Gorzow Wielkopolski: Design and implementation of replacement electrical switchboards in the building of the Lubuskie Regional Office in Gorzow Wielkopolski.

Lubuski Urząd Wojewódzki w Gorzowie Wlkp. | Published July 14, 2016  -  Deadline July 13, 2016
Winner
Zakład Instalacyjno-Budowlany KANBUD Wiesław Kaniewski, ul. Walczaka 23 A, 66-400 Gorzów Wlkp., kraj/woj. lubuskie.
cpvs
45310000, 71220000

The contract is the modernization of the electrical installation - design and execution of the exchange of electrical switchboards in the building of the Lubuskie Regional Office in Gorzow Wielkopolski. On the basis of the functional - utility.

Gorzow Wielkopolski: Replacement of electrical installation communal dwelling in the region of ADM - 5 in Gorzow Wielkopolski.

Zakład Gospodarki Mieszkaniowej | Published August 18, 2016  -  Deadline August 16, 2016
Winner
PUH ELEKTROBUD Józef Kowalski, ul. Kutrzeby 10/50, 66-400 Gorzów Wlkp., kraj/woj. lubuskie.
cpvs
45310000, 45311000

The contract is the exchange of electrical installations in the municipal residential premises in accordance with the scope of work specified in the technical specification of the workmanship and the receipt of work and przedmiarze attached to siwz. This contract is subject to the electrical system in the premises No. 6 at Al. May 3 Constitution 103.

Replacing the electrical installation at the premises in the municipal area of ​​ADM - 2 in Gorzow Wielkopolski

 | Published June 10, 2016  -  Deadline June 27, 2016
cpvs
45310000, 45311000

The contract is for replacement of the electrical system in municipal residential premises in accordance with the scope of work specified in the technical specification of the workmanship and the receipt of work and przedmiarach attached to siwz. This contract are covered installations in the following premises: 1. Waryńskiego 27/8 40/2 Silesia 2. 3. 4. Silesian Industrial 23/5 9/8 5. Dike 14/8 6. Green 53/2 is recommended to familiarize with the topography land and making the vision of the local operations as an auxiliary in the preparation of the offer. For the order to be used products approved for marketing and use in the construction industry (Article 10 of the Act of 07 July 1994 - Construction Law Dz. U. of 2013. Item. 1409, as amended.). As such products are considered to meet the requirements of Art. 5 of the Act of 16 April 2004 on building products (Dz. U. of 2014., Pos. 883).

Replacing the electrical installation at the premises in the municipal area of ​​ADM - 4 in Gorzow Wielkopolski

 | Published April 20, 2016  -  Deadline May 6, 2016
cpvs
45310000, 45310000

The contract is for a comprehensive exchange of electrical installations with the accompanying work on 10 municipal residential premises in accordance with the scope of work specified in the technical specification of the workmanship and the receipt of work and przedmiarach attached to siwz. This contract are covered installations in the following premises: 1. garden 2. Warsaw 2/9 83/3 28/3 4. 3. Brave Krzywoustego 1 / 7A 5. Brave Brave 27/5 8/4 6. 7. Drzymały 40 / 9 8. 9. Jagiello Dabrowski 7/5 13/4 6/6 Theatre 10. It is recommended to familiarize with the topography of the area and make the vision of the local operations as an auxiliary in the preparation of the offer. For the order to be used products approved for marketing and use in the construction industry (Article 10 of the Act of 07 July 1994 - Construction Law Dz. U. of 2013. Item. 1409, as amended.). As such products are considered to meet the requirements of Art. 5 of the Act of 16 April 2004 on building products (Dz. U. of 2014., Pos. 883) Warranty Period: 36 months.

Replacing the electrical installation at the premises of municipal administered by ZGM in Gorzow Wielkopolski. In the area of ​​ADM - 1

 | Published August 25, 2015  -  Deadline September 10, 2015
cpvs
45310000

The contract involves the replacement of the electrical installation in 4 municipal dwellings and 1 utility, according to the scope of work specified in the technical specification of execution and acceptance of works and przedmiarach attached hereto. This contract are covered installations in the following premises: 1. Kos. Gdyńskich 73/18 2. Kos. Gdyńskich 57/7 3. Mieszko I-go 49/8 4. Lives of the I 26/3 5. The Slovak 4 Legend: Position 1-4 - Sale Item 5 - commercial space is recommended to acquainting with the topography of the area and make a site visit as auxiliary activities in the preparation of the offer. To perform the contract should be used with products released on the market and use in construction (Article 10 of the Law of 07 July 1994 - Construction Law Dz. U. of 2013. Pos. 1409 as amended.). As such products are considered to meet the requirements of Art. 5 of the Act of 16 April 2004. building products (Dz. U. of 2014., pos. 883) Warranty Period: 36 months.

