Call +44 800 9755 164

Public tenders for electrical in Zalaegerszeg Hungary

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!
ElectricalHungaryzalaegerszeg

Electricity

Zalaegerszeg Megyei Jogú Város Önkormányzata | Published September 10, 2016  -  Deadline October 13, 2016
cpvs
09310000

in some places of use for the Institutional Supply Organisation for Economic entire electrical power is not based public lighting purposes 1,790,692 kWh amounts of 01/01/2017. 12.31.2018 00:00. 24:00.

Electricity

Zalaegerszeg Megyei Jogú Város Önkormányzata | Published January 14, 2015
Winner
<CONTACT_DATA_WITHOUT_RESPONSIBLE_NAME><ORGANISATION><OFFICIALNAME>Budapesti Elektromos Művek Nyrt.</OFFICIALNAME></ORGANISATION><ADDRESS>Váci út 72–74.</ADDRESS><TOWN>Budapest</TOWN><POSTAL_CODE>1132</POSTAL_CODE><COUNTRY VALUE="HU"/></CONTACT_DATA_WITHOUT_RESPONSIBLE_NAME>
cpvs
09310000

Zalaegerszeg Municipality institutions and public lighting in the total electricity supply from 2015 to 2016. year framework of electrical energy trading contracts.

Electricity

Zalaegerszeg Megyei Jogú Város Önkormányzata | Published December 28, 2016
Winner
EDF DÉMÁSZ Zrt.
cpvs
09310000

Zalaegerszeg Municipality institutions and public lighting based on the total electricity supply from 2017 to 2018. Electrical year framework of energy trading contracts.

Part I

24:00.

II. part

24:00.

III. part

24:00.

24:00.

Use Local Number: 147 pcs.

Contracting entitled under the contract period specified above in relation to the quantity of + 15% for the same degree deviate offered by the contractor's contractual terms of the contract price.

Detailed specifications included in other public documents.

24:00.

Use Local Number: 147 pcs.

Contracting entitled under the contract period specified above in relation to the quantity of + 30% for the same degree deviate offered by the contractor's contractual terms of the contract price.

Detailed specifications included in other public documents.

24:00.

Use the number of places: 20 pieces.

Contracting entitled under the contract period specified above in relation to the quantity of + 30% for the same degree deviate offered by the contractor's contractual terms of the contract price.

Detailed specifications included in other public documents.

County Board of County Disaster Keszthely Professional Fire Headquarters building renovation and electrical installation of attic network - information on the outcome of the proceedings

Zala Megyei Katasztrófavédelmi Igazgatóság | Published November 28, 2014
Winner
LE-KO Építőipari Kft.
cpvs
45000000

Board Zala County Disaster Keszthely professional fire building and renovating electrical network Headquarters building attic: Captured armed staircase formwork - 8 m2 Office Jobs prefabricated slabs demonstrate slab demolition sites - 15 m Floor Uploads breakdown - Making 66 m3 Stairs of reinforced concrete - Create 3 m3 screed substrate prefabricated materials - 12 , preparation of 84 m3 of load-bearing and infill masonry - 22.4 m2 wood roofing - 330 m2 lathing - 330 m2 CW metal frame structure mounted partition normal - 207 m2 Mounted drywall ceiling metal frame structure - Creating 247 m2 dry plaster - 76 m2 Floor bearing structure of surface preparation - 164 m2 of wall, pillar, column cladding Preparation - Preparation of 44.8 m2 Floor - Creating socket Housing 35 m2 - 36 m Laying Laminate Flooring - 114 m2 Window - 18 pieces of wood interior doors and placement - 11 pieces with Interior painting surface preparation - 511.9 m2 dispersion paint - 511.9 m2 Technical Insulation - 264 m2 High Roof heat and sound insulation of 420 m2 floor flange seal placement - insulation against 150 m Operating use water hajlaterősítése -25 m Muffle drain pipe - 48 pieces of ventilation fittings, pipes - 12 pieces of building services and industrial Pipe Insulation - 13 m Universal plastic pipes - 340 m of thin-walled installation, copper hot and cold water - 60 m Heaters - 12 Radiator parts (valves, etc) - 56 pieces of building services and industrial pipe insulation - 60 m brackets - 48 pieces Actuator - 1 three-way mixing valve - one piece aluminum insert, oxigéndiffúziómentes plastic pipe - 80 meters of building services and industrial pipe insulation - 80 m Faucet - 5 sanitaryware - 6 pieces of household dishwasher - 1 shelves, soap, etc - 8 Wall Fracture - 42 Horonyvésés - 1160 m Drilling's Nest I ...

