with the occurrence of multifamily housing. Vir_listalng_zabudowa_wielorodzinna occurs mainly in the villages of Paterek, Potulice, Ślesin, Minikowo, Lubaszcz, Olszewka, Kazin. Compact single-family housing in addition Nakła occurs mainly in the villages of Paterek, Potulice, Ślesin, Trzeciewnica, performance. Plans for the main and largest town of the municipality are presented in Appendix 3 to the contract. Within the city there are areas of multifamily housing (Annex 1 to the subject of the contract) Multifamily Buildings is also located in the area of ​​The enclosure in downtown and the old town are mostly old houses and buildings wielolokalowe forming compact settlement with the functions of central services and commerce. Other housing developments are detached houses. 2618th 10) Summary of address points, the number of those who live, the types of waste collected in the municipality of Nakło over Notecią - Annex 1 to the contract. Location and type of existing roads within the municipality Nakło over Notecią presented in Appendix 4 to the contract. 12) In the area of ​​the City Nakło over Notecią largest vehicle traffic occurs over a map of the city Nakło Notecia indicating the way streets are presented in Appendix 5 to the contract. Types of municipal waste collected. Municipal waste collection from property owners, which are formed municipal waste will be divided into: a) mixed municipal waste - collected in containers (transferred to the transfer station in Rozwarzynie), b) Green waste - collected in sacks (transferred to Station reloading in Rozwarzynie), c) Municipal waste collected separately (transferred to Point Municipal Waste Selective Rebounds in Rozwarzynie): plastics, metals, composite packaging - including (in detached houses collected in bags, in the building multifamily collected in containers or bags); Glass - (in detached houses collected in bags in the construction of multi-family collected in containers or bags); paper and cardboard - (in detached houses collected in bags, in the building multifamily collected in containers or bags). d) Dispose of used batteries and accumulators, waste electrical and electronic equipment, furniture and other bulky waste, used tires - received at the time of collection of "traveling" before the real estate; (Transferred to Point Municipal Waste Selective Fundraising report shall contain the following information: a. The name and telephone number of the applicant; b. The name of the property owner, c. The address of the property, d. The type and quantity of waste being put. E) Construction waste and demolition (will be received in big bags in the place indicated by the remontującego and forwarded to Point Municipal Waste Selective Rebounds are the waste resulting from repairs carried out by the property owners living on their own: waste concrete and concrete rubble from demolition and renovation of brick rubble waste of others ceramic materials and equipment elements mixed waste from concrete, bricks, tiles and ceramics other than those mentioned in 17 01 06 The application needs a bag big bags intended for construction and demolition waste shall include the following information: a. name and telephone number of the applicant; b. the name of the property owner, c. The address of the property, d. the type and quantity of waste being put. 3 working days from the date of notification or the full completion of the overhaul, cited. waste bag and transport to the Point Municipal Waste Selective Rebounds in Rozwarzynie. Contractor within 7 days of the Employer shall be obliged to transfer the property to the rightful claimant resides bag big bags intended for the construction and demolition waste. f) Overdue
  • 1