Electricity

Miasto Gorzów Wlkp. | Published December 7, 2016
Winner
Enea S.A.
cpvs
09310000

1. The contract is for the supply of electricity with a total estimated volume 41.294,15MWh in the period from 01.01.2017 to 31.12.2017, of:

1) The premises and facilities - 28,096.15 MWh;

2) For the purposes of road lighting - 13,198.00 MWh.

2. The contract is the supply of electricity with specific, in accordance with applicable regulations, quality standards - Act of 10.4.1997 Energy Law and regulations, in particular Regulation of the Minister of Economy of 4.5.2007 on the detailed conditions for the operation of the power system.

1. Number of measurement systems clearing the consumed electric energy 1 770 pcs.

2. The estimated electricity consumption during the contract period: 28,096.15 MWh, of which:

Zone I 14,970.11 MWh

Zone II 10,984.74 MWh

Zone III 2,141.30 MWh

These data are indicative. The Contractor shall take into account the fluctuations of electricity consumption (+/-) 10%.

1. Number of measurement systems clearing the consumed electric energy 1 106 pcs.

2. The estimated electricity consumption in the period of the contract 13,198.00 MWh, of which:

Zone I 12,329.38 MWh

Zone II 868.62 MWh

Zone III 0,00 MWh.

Electricity

Komenda Wojewódzka Policji w Gorzowie Wlkp. | Published October 2, 2015  -  Deadline October 23, 2015
cpvs
09310000

Elektryczność

Electricity

Komenda Wojewódzka Policji w Gorzowie Wlkp. | Published September 12, 2015  -  Deadline October 2, 2015
cpvs
09310000

Elektryczność

Electricity

Komenda Wojewódzka Policji w Gorzowie Wlkp. | Published August 12, 2015  -  Deadline September 10, 2015
cpvs
09310000

Elektryczność

Electricity

Miasto Gorzów Wlkp. | Published November 13, 2014
cpvs
09310000

Elektryczność

Electricity

Komenda Wojewódzka Policji w Gorzowie Wielkopolskim | Published November 28, 2015
Winner
PGE Obrót SA z siedzibą w Rzeszowie, ul. 8-go Marca 6, 35-959 Rzeszów, PGE Obrót S.A. Oddział w Skarżysku-Kamiennej
cpvs
09310000

1. Object of the contract includes: Purchase of electricity to the facilities Police garrison Lubuskie. 2. CPV code 09.31.00.00-5 - Electricity 3. Estimated electricity consumption for the period of 24 months is 8 223 288 kWh, according to the following tariff groups: a) C21 - 5 591 256 kWh; b) C22a at the top - 118 264 kWh; c) C22a off-peak - 329 740 kWh; d) C11 - 1 937 478 kWh; e) G11 - 9 186 kWh; f) C12a at the top - 63 105 kWh; g) C12a off-peak - 174 259 kW. 4. A detailed list of the type of the order has been specified in the tender form (est. No. 1 to SETC). 5. The amount of energy set out in the tender documents and the tender form (est. No. 1 to SETC) are estimates. 6. Employer's service quality standards are set out in the applicable implementing regulations issued under the Act of 10.4.1997 - Energy Law (Journal of Laws of 2012. Pos. 1059). 7. This Agreement shall enter into force within each sampling point with effect from 1.1.2016, but not earlier than on an effective solution existing electricity sales agreement with the previous vendor, as well as the positive changes in the present procedure seller and adoption of the agreement to be implemented by the OSD. 8. The Agreement is concluded to 31.12.2017.

Electricity

Komenda Wojewódzka Policji w Gorzowie Wlkp. | Published July 31, 2015  -  Deadline September 9, 2015
cpvs
09310000

