Electrical engineering installation works

Health Service Executive (HSE) | Published October 25, 2016  -  Deadline November 28, 2016
cpvs
45315100, 45311000, 51100000, 71314310

The existing building is part of the large, mixed use development ‘Tallaght Cross West’, which is located in Tallaght Town Centre. The existing office building was developed to a shell and core standard.

Seeking Electrical Sub-Contractors for alterations and refurbishment of Unit 8 (A, B and C) as well as a 400 m² extension to the rear of the building at Burlington Bus Pk, Sragh Ave, Tullamore.

Health Service Executive (HSE) | Published January 8, 2016  -  Deadline February 5, 2016
cpvs
45210000, 45213260

Expressions of Interest are invited from suitably qualified Electrical Contractors who wish to be considered for the alterations, refurbishment and extension of the building as follows:

Unit A: removal of internal walls and construction of new dock levellers and roller doors to rear of building.

Unit B: Provision of new canteen, office and archive areas (the latter of which will be located in the basement and within a new mezzanine at first floor).

Unit C: Provision of new reception, offices, archive and other ancillary associated area (archives will be located in the basement and within a new mezzanine at first floor). New dock levellers and roller doors will be constructed to the rear of this unit also.

Proposed extension, approximately 400 m², will be constructed to the rear of the building to house the forklift charging station.

Mechanical and Electrical services will be upgraded throughout. Two (2) new lifts will be installed to serve 3 floors, each having five (5) stops to serve all levels.

Regrading of site to accommodate proposed dock levellers and a new waste

compound with fencing will also form part of the contract.

Seeking Mechanical Sub-Contractors for alterations and refurbishment of Unit 8 (A, B & C) as well as a 400 sq.m extension to the rear of the building at Burlington Bus Pk, Sragh Ave, Tullamore.

Health Service Executive (HSE) | Published January 8, 2016  -  Deadline February 5, 2016
cpvs
45210000, 45213260

Expressions of Interest are invited from suitably qualified Mechanical Contractors who wish to be considered for the alterations, refurbishment and extension of the building as follows:

Unit A: removal of internal walls and construction of new dock levellers and roller doors to rear of building;

Unit B: Provision of new canteen, office and archive areas (the latter of which will be located in the basement and within a new mezzanine at first floor);

Unit C: Provision of new reception, offices, archive and other ancillary associated area (archives will be located in the basement and within a new mezzanine at first floor). New dock levellers and roller doors will be constructed to the rear of this unit also.

Proposed extension, approximately 400 sq.m, will be constructed to the rear of the building to house the forklift charging station.

Mechanical and Electrical services will be upgraded throughout. 2 new lifts will be installed to serve 3 floors, each having 5 stops to serve all levels.

Regrading of site to accommodate proposed dock levellers and a new waste

compound with fencing will also form part of the contract.

Seeking Contractors for alterations and refurbishment of Unit 8 (A, B & C) as well as a 400 m² extension to the rear of the building at Burlington Business Park, Sragh Ave, Tullamore, Co. Offaly.

Health Service Executive (HSE) | Published January 8, 2016  -  Deadline February 5, 2016
cpvs
45210000, 45213260

Expressions of Interest are invited from suitably qualified Building Contractors

who wish to be considered for the alterations, refurbishment and extension of the

building as follows:

Unit A: removal of internal walls and construction of new dock levellers and roller

doors to rear of building.

Unit B: Provision of new canteen, office and archive areas (the latter of which will

be located in the basement and within a new mezzanine at first floor).

Unit C: Provision of new reception, offices, archive and other ancillary associated

area (archives will be located in the basement and within a new mezzanine at first

floor). New dock levellers and roller doors will be constructed to the rear of this

unit also.

Proposed extension, approximately 400 m², will be constructed to the rear of the

building to house the forklift charging station.

Mechanical and Electrical services will be upgraded throughout. Two (2) new lifts

will be installed to serve 3 floors, each having five (5) stops to serve all levels.

Regrading of site to accommodate proposed dock levellers and a new waste

compound with fencing will also form part of the contract.

Seeking Lift Sub-Contractors for alterations and refurbishment of Unit 8 (A, B and C) as well as a 400 m² extension to the rear of the building at Burlington Business Park, Sragh Avenue, Tullamore.

Health Service Executive (HSE) | Published January 8, 2016  -  Deadline February 5, 2016
cpvs
45210000, 45213260

Expressions of Interest are invited from suitably qualified Lift Contractors who

wish to be considered for the installation of 2No lifts within the overall project

described as follows:

Unit A: removal of internal walls and construction of new dock levellers and roller

doors to rear of building.

Unit B: Provision of new canteen, office and archive areas (the latter of which will

be located in the basement and within a new mezzanine at first floor).

Unit C: Provision of new reception, offices, archive and other ancillary associated

area (archives will be located in the basement and within a new mezzanine at first

floor). New dock levellers and roller doors will be constructed to the rear of this

unit also.

Proposed extension, approximately 400 m², will be constructed to the rear of the

building to house the forklift charging station. Mechanical and Electrical services

will be upgraded throughout.

