Call +44 800 9755 164

Public tenders for electrical in Italy

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

Provision of electrical material

Food and Agriculture Organization of the United Nations | Published February 16, 2017
cpvs

The Food and Agriculture Organization of the United Nations (FAO) invites you to submit an offer for the "Provision of electrical material". If you are interested in submitting an offer, please make sure to have, at least, a Basic Registration with UNGM (ww.ungm.org).

Instructions on how to access FAO tender documents through UNGM are attached to the present Notice under the “DOCUMENTS” tab; please follow these instructions when submitting your bid.

OFFERS WILL BE ACCEPTED EITHER IF SUBMITTED THROUGH THE UNGM PORTAL OR VIA EMAIL TO THE FOLLOWING EMAIL ADDRESS ONLY FAO-HQ-TENDERS@FAO.ORG.


Many thanks and best regards,
FAO PROCUREMENT SERVICE

Supply and installation of high-voltage electrical components at the 132-kV electrical substation.

European Commission, Joint Research Centre | Published April 25, 2013
Winner
Termigas Bergamo S.p.A. via Buratti 21 24124 Bergamo BG ITALY
cpvs
45315400

Supply and installation of high-voltage electrical components at the 132-kV electrical substation. The services in the contract will be carried out on high-voltage electrical installations, electrical monitoring and protection installations (run on auxiliary power) and compressed air installations. The contract includes the executive design of the installations and the removal and disposal of the replaced obsolete components.

Provision of Electrical Materials, Professional Equipment and related Accessories for UNGSC, Bri ...

United Nations Secretariat | Published October 3, 2014  -  Deadline October 24, 2014
cpvs

The United Nations Global Service Centre (UNGSC) has a requirement for the establishment of a contract for the Provision of Electrical Materials, Professional Equipment and related Accessories on “as and when required basis” to UNGSC in Brindisi - Italy. The Contract shall be established for an initial period of 3 years with the option to be renewed for 2 additional periods of one-year each, for a maximum contract period of 5 years. The required items includes various types of electrical products and supplies, domotic and automated systems, electrical safety and security products, insulated tools and equipment, as per indicative list shown below: - Electrical cables - Relays - Plugs, socket-outlets, multiple adaptors - Heavy duty wiring ties, standard cable ties - Cable ducting - Electrical supplies, such as insulation tape, voltage joints & terminations, cold shrinks tubes & end caps, resins, lugs and connectors - Enclosures, domestic range plates, domestic range installation - Modular devices for circuit protection - Building automation (lighting and movement control devices) - Automated systems for sliding gates, industrial doors, barriers - Electrical warning signs, cross cables, safety equipment and accessories for insulated cables - Professional electric test tools, such as quality analyzers, multifunction meters for safety test, thermal imagers - Special insulated tools and safety insulated wears and equipment, such as cable strippers, gloves, detectors of voltage presence/absence; All electrical materials and professional equipment must be ISO 9001 certified and must be in compliance with International Standards, such as CESI, IMQ,Ce, etc. The required delivery time is maximum 3 calendar weeks from the date of Receipt of Purchase Order. The full technical requirements and details will be provided with a formal solicitation document to be issued at a later stage soon after the closing date for this EOI. In order for the Expression of Interest to be considered, the company must be registered with United Nations Global Marketplace (UNGM) by visiting the website: www.ungm.org. In order to be awarded a Contract/Purchase Order, the Vendor must be registered with the UN Secretariat through the United Nations Global Marketplace (UNGM) for the required Level of Registration, which is “Level 2”, by the time of finalization of bid evaluation before the award.

Provision of equipment (chassis components, network installation equipment, electrical wire mana ...

United Nations Secretariat | Published November 17, 2016
cpvs

The United Nations Global Service Centre (UNGSC) has a requirement for the provision of equipment (chassis components, network installation equipment, electrical wire management accessories) for the UNGSC Data Center, Brindisi – Italy.