Electricity

Zala Megyei Kormányhivatal | Published December 6, 2016  -  Deadline January 9, 2017
cpvs
09310000

Purchases of electricity within the framework of the Municipal and County Government Offices for the full supply of electricity trading contracts.

Purchases of electricity to the Municipal and County Government Offices for.

The contracting authority invites the bidders' attention to the fact that LXXXVI 2007 on electricity. Based on Law § 74 (1) e) of the electricity trade subject to licensing. The license verifies the existence of the contracting records of the Hungarian Energy and Utilities Regulatory Agency.

Total contracted amount: 27,907,747 kWh + 50% option by contracting the amount of options in addition to user-defined locations may use in respect of another property as well.

The 50% difference fixed penalty-free, with no obligation to use contracting.

in the context of full supply contracts and selling above amount of electricity 03.01.2017. 00:00 and 02/28/2018. the period between 24:00.

Electricity

Zalaegerszeg Megyei Jogú Város Önkormányzata | Published July 22, 2016
Winner
E.ON Energiakereskedelmi Kft.
cpvs

Electricity

Modernization works of respite care center for the homeless Zalaegerszeg 4539/6 hrsz.-u property

Magyar Vöröskereszt Zala Megyei Szervezete | Published April 29, 2015
Winner
Ifj. Scheiber Béla építési vállalkozó
cpvs
45215210, 45260000, 45400000, 45300000

Subject: Works "respite care center for homeless modernization works of the Zalaegerszeg 4539/6 hrsz. property under the SIOP-u-3.4.2-11 / 1-2012-0286 project with identification number" Quantity: renovating an existing building, remodeling and modernization 1,426.24 m2 floor area upgraded. Number of seats 90 people. The current tick-storey flat-roofed building complex internal transformation function goals, electrical and plumbing renovations, facade renovation, insulation and window replacement. Functions "night shelter", "day shelters," community and social facilities: libraries, educational spaces, employing creation of small residential units, and "soup kitchen" to provide cooked food warm. Accessibility, transport, construction of parking shower toilet. Building Energy and electrical system upgrade. How to realize complex architectural, electrical and építménygépészeti- construction works construction works. The itemized quantities and technical specifications of the construction plan documentation and unpriced included in the budget proposals.

TEE Pressure Management

Önkormányzati Társulás Zalaegerszeg és térsége ivóvízminőségének javítására | Published October 2, 2015
Winner
CONTROLSOFT-AUTOMATIKA Szolgáltató Kft.
cpvs
45231300, 45232150, 42961000