The two (2) new lifts will be installed to serve 3 floors, each having five (5) stops

to serve all staggered levels.

HSE National Distribution Centre, Tullamore — seeking Mechanical Sub-Contractors for alterations and refurbishment of Unit 8 (A, B and C) at Burlington Business Park, Sragh Avenue, Tullamore.

Health Service Executive (HSE) | Published February 13, 2016  -  Deadline March 14, 2016
cpvs
45210000, 45213260

Expressions of Interest are invited from suitably qualified Mechanical Contractors

who wish to be considered for the alterations and refurbishment of the building as

follows:

Unit A: removal of internal walls and construction of new dock levellers and roller

doors to rear of building.

Unit B: Provision of new canteen, office and archive areas (the latter of which will

be located in the basement).

Unit C: Provision of new reception, offices, meeting rooms and other ancillary

associated area. New dock levellers and roller doors will be constructed to the

rear of this unit also. A forklift charging station will be provided in the warehouse

section of the building.

Mechanical and Electrical services will be upgraded throughout. One (1) new lift

will be installed to serve 3 floors, having four (4) stops to serve staggered levels.

Regrading of site to accommodate proposed dock levellers and a new waste

compound with fencing will also form part of the contract.

Framework Agreement for the Provision of Architect Lead Design Team Services.

Kildare County Council | Published November 4, 2015
Winner
Deaton Lysaght Architects
cpvs
71240000, 71000000, 71200000, 71220000, 71221000, 71242000, 71243000, 71244000, 71245000, 71247000, 71248000, 71250000, 71300000, 71310000, 71311000, 71312000, 71315000, 71315200, 71315210, 71321000, 71324000, 71334000, 71500000

Kildare County Council proposes to establish and operate multi-party Framework Agreements for Architect Lead Design Team Services primarily to provide consultancy services in connection with the provision of or alteration to the Contracting Authorities new social housing stock. The range of projects which will fall under the scope of the Framework Agreement will include but is not limited to: — New multi-unit social housing schemes on green or brown field sites; — Small infill housing schemes; — Major refurbishment of multiple existing dwellings, occupied or unoccupied. Services to be provided may also include feasibility studies and reports related to housing developments or sites. Services may also be required in connection with non housing related structures such as libraries, community centres, fire stations, offices and other structures in the ownership or control of Kildare County Council. The proposed Framework Agreement is intended to run for an initial 12-month term with the option to extend for a further 3 12-month terms (a maximum total term of 48 months or 4 years). The nature of the consultancy services that Kildare County Council wishes to avail of will be in the form of a design team lead by the Architect as the design team leader. Each of the other construction consultants, Structural/Civil Engineering, Quantity Surveying, Mechanical and Electrical Engineering, and Project Supervisor for the Design Phase will be sub-consultants to the design team leader.

Framework Agreement for the Provision of Architect Lead Design Team Services.

Kildare County Council | Published July 29, 2015  -  Deadline September 3, 2015
cpvs
71000000, 71200000, 71220000, 71221000, 71240000, 71242000, 71243000, 71244000, 71245000, 71247000, 71248000, 71250000, 71300000, 71310000, 71311000, 71312000, 71315000, 71315200, 71315210, 71321000, 71324000, 71334000, 71500000

Kildare County Council proposes to establish and operate multi-party Framework Agreements for Architect Lead Design Team Services primarily to provide consultancy services in connection with the provision of or alteration to the Contracting Authorities new social housing stock. The range of projects which will fall under the scope of the Framework Agreement will include but is not limited to: — New multi-unit social housing schemes on green or brown field sites — Small infill housing schemes — Major refurbishment of multiple existing dwellings, occupied or unoccupied Services to be provided may also include feasibility studies and reports related to housing developments or sites. Services may also be required in connection with non housing related structures such as libraries, community centres, fire stations, offices and other structures in the ownership or control of Kildare County Council. The proposed Framework Agreement is intended to run for an initial 12 month term with the option to extend for a further three 12 month terms (a maximum total term of 48 months or 4 years). The nature of the consultancy services that Kildare County Council wishes to avail of will be in the form of a design team lead by the Architect as the design team leader. Each of the other construction consultants, Structural/Civil Engineering, Quantity Surveying, Mechanical & Electrical Engineering, and Project Supervisor for the Design Phase will be sub-consultants to the design team leader.

Architectural, construction, engineering and inspection services

Health Service Executive (HSE) | Published February 4, 2017  -  Deadline March 14, 2017
cpvs
71000000, 71200000, 71311000, 71312000, 71317200, 71321000, 71324000, 71334000, 75251110

The Health Service Executive (HSE) is planning the design and construction of a new acute inpatient ward block development at the University Hospital Limerick Campus, Dooradoyle, Limerick to be constructed overhead the hospital's new emergency department (at level 0) and dialysis unit (at level 1). A total of 4 inpatient wards, each containing 24 single inpatient rooms are envisaged along with hospital street link corridors at each level. The proposed building extension is anticipated to be in the region of 1 935 m2 overall per level giving a gross floor area of circa 7 750 m2 for the project excluding plant room space which will be additional. The Health Service Executive now wish to procure and appoint a design team for the project to include Architect (including Employers Representative and Project Supervisor Design Process roles), Fire Engineer, Quantity Surveyor, Mechanical and Electrical Engineer and Civil and Structural Engineer. The ward design will be to a high quality standard.