Provision of Sandwich Pavement, Carpentry and Electrical Materials for UNGSC, Brindisi, Italy

United Nations Secretariat | Published April 17, 2017
cpvs

The United Nations Global Service Centre (UNGSC) in Brindisi, Italy has a requirement for the provision of sandwich pavement, carpentry and electrical materials including, but not limited to the following: - Polyurethane/metal sandwich panels and finishing profiles - Raised floor (kit of 40 tiles) - Steel POP Rivets - Wafer head self-drilling screws - Chip board screws - Sealant glue - Aluminum support frame and profiled aluminum bars - Cap for mechanical 45x45 strut profile - Cable duct and cable duct end cap - Aluminum Diamond plates - Strut Profile Connectors - Electrical materials: piping, cables, RCBO switch, sockets Maximum delivery period: 30 days upon Purchase Order issuance.

Upgrade of Electrical System in 3 Shelters at UNGSC/UNLB Brindisi, Italy

United Nations Secretariat | Published January 8, 2016  -  Deadline January 29, 2016
cpvs

This is a turnkey project for the electrical works to be carried out in three storage buildings in UNGSC/UNLB, Brindisi Italy. The three storage buildings are approximately 830 square meters each. The electrical system of the buildings is old and has undergone very little maintenance since the late 80s, falling short of current safety standards. The Contractor shall complete the works in 3 phases and the activity breakdown of each phase is described below: 1 Phase One The Contractor shall prepare and deliver the following: ­ Operative Safety Plan (P.O.S.) with all required documentation as per Italian Safety laws. ­ Executive Gantt Chart in reference to UNGSC/UNLB Works Supervisor’s request, and based on the actual work status; ­ A complete list of all of the Contractor’s personnel and the registered vehicles. 2 Phase Two The construction phase shall comprise the following main activities: ­ Supervision of works; ­ Site preparation and mobilization; ­ Civil works related to chasing and patching/plastering affected walls; ­ Provision and installation of electrical piping/cabling and connections; ­ Provision and installation of lighting; ­ Provision and installation of fire detection; ­ Provision and installation of fire alarms; ­ Site cleaning, transport and disposal of undesired materials and demobilization. 3 Phase Three ­ Testing and certification; ­ Preparation of as-built drawings signed by a certified engineer; ­ Preparation of Maintenance Plan and list of installed materials; ­ Handover of site to UNGSC/UNLB.

Inspection, Maintenance and Repair to Grounding Systems, Lightning Systems and Electrical Transf ...

United Nations Secretariat | Published June 24, 2015  -  Deadline July 31, 2015
cpvs

The United Nations Global Service Center/ United Nations Logistics Base requires the services of a Contractor for a Long Term Contract (3 + 1 + 1 years) for the Inspection, Maintenance and Repair to Grounding Systems, Lightning Systems and Electrical Transformer Cabins at UNGSC/UNLB Brindisi, Italy, as follows: a. Grounding Systems installed in all buildings, warehouse and workshops ( 57 Buildings). - The work comprises three parts: Maintenance Service, Inspection service, Extra-services to be requested on a “as and when required basis”. b. Lightning system is installed in building 152, Satellite farm Building A and B (3 Buildings). - The work comprises three parts: Maintenance Service, Inspection service, Extra-services to be requested on a “as and when required basis”. The Grounding and lightning systems consist in (as defined in the Italian Standard Code): - Grounding rod; - Clamps; - Connectors; - Conductors; - Terminal components; - Bridging components; - Expansion pieces; - Measuring points. c. Electrical Transformer Cabins ( 9 Cabins). - The work comprises four parts: Maintenance Service , Inspection service, Test and Certification of the system, Extra-services to be requested on an “as and when” required basis. The systems consist in: - Transformers - Electrical Panels (BT/MT) - All electrical equipment located in the Transformer Room - Grounding System The full technical requirements and details will be provided with a formal solicitation document to be issued at a later stage soon after the closing date of this EOI. In order for the Expression of Interest to be considered, the company must be registered with the United Nations Global Marketplace (UNGM) by visiting the website: www.ungm.org. In order to be awarded a Contract/Purchase Order, the Vendor must be registered with the UN Secretariat through the United Nations Global Marketplace (UNGM) for the required Level of Registration, which is “Level 1”, by the time of finalization of bid evaluation before the award.

