Call +44 800 9755 164

Public tenders for electrical in Dublin Ireland

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

Electrical equipment and apparatus

The Office of Government Procurement | Published November 15, 2016

This is a Prior Information Notice (PIN) and not a call for competition. The Office of Government Procurement intends to invite submissions from companies / organisations with expertise and capability relating to the provision of Fire Alarm and Emergency Lighting Maintenance Services.

Electricity

EirGrid plc | Published November 5, 2016  -  Deadline December 8, 2016

This RFP is being issued to Tenderers in accordance with Council Directive 2014/25/EU under the Open Procedure to allow EirGrid plc (‘EirGrid’) and SONI Limited (‘SONI’) select Service Providers to participate in a trial to demonstrate the provenability and measurability of a range of new and existing DS3 System Services from new technologies.

A wider range of DS3 System Service Providers, including Service provision by new technologies will help EirGrid and SONI meet the challenge of operating the electricity system of Ireland and Northern Ireland with increased levels of renewable energy. This is a key step towards the decarbonisation of the electricity system, which has wider societal and consumer benefits.

Select Service Providers to participate in a trial to demonstrate the provenability of POR from Wind.

Select Service Providers to participate in a trial to demonstrate the provenability of RM3 from Wind.

Select Service Providers to participate in a trial to demonstrate the provenability of POR from DSM.

Select Service Providers to participate in a trial to demonstrate the provenability of POR from other technologies.

Select Service Providers to participate in a trial to demonstrate the provenability of RM3 from other technologies excluding HVDC interconnectors.

Select Service Providers to participate in a trial to demonstrate the measurability of FFR from Conventional, DSM, Wind and other technologies.

Select Service Providers to participate in a trial to demonstrate the measurability of FPFAPR/ DRR from Conventional, Wind and other technologies (excluding DSM).

Architectural and related services

Grangegorman Development Agency | Published November 25, 2016  -  Deadline December 20, 2016

Consultancy services for a multi-storey residential care centre at Grangegorman, Dublin 7, consisting of between 100 to 120 bedrooms with ancillary support functions and below grade car parking and associated landscaping.

Two stage restricted procedure for the selection of Architect.

Two stage Restricted Procedure for selection of Structural & Civil Engineer.

2 stage Restricted Procedure for selection of Mechanical, Electrical and Public Health Engineer.

2 stage Restricted Procedure for selection of Quantity Surveying and Whole Life Costs Manager.

2 stage Restricted Procedure for selection of Fire Safety Consultant.

Construction work

Dublin City University ( DCU ) | Published November 15, 2016  -  Deadline December 15, 2016

It is the requirement of Dublin City University (‘DCU’) to appoint six (6) nr Contractors to a Framework to carry out selected works on properties owned and operated by DCU, and it's subsidiaries and associated colleges in the Dublin region, consisting of but not limited to DCU Ballymun & Glasnevin, St Patricks, All Hallows, DCU Sports Campus & Alpha Campus consisting of approximately 78 buildings over 280,000 m2.

The Framework works may include, but are not limited to:

General Building Works

Extensions, Demolitions and Alterations to and of Existing Structures

Construction of New Buildings

Repair and Refurbishment of Existing Buildings

Mechanical and Electrical Works

Minor Civil Engineering Works

Works to Protected & Preserved structures

Miscellaneous Maintenance Projects.

Petroleum products, fuel, electricity and other sources of energy

Department of Arts, Heritage, Regional, Rural & Gaeltacht Affairs | Published November 12, 2016  -  Deadline January 17, 2017

Minister for Arts, Heritage, Regional, Rural and Gaeltacht Affairs request for provision of turf for domestic home heating as part of Cessation of Turf Cutting Compensation Scheme for 2017 and 2018.

The supply and delivery of 15 tonnes of good quality fuel sod peat of less than 36 % moisture for domestic home heating at a fixed price per household during 2017 and 2018 within Lot 1. For the purpose of this tender a turf delivery is 15 Tonnes of Turf.

They will require access to an advanced delivery network capable of supplying 15 tonnes of turf as set out in Lot 1 in the RFT document commencing in June 2017.

The supply and delivery of 15 tonnes of good quality fuel sod peat of less than 36 % moisture for domestic home heating at a fixed price per household during 2017 and 2018 within Lot 2. For the purpose of this tender a turf delivery is 15 Tonnes of Turf.

They will require access to an advanced delivery network capable of supplying 15 tonnes of turf as set out in Lot 2 in the RFT document commencing in June 2017.

Sheltered housing construction work

FOLD Housing Association Ireland | Published November 2, 2016  -  Deadline December 5, 2016

FOLD Ireland wish to appoint a competent and experienced building contractor to construct 43 No. sheltered housing units and associated site development works for senior citizens at Dolphin Park, Rialto, Dublin 8.

FOLD Ireland wish to appoint a competent and experienced building contractor with mechanical and electrical works capacity and experience of social housing projects to construct and complete all necessary works to deliver on programme a new development of 43 No. sheltered housing units for senior citizens and communal facilities and associated site development works at Dolphin Park, Rialto, Dublin 8.

The works consist of the development of 5 No. residential blocks (A to E) ranging from 2 to 4 storeys, comprising of 42 No. (1 Bed) Apartments and 1 no (2Bed) Apartment, and a community centre (c.115 m²) located at ground floor level of Block A, access to blocks via 2no. stair and lift cores and external walkways to each apartment, all totalling 3 459 m². Provision for refuse store (c.16 m²), external store (13 m²), ESB substation and 8no. car parking spaces

The site works will include modifications to the existing hard play area and a section of the existing public road (Dolphin Park) and associated adjoining footpath within the site boundary to accommodate the proposed development. The development will include the relocation of the existing bollards and construction of a new access road to the South, East and North of the site.

  • 1