"A contract" to improve the service area of ​​the settlements in the ZALAVIZ Zrt. (North and Central -Zala county) drinking water quality and water supply development "(TOP-1.3.0 / 09-11 / 2013-0013) project," Zalaegerszeg drinking water supply network and I II. nyomásmenedzsmentje pressure area "to improve the service area of ​​the settlements in the ZALAVIZ Zrt. (North and Central -Zala county) drinking water quality and water supply development projected over (TOP-1.3.0 / 09-11 / 2013-0013), a new project volumes, and the call for proposals Based on its annexes. Purpose: To eliminate the negative effects experienced drinking water network, making the project more favorable return on investment. The expected positive effects of pressure control: • Reducing water loss, • conserve network elements (decrease errors and increase service life), • to increase the quality of service (pressure fluctuations, eliminating annoying fluctuations). I work involved Zalaegerszeg pressure zone Project in this area: affected areas to be protected and ZGT-15, 16-ZGR, ZGR Zalaegerszeg II-27 lines. Project-affected zone pressures work in this area: ZGT-33 cable, mountain drinking water storage Quantitative data Zalaegerszeg Zalaegerszeg I pressure zone 1 pc. ring piston valve, DN 400, PN10 or equivalent assembly DN in Process Control shut-off valves 300, PN10 or equivalent fittings Fast foreclosure, repairs required operator demand system locked, on-line to ensure the operation of operator demand (webscada) The required electrical electrical wiring and measuring place, in line with the provisional implementation period for the design, if necessary Zalaegerszeg II. Pressure zone 1 pc. construction of ring piston valve, DN 200, PN16 or equivalent assembly bypass accidents in online opening / closing facilities required watertight manhole construction / expansion in the Process Control System locked, on-line to ensure the operation of operator demand (webscada) Control 1 3 pieces of critical pressure point is made based on the value (the number of pieces determined by the operator during the system design) The necessary electrical connections and measuring place, in line with the provisional implementation period for the design, if necessary

Contract Amendment - for sewage szennyvízvagyonra in Zalaegerszeg Municipality renovation of the property, the exclusion of stormwater, wastewater treatment plant improvements, sewer reconstruction

Önkormányzati Társulás Zalaegerszeg és környéke csatornahálózat és szennyvíztisztítótelep fejlesztésére | Published August 28, 2015
Winner
Szabau Invest Kft.
cpvs
45232400, 45232411, 45232420, 42120000, 42122220, 45259100, 45259200, 45252127, 71240000

Szennyvízvagyonra for sewage in Zalaegerszeg County Council owned the framework of a contract for renovation of the exclusion of stormwater, wastewater treatment plant improvements, sewer reconstruction Sewage Renovation: If the installation required mechanical or electrical conversion is the responsibility of the Contractor. If the mechanical or electrical installation is required for the transformation of the Contractor is responsible. If the mechanical or electrical installation is required for the transformation of the Contractor is responsible. If the mechanical installation or electrical conversion is required, it is the responsibility of the Contractor. Built continuation of the exchange of pumps: If required, the installation of mechanical or electrical conversion shall take responsibility of the Contractor. Rainwater tanks to the exclusion sulphate resistant coating, absorbing exchanges, exchanges cover, binding repairs, main pipe replacement: Landorhegyi road 7-9-11 sewage main pipeline reconstruction and renovation. The task of the road Landorhegyi 7-9-11. number of properties stretching before construction of sewers. This can cause major health problems. The restoration maintained by the Hungarian Roads roads and road management operators are fixed according to the summary. Making shafts watertight, sulphate resistant coating, cover and reducer exchanges: National Guard u .: 28 800 Ø Preparation of mine sulphate resistant and waterproof coating two layers. U titmouse .: 6 1000 Ø Making a mine sulphate resistant and waterproof coating two layers. Erkel F. u (u section between Foothills and the Republic.). 16 800 Ø Preparation of mine sulphate resistant and waterproof coating two layers. Ø Preparation of 7 1000 mine sulphate resistant and waterproof coating two layers. Vizsla Park u. 15 800 Ø Preparation of mine sulphate resistant and waterproof coating two layers. Botfy u. Ø Preparation of 2 800 mine sulphate resistant and waterproof coating layer 2, 4 Ø 1000 mine sulphate resistant and waterproof coating of two layers. Dózsa Gy. U. 28 x Ø 800 mine preparation sulphate resistant and waterproof coating in 2 layers, 23 pieces 800/600 cover and absorbing exchange, 5 800/600 restrictor replacement Wastewater Treatment Plant Improvements: Improvements in determining the already available several years of operational experience and innovation was Working towards a The main guideline. Reconstruction of storm water drainage works: Based on rainfall drainage ditches adjacent o Existing principles reconstruction of roads site survey. o Washing solution Channel filling rainwater drainage. Gázdómjainak insulation digesters: o The two hosts of the vertical walls have adequate insulation layer structure. o Hiding the development and connection sockets according to the technology. Chemical dosing in front of the building and the post-settling Thickening: Or, the extension of an existing pipeline of inhaled chemicals in the waste water tax will iszapsűrítők distributor shaft. Either option shall receive the established system: Implementation o Automatic feed the drain of the signal analyzer. o Power to carry out electrical works. o Design and execution. Homokleválasztó Renovation: Expected improvements are needed in the following: o o dismantling renovation of conveyor pulley replacement brushes o o o Reconstruction of heating insulation replacement. Raw water pipeline development in the biological denitrification tanks: Both biological system by the sewage pumping system the following: o FLYGT pump or an equivalent installation of the spaces K1, pumping his feet, the leading removable tube design. o The pump must be able to at least 70 m3 / hr capacity transporter. o DN 150 discharge line from the pump to carry out construction of the Ox into three o Electrical works. o Planning (pump sizing), inlet duct construction and renovation of homokfogónál bypass cord divorced kiinjektálása or concrete surfaces with plastic sheeting lining the stage. The raw sewage extra lift during construction. DEMON technology covering the technology to reduce heat loss from the floating surface insulation installation of bullets. Way channel between the Republic of Zalaegerszeg (W County Road and Republic road. 56) reconstruction: the purchase and design tasks that goes with the winning bidder obligation to form the building permit. Zalaegerszeg Rákóczi Street sewer reconstruction of the section between the Golden and John Martyrs road. Because of the significant Rákóczi road to motor traffic, and therefore must be implemented as follows béleléses the reconstruction method (without disconnecting the cover): The Rákóczi Street sewer Features: Channel Length: 254 m. Channel diameter: 50/75 cm concrete