Architectural, Employer's Representative and Project Supervisor Design Process (PSDP) Professional Technical Services for delivery of the following project.

The Health Service Executive (HSE) is planning the construction of a new acute inpatient ward block development at University Hospital Limerick, St Nessan's Road, Dooradoyle, Co. Limerick. This proposed development is to be constructed overhead the hospital's new emergency department (at level 0) and dialysis unit (at level 1), both of which will be required to remain operational during the construction of the inpatient ward block overhead. A total of four new inpatient wards, each including 24 single inpatient rooms are envisaged as per the hospital's development control plan along with hospital street link corridors at each level and other associated works. The proposed building extension is anticipated to be in the region of circa 1 950 m2 overall per level giving a gross floor area of circa 7 800 m2 excluding plant space for the project. Related plant room space will also be required as part of the project and will be additional space whilst the existing plant room serving ED and Dialysis and located overhead the dialysis unit will likely need to be relocated as part of the project and addressing this also forms part of the scope of services required from the successful design team.

Fire Engineering Professional Technical Services for delivery of the following project.

The Health Service Executive (HSE) is planning the construction of a new acute inpatient ward block development at University Hospital Limerick, St Nessan's Road, Dooradoyle, Co. Limerick. This proposed development is to be constructed overhead the hospital's new emergency department (at level 0) and dialysis unit (at level 1), both of which will be required to remain operational during the construction of the inpatient ward block overhead. A total of 4 new inpatient wards, each including 24 single inpatient rooms are envisaged as per the hospital's development control plan along with hospital street link corridors at each level and other associated works. The proposed building extension is anticipated to be in the region of circa 1 950 m2 overall per level giving a gross floor area of circa 7 800 m2 excluding plant space for the project. Related plant room space will also be required as part of the project and will be additional space whilst the existing plant room serving ED and Dialysis and located overhead the dialysis unit will likely need to be relocated as part of the project and addressing this also forms part of the scope of services required from the successful design team.

Mechanical and Electrical Engineering Professional Technical Services for delivery of the following project.

The Health Service Executive (HSE) is planning the construction of a new acute inpatient ward block development at University Hospital Limerick, St Nessan's Road, Dooradoyle, Co. Limerick. This proposed development is to be constructed overhead the hospital's new emergency department (at level 0) and dialysis unit (at level 1), both of which will be required to remain operational during the construction of the inpatient ward block overhead. A total of 4 new inpatient wards, each including 24 single inpatient rooms are envisaged as per the hospital's development control plan along with hospital street link corridors at each level and other associated works. The proposed building extension is anticipated to be in the region of circa 1 950 m2 overall per level giving a gross floor area of circa 7 800 m2 excluding plant space for the project. Related plant room space will also be required as part of the project and will be additional space whilst the existing plant room serving ED and Dialysis and located overhead the dialysis unit will likely need to be relocated as part of the project and addressing this also forms part of the scope of services required from the successful design team.

Full Structural Engineering Professional Technical Services and with some limited Civil Engineering Professional Technical Services required for the delivery of the following project.

The Health Service Executive (HSE) is planning the construction of a new acute inpatient ward block development at University Hospital Limerick, St Nessan's Road, Dooradoyle, Co. Limerick. This proposed development is to be constructed overhead the hospital's new emergency department (at level 0) and dialysis unit (at level 1), both of which will be required to remain operational during the construction of the inpatient ward block overhead. A total of 4 new inpatient wards, each including 24 single inpatient rooms are envisaged as per the hospital's development control plan along with hospital street link corridors at each level and other associated works. The proposed building extension is anticipated to be in the region of circa 1 950 m2 overall per level giving a gross floor area of circa 7 800 m2 excluding plant space for the project. Related plant room space will also be required as part of the project and will be additional space whilst the existing plant room serving ED and Dialysis and located overhead the dialysis unit will likely need to be relocated as part of the project and addressing this also forms part of the scope of services required from the successful design team.

Full Structural Engineering Professional Technical Services and with some limited Civil Engineering Professional Technical Services required for the delivery of the following project.

The Health Service Executive (HSE) is planning the construction of a new acute inpatient ward block development at University Hospital Limerick, St Nessan's Road, Dooradoyle, Co. Limerick. This proposed development is to be constructed overhead the hospital's new emergency department (at level 0) and dialysis unit (at level 1), both of which will be required to remain operational during the construction of the inpatient ward block overhead. A total of 4 new inpatient wards, each including 24 single inpatient rooms are envisaged as per the hospital's development control plan along with hospital street link corridors at each level and other associated works. The proposed building extension is anticipated to be in the region of circa 1 950 m2 overall per level giving a gross floor area of circa 7 800 m2 excluding plant space for the project. Related plant room space will also be required as part of the project and will be additional space whilst the existing plant room serving ED and Dialysis and located overhead the dialysis unit will likely need to be relocated as part of the project and addressing this also forms part of the scope of services required from the successful design team.