Object of the contract includes: Purchases of electricity to the facilities Police garrison Lubuskie. CPV code 09.31.00.00-5 - Estimated electricity consumption of electricity in the 24 months is 8 381 858 kWh tariff by the following groups: a) C21 - 5 591 256 kWh b) C22a at the top - 118 264 kWh c) C22a off-peak - 329 740 kWh d) C11 - 2 096 052 kWh e) G11 - 9 186 kWh f) C12a at the top - 63 105 kWh g) C12a off-peak times - 174 259 kWh a detailed list of the type of the order has been specified in the tender form (est. No. 1 to SETC). The amount of energy set out in section 3 of the Terms of Reference and the tender form (est. No. 1 to SETC) are estimates. 1059) 1200) or at any later issued a legal act concerning. Qualitative service standards. 5 of the Public Procurement Act: a) Zmówiona amount of energy in the basic range is 8 381 862 kWh. In this case, the Contractor is not entitled to claim against the unused amount of energy in the period of the contract. In the case of an increase in demand for electricity Employer in specified in the agreement at the taps performance of the contract may be increased by up to 20% of the planned amount of power consumption in each of the points specified in the agreement, always in total not more than 20% of the ordered amount of energy in the primary the range referred to in point a) together with new points of collection. The Contracting Authority will send a written notice of the change introduced to the Contractor and determine the commencement date of the agreement in a modified scope. The Contractor agrees to reduce to a minimum interruptions in electricity supply caused by failure and adopt clock reports and complaints from the Employer or his representative. Sales of electricity will be settled by the unit price of electricity set out in Annex 1 to the agreement drawn up based on contractor bids. The fee for the consumed electric energy billing periods will be calculated individually for each sampling point the product of the amount of electricity sold on the basis of indications of measuring devices installed in metering and billing and unit prices of electricity. Readings clearing and settlement costs of electricity sold will be held according to the reference period used by the Distribution System Operator established in the tariff. The contractor must provide and realize the object of the contract in accordance with the requirements of the Terms of Reference and its annexes. All attachments hereto constitute an integral part. Detailed requirements on how to perform the contract, warranty complaints and the terms of payment contained in Annex No. 5 to SETC "Project Agreement". The deadline will be calculated according to the principles set out in the Civil Code.

Teaching equipment

Powiat Ostrowski, Starostwo Powiatowe w Ostrowie Wielkopolskim | Published October 25, 2017  -  Deadline December 11, 2017
cpvs
39162100

Full name of procedure: supply of equipment for investment: "Reconstruction of existing buildings and extension of the buildings of the School of Transport and Electrical Schools of the Center for Continuing Education to create a Practical Training Center with equipment"

The subject of the order is the delivery of equipment to the workshop:

1) computer design and programming laboratory

2) renewable energy laboratory and mechatronics

3) machining workshop

4) construction and installation workshop

5) refrigeration and mechatronics laboratory

6) electrical and electrical engineering laboratory

7) motorcycle workshop

8) training room for occupational safety and health

9) welding workshop

10) manual workroom

The detailed scope of the object of the contract is specified in the Annexes to the SIWZ.

The subject of the order is the delivery of equipment to the workshop:

1) computer design and programming laboratory

2) renewable energy laboratory and mechatronics

3) machining workshop

4) construction and installation workshop

5) refrigeration and mechatronics laboratory

6) electrical and electrical engineering laboratory

7) motorcycle workshop

8) training room for occupational safety and health

9) welding workshop

10) manual workroom

The detailed scope of the object of the contract is specified in the Annexes to the SIWZ.

Expansion of Primary School No. 4 in Grodzisk Wielkopolski - II stage.

 | Published January 8, 2015  -  Deadline January 23, 2015
cpvs
45262800

The contract is a continuation of the expansion of the Primary School No. 4 in Grodzisk Street. Central No. 56. Hereby procedure is covered by the second stage of development relies on performing general construction works, installation works in the field of electrical, plumbing, which, gas, ventilation and boiler room technology. The usable area is 290.2 m2 expansion and volume 1232.1 m3 ..

Renovation of the common room rural Forge Zelichowska.

 | Published October 14, 2014  -  Deadline October 28, 2014
cpvs
45400000

Demolition works, change the location of doors and windows, construction of new partitions, walls przemurowanie replacement parts business with construction and roofing, construction ventilation, floors with thermal insulation, ceiling insulation performance along with the renovation of the electrical system, what and wod.- can. the matters referred to in przedmiarach works ..

Electricity, heating, solar and nuclear energy

Miasto Gorzów Wlkp. | Published December 13, 2016
Winner
Enea S.A.
cpvs
09300000, 09310000

1. 1. Number of measurement systems clearing the consumed electric energy 1 106 pcs.

2. The estimated electricity consumption in the period of the contract 13,198.00 MWh, of which:

Zone I 12,329.38 MWh

Zone II 868.62 MWh

Zone III 0,00 MWh.

1. Number of measurement systems clearing the consumed electric energy 1 106 pcs.

2. The estimated electricity consumption in the period of the contract 13,198.00 MWh, of which:

Zone I 12,329.38 MWh

Zone II 868.62 MWh

Zone III 0,00 MWh.