Contract Amendment - Pressure Management

Önkormányzati Társulás Zalaegerszeg és térsége ivóvízminőségének javítására | Published October 7, 2015
Winner
CONTROLSOFT-AUTOMATIKA Szolgáltató Kft.
cpvs
45231300, 45232150, 42961000

"A contract" to improve the service area of ​​the settlements in the ZALAVIZ Zrt. (North and Central -Zala county) drinking water quality and water supply development "(TOP-1.3.0 / 09-11 / 2013-0013) project," Zalaegerszeg drinking water supply network and I II. nyomásmenedzsmentje pressure area "to improve the service area of ​​the settlements in the ZALAVIZ Zrt. (North and Central -Zala county) drinking water quality and water supply development projected over (TOP-1.3.0 / 09-11 / 2013-0013), a new project volumes, and the call for proposals Based on its annexes. Purpose: To eliminate the negative effects experienced drinking water network, making the project more favorable return on investment. The expected positive effects of pressure control: • Reducing water loss, • conserve network elements (decrease errors and increase service life), • to increase the quality of service (pressure fluctuations, eliminating annoying fluctuations). I work involved Zalaegerszeg pressure zone Project in this area: affected areas to be protected and ZGT-15, 16-ZGR, ZGR Zalaegerszeg II-27 lines. Project-affected zone pressures work in this area: ZGT-33 cable, mountain drinking water storage Quantitative data Zalaegerszeg Zalaegerszeg I pressure zone 1 pc. ring piston valve, DN 400, PN10 or equivalent assembly DN in Process Control shut-off valves 300, PN10 or equivalent fittings Fast foreclosure, repairs required operator demand system locked, on-line to ensure the operation of operator demand (webscada) The required electrical electrical wiring and measuring place, in line with the provisional implementation period for the design, if necessary Zalaegerszeg II. Pressure zone 1 pc. construction of ring piston valve, DN 200, PN16 or equivalent assembly bypass accidents in online opening / closing facilities required watertight manhole construction / expansion in the Process Control System locked, on-line to ensure the operation of operator demand (webscada) Control 1 3 pieces of critical pressure point is made based on the value (the number of pieces determined by the operator during the system design)

Zalaegerszeg Seniors Housing Development, energy-efficient, sustainable operational level to ensure the preparation, renovation and conversion munkálatai- Information amending the contract