Electrical installation work of heating and other electrical building-equipment

Provincia di Rimini | Published March 13, 2013
cpvs
45315000

Electrical installation work of heating and other electrical building-equipment

Electrical apparatus for switching or protecting electrical circuits

Snam Rete Gas S.p.A. | Published December 20, 2012
cpvs
31210000

Electrical apparatus for switching or protecting electrical circuits

electrical accessories

Azienda ospedaliero universitaria Udine – dipartimento servizi condivisi | Published June 20, 2012  -  Deadline July 16, 2012
cpvs
31681000

electrical accessories

Upgrade Of The Electrical System In Shelters 259, 260, 262 & 263 At GSC/UNLB Brindisi, Italy

United Nations Secretariat | Published February 2, 2017
cpvs

The Global Service Center/ United Nations Logistics Base (GSC/UNLB) in Brindisi, Italy intends to issue a tender for the Upgrade of the Electrical System in Shelters 259, 260, 262 and 263 at its premises in Brindisi, Italy. This is a turnkey project for the electrical works to be carried out in 4 storage buildings in UNGSC/UNLB, Brindisi Italy. The four (4) storage buildings are approximately 830 square meters each, and the electrical systems of the buildings are old and have undergone very little maintenance, falling short of current safety standards. The Contractor shall complete the works in 3 phases and the activity breakdown of each phase is described below: Phase 1 (Design Phase): - Operative Safety Plan (P.O.S.) with all required documentation as per Italian Safety laws. - Executive Gantt Chart in reference to UNGSC/UNLB Works Supervisor’s request, and based on the actual work status; ¬ Signed and sealed Executive Project by a licensed engineer; - A complete list of all of the Contractor’s personnel and the registered vehicles. Phase 2 (Construction Phase): The construction phase shall comprise the following main activities: ­ Supervision of works; ­ Site preparation and mobilization; ­ Removal of old lighting, outlets and related components; ­ Removal of switchboard; ­ Provision and installation of electrical distribution and connections; ­ Provision and installation of lighting; ­ Provision and installation of exit signs; ­ Provision and installation of switchboard; ­ Site cleaning, transport and disposal of undesired materials and demobilization. Phase 3 (Testing & Certification Phase): ­ Testing and certification; ­ Preparation of as-built drawings signed by a licensed engineer; ­ Preparation of Maintenance Plan and list of installed materials; ­ Handover of buildings to GSC/UNLB.

Operation of electrical installations

Provincia regionale di Catania | Published March 6, 2013  -  Deadline April 30, 2013
cpvs
65320000

Operation of electrical installations

Operation of electrical installations

Comune di Mineo | Published March 21, 2013  -  Deadline April 10, 2013
cpvs
50232000, 65300000, 65320000

Operation of electrical installations

other electrical installation work

Roma capitale | Published September 29, 2012  -  Deadline October 31, 2011
cpvs
45317000

other electrical installation work

electrical supplies and accessories

Fondazione Istituto italiano di tecnologia | Published June 12, 2012  -  Deadline November 28, 2011
cpvs
31680000

electrical supplies and accessories

operation of electrical installations

Comune di Viterbo | Published June 5, 2012  -  Deadline July 30, 2012
cpvs
65320000

operation of electrical installations

other electrical installation work

Comune di Concordia Sagittaria (VE) | Published November 1, 2012  -  Deadline April 30, 2012
cpvs
45317000

other electrical installation work

operation of electrical installations

Comune di Mineo | Published November 3, 2012  -  Deadline November 12, 2012
cpvs
50232000, 65300000, 65320000

operation of electrical installations

operation of electrical installations

Comune di Furci Siculo | Published November 7, 2012  -  Deadline August 31, 2012
cpvs
50232000, 65300000, 65320000

operation of electrical installations

Electrical equipment and apparatus

Snam Rete Gas S.p.A. | Published December 20, 2012
cpvs
31600000

Electrical equipment and apparatus