Public tenders for electrical in Lichtenvoorde Netherlands

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

Construction work

Gemeente Oost Gelre | Published October 23, 2015
Winner
Alferink BV
cpvs
45000000

The project involves outline: - It is an institution for secondary education, located in a residential area on the Dean Hooijmansingel one Groenlo; - It concerns the revitalization of the old school (component 1959) associated with the execution of long-term maintenance and sustainability measures based on EPA tailored advice, which is also connected to the educational vision of KSGM. During the revitalization will also be cleaned up the remaining asbestos in block 1959. In addition, there is relocation of Library East Achterhoek location Groenlo by integrating the library in the school of KSGM. In today's current form the building has a total area of ​​about 10 400 m² GLA. This is the new situation brought back to approximately 10 250 sqm GLA. A portion of the building will be demolished, a part of the building will be expanded and the rest of the building is a functional adaptation for the benefit of the educational vision. The revitalization then the internal and external "reconstruction" of the building, including new facilities and infrastructure works; - In connection with the scope of the work and a "going concern situation" of the educational provision regarding education, there will (have to) be a phased implementation; - The activities are divided into two lots: * Lot 1: civil engineering work. * Lot 2: technical installation work (electrical and mechanical).

Construction work

Gemeente Oost Gelre | Published March 12, 2015  -  Deadline April 9, 2015
cpvs
45300000

The project involves outline: - it is an institution for secondary education, located in a residential area on the Blanket Hooijmansingel 1 Groenlo; - It relates to the revitalization of the old school (building section 1959) associated with the execution of long-term maintenance and preservation measures based on EPA tailored advice, which is also connected to the educational vision of KSGM. During the revitalization will also be cleaned up the remaining asbestos in block 1959. In addition, there is rehousing Library East Achterhoek location Groenlo by integrating the library in the school of KSGM. At the present, existing shape of the building has a total area of ​​about 10 400 m² GLA. This is the new situation brought back to approximately 10 250 m² GLA. A portion of the building will be demolished, a part of the building will be expanded and the rest of the building is a functional adaptation for the benefit of the educational vision. The revitalization then the internal and external "reconstruction" of the building, including new facilities and infrastructure works; - In connection with the scope of work and a "going concern situation" of the educational provision for education, there will (have to) be a phased implementation; - The activities are divided into two lots: • Lot 1: architectural work; • Lot 2: Installation technical work (electrical and mechanical).

Revitalization KSG Marianum Groenlo - Municipality Oost Gelre

Gemeente Oost Gelre | Published March 9, 2015  -  Deadline April 9, 2015
cpvs
45000000, 45000000

The project involves outline: - It is an institution for secondary education, located in a residential area on the Blanket Hooijmansingel 1 Groenlo. - It concerns the revitalization of the old school (building section 1959) associated with the execution of long-term maintenance and preservation measures based on EPA tailored advice, which is also connected to the educational vision of KSGM. During the revitalization will also be cleaned up the remaining asbestos in block 1959. In addition, there is rehousing Library East Achterhoek location Groenlo by integrating the library in the school of KSGM. At the present, existing shape of the building has a total area of ​​approximately 10,400 m2 GFA. This is the new situation brought back to approximately 10,250 m2 GFA. A portion of the building will be demolished, a part of the building will be expanded and the rest of the building is a functional adaptation for the benefit of the educational vision. The revitalization then the internal and external "reconstruction" of the building, including new facilities and infrastructure works. - In connection with the scope of work and a 'going concern' situation of the educational provision for education, there will (have to) be a phased implementation. - The work is divided into two lots: * Lot 1: construction work * Lot 2: Installation technical work (electrical and mechanical)
  • 1