Zalaegerszeg Megyei Jogú Város Önkormányzata | Published October 29, 2014
Winner
SZABADICS-ÉPÍTŐ KFT.
cpvs
45262690, 45321000, 45421100, 45261310, 45300000, 45310000

Zalaegerszeg, Kossuth L. u. 58-60. c. Retired at home under house development work on energy-efficient, sustainable operating level to ensure the preparation, restoration and conversion of the SROP-3.1.1 / B2-13-k2-2013-0001 identification number, "Social rehabilitation Zalaegerszeg city" - in the framework of the project entitled, works as part of the documentation shall be performed in accordance with the technical documentation to be issued. Total net area of ​​the built alagútzsalus technology, reinforced concrete building 3289 m2. Development work includes: - Exterior subsequent thermal insulation (1350 m 2) - Replacement of exterior doors and windows (windows, doors, patio doors, Crafts walls) - Replacing the front door (flats 245) - Replacing roofing new bádogozással (1380 m2) - attic thermal insulation (1080 m2) - 1 person elevator replacement - medical office development, transformation (43 m2) - ground floor ceiling work, preparing boxed ceiling (427 m2) - accessibility works (pedestrian passage ramp, replacement front glass wall, barrier-free sanitary design,), - building work - building electrical works - furniture interior courtyard development

Zalaegerszeg County Council "to maintain active elements of a contract to Zalaegerszeg, public lighting Municipality 2016-2020. year. "Táj.elj.eredm.

Zalaegerszeg Megyei Jogú Város Önkormányzata | Published January 18, 2016
Winner
SISTRADE-SMHV Zalaegerszeg Közvilágítás Konzorcium (SISTRADE Kft. és SMHV Energetika Kft.)
cpvs
50000000

Subject: a contract to Zalaegerszeg, maintain active elements of public lighting Municipality 2016-2020. year. Tasks to be performed and the amount Zalaegerszeg administrative area of ​​a total of 7,803 + 5% (6031 and 1772 pieces of conventional LEDs - sodium, mercury, compact fluorescent light - a light source mounted) operation, maintenance, supervision and control of active elements of light space. • Equipped with standard conventional luminaires and energy-saving light source must be 000 hours. • Equipped with LED lighting fixtures manufacturer during the term of the contract is artificially guarantee, therefore any associated additional conditions must be met: o take part in the contractor's employees in the operation and maintenance of the LED fixtures are the subject of practical training held by production plant before the start of operational activities. o only made known. Over the provision of operational and maintenance activities Schedule parts kit may be installed provided the LED luminaires. o The defective parts shall be submitted to the manufacturer and should ensure the continuous replenishment of consignment inventory of spare parts provided by the manufacturer Art. o LED lamp single failure on the occasion of the detected error and error location should be documented and handed over to the customer, as well as for production plant. • An error reporting system should be developed for continuous operation, it must be reported to the public lighting of the possibility of failure to provide notice from the public telephone, fax, e-mail. • Service and maintenance work must be carried out as follows: • The busy junction (road sections long-distance and local bus transport in question), pedestrian crossings designated an individual as well as collective case of (three or more) of lamp failure: 48 hours • National roads crossing sections of individual Errors and luminaire with 3 or more adjacent individual errors: • 72 hours of individual errors occurring Other locations: • A 96 hour periods assumed above potential, the passive element occurring in the electrical power supply failure

Works in Zala County Hospital (NYDOP-5.2.1 / C 11-2012-0001)

Zala Megyei Kórház | Published October 2, 2015
Winner
ZÁÉV Építőipari Zrt.
cpvs
45000000, 45215100, 45215220

Psychiatry building: Built in 1973, vb.pillérvázas, brick masonry infill, ground floor + two floors design, traditional flat roof lágyfedésű through structural reform of the institute, department of psychiatry jobs after a scheduled 69-bed inpatient department, respectively. the day hospital will be constructed. The main characteristics, data of the construction works: • Replacement of original timber-framed facade windows, plastic construction • EPS facade insulation (10cm) • Deck additional thermal insulation and new insulation against rainwater • Total accessibility • The building of water-wastewater, process water, restoration of ventilation and heating system full exchange • coatings Key figures: Planned number of beds: 69 pcs Built area: 667m2 Built net floor area: 1,932 m2 roof surface: 712 m2 Front Surface: Number of 1355 m2 wards: 15 pieces to replace Number of windows: 89 pieces of painted wall surface: 5043 m2 PVC sheeting: 724 m2 Gres porcelain tiles 1148 m2 Oldalfalburkolat: 559 m2 Employing The building was built in 1985, lightweight, prefabricated flat roof single storey timber-frame house. Since the construction of the psychiatric department of social employer, daytime operation only. The building of the planned works primarily energy-related renovations, respectively. sanitary modernization. Performed this context, the main tasks: • painted wall surface: 892m2 • Flat roof insulation: 803m2 Key data: Gross floor area: 626m2 net floor area: 607m2 painted wall surface 892 m2 in the application of the planned works include the partial accessibility, the main building thermal renovation of barrier-free Toilet creation. Síküvegezés will be replaced in the greenhouse's glass 10mm polycarbonate disk is restored to the heating, water, sewage and electrical systems. Key figures: • Gross floor area: 233m2 • net floor area 195 m2 • to replace the glass surface: 171m2

Zalaegerszeg northern relief road II. the pace of kivitelezése- táj.elj.eredm

Zalaegerszeg Megyei Jogú Város Önkormányzata | Published July 3, 2015
Winner
Colas Út Zrt. és HYDROCOMP Mélyépítő Kft. közös ajánlattevők
cpvs
45233120, 45111000, 45233125, 45111290, 45221230, 45232130, 45233294, 45233221, 71322000

A contract to Zalaegerszeg County Council as part of the Customer northern relief road II. within the framework of the preparation of the No. NYDOP-3.1.1 / B1-13-2013-0005 A project's "Complex rehabilitation program in Zalaegerszeg downtown" in the pace of construction and design plans. Construction works: Zalaegerszeg northern relief road II. planned pace of railway track 2x1-lane urban collector road, connected three járműosztályozós node intersecting road and utility construction and közműkiváltás (drainage, telecommunication networks, CATV networks, 0.4 and 22kV-inch electrical and public lighting networks): • Slaughterhouse Street (north a new road link relief road Phase I expansion) and John Hock road (No. 76 highway border section) from road construction work, • Public building construction, (telecommunications, electricity networks, sewerage, street lighting) o The telecom (T-Com's network redemption, redemption Gts Datanet network, CATV network triggered) together with the net cost of 4 million appropriation. Design work: • Road and storm sewer construction plan, • public lighting network establishment and supply of yellow flashers energy construction plan, Chapter (22-23.§) and Annex 1: implementation plans according to "The construction documents contained". Involved in the settlement's main quantities: • pavements and demolition of asphalt pavement 971 m2 • humic soil removal earthworks 2149 m3 • Earth Works notch, earthwork filling 9592 m3 • Mirror making smoother rolling Production of 13655 m2 • Soil layers to improve sandy gravel 2,731 m3 • Subsurface bearing capacity of lime or cement stabilizáció- a mixture of 13655 m2 • Colony mixed hydraulically bound base layer (CKT) 504 m3 405 m2 • Asphalt binder and wearing layers of 1,815 m3 • Borders 6764 m • Rainwater sewer construction, pipe length 1366 m • Open paved trench 131 m • Street lighting 1 and related ancillary works : markings, traffic control equipment, manhole covers szintbeemelése, pedestrian barrier construction, gully cleaning and construction. It is procured in detail in the technical documentation to be issued as part of the documentation.

Reference number 2 amending the contract

Nagypáli Község Önkormányzata | Published August 24, 2015
Winner
Nawaro Energy Kereskedelmi és Szolgáltató Kft.
cpvs
45310000, 45315000, 71321000, 09331000

"Turn-key construction of photovoltaic power generation systems, and preparing construction plans Nagypáliban at the following locations: Renewable Energy Innovation Ökocentruma (8912 Nagypáli, 030/2 u.), Logistics Center (8912 Nagypáli, 035