Switching to the agreement are subject to 3 points power consumption.

Electricity

Miasto Gorzów Wielkopolski | Published September 17, 2016  -  Deadline October 26, 2016
cpvs
09310000

1. The contract is for the supply of electricity with a total estimated volume of 41,294.15 MWh in the period from 01.01.2017 to 31.12.2017, of:

1) The premises and facilities - 28,096.15 MWh;

2) For the purposes of road lighting - 13,198.00 MWh.

These data are indicative. The Contractor shall take into account the fluctuations of electricity consumption at the level of (+/-) 10%.

2. The contract is the supply of electricity with specific, in accordance with applicable regulations, quality standards - Act of 10.4.1997 Energy Law and regulations, in particular Regulation of the Minister of Economy of 4.5.2007 on the detailed conditions for the operation of the power system.

3. The order will be given in two parts:

1) Part I of the contract - Supply of electricity to the premises and,

2) Part II of the contract - Supply of electricity for road lighting,

4. The total number of measurement systems clearing the consumed electric energy 2 876 pcs.

5. Distribution services will be provided on the basis of separate agreements between authorities (consumers / taxpayers) a distribution system operator (DSO).

Petroleum products, fuel, electricity and other sources of energy

Wielospecjalistyczny Szpital Wojewódzki w Gorzowie Wielkopolskim Spółka z ograniczoną odpowiedzialnością | Published November 4, 2015
Winner
ENEA S.A.
cpvs
09000000, 09300000

1) The contract is for the purchase of electricity under the provisions of the Act of 10.4.1997 Energy Law (Journal of Laws of 2012. No. 0, pos. 1059 as amended. D.) For the needs of the Multi-Regional Hospital in Gorzow Wielkopolski company limited liability company. 2) Scope of the order covered by this investigation determines the description of the contract contained in Appendix 2 hereto (Annex 1 to the offer) and in the model contract (Appendix No. 7 to the SETC), which are an integral part of this Terms of Reference (ToR) . 3) The total estimated energy consumption forecasted for the period from 01.01.2016 to 31.12.2018 for all collection points is 13 512 MWh.

Electricity

Miasto Gorzów Wlkp. | Published October 17, 2015
Winner
RWE Polska Spółka Akcyjna Klienci Biznesowi
cpvs
09310000

1. The contract is for the supply of electricity with a total estimated volume of 37,112.58 MWh for the period from 1.1.2016r. to 31.12.2016., of which: 1) the premises and facilities - 24,790.81 MWh; 2) for road lighting - 12,321.77 MWh. These data are indicative. The Contractor shall take into account the fluctuation of electricity consumption of +/- 5%. 2. Employer allows submission of partial bids. The contract will be in two parts: Part I of the contract - supply of electricity to the premises and facilities, Part II orders - Supply of electricity for street lighting, 3. The total amount of the measuring systems clearing electricity consumed 2 527 units. 4. Distribution services will be provided under separate contracts entered into between the Purchaser (consumers / taxpayers) and the distribution system operator (DSO). 5.Wykonawca, based on the granted power of attorney shall be obliged to report on their own behalf and the Purchaser (consumers / taxpayers) contracts for the sale of electricity to the competent DSO in accordance with applicable regulations. 6. In the absence of important distribution agreements for the day of the notification referred to in paragraph 5, the Contractor (based on granted power of attorney) will be obliged to deposit on behalf of the Employer (consumers / taxpayers) applications to conclude distribution agreements and the deposit required by the OSD statement or conclusion of a contract.

Petroleum products, fuel, electricity and other sources of energy

Wielospecjalistyczny Szpital Wojewódzki w Gorzowie Wlkp. Spółka z ograniczoną odpowiedzialnością | Published September 2, 2015  -  Deadline October 12, 2015
cpvs
09000000, 09300000

1) The contract is for the purchase of electricity under the provisions of the Act of 10 April 1997. Energy Law (Journal of Laws of 2012. No. 0, pos. 1059 as amended. D.) For the needs of the Multi-Regional Hospital in Gorzow Wielkopolski . Limited liability company. 2) Scope of the order covered by this investigation determines the description of the contract contained in Appendix 2 hereto (Annex 1 to the offer) and in the model contract (Appendix No. 7 to the SETC), which are an integral part of the Terms of Reference (ToR). 3) The total estimated energy consumption forecasted for the period from 1.1.2016-31.12.2018 r. For all collection points is 13 512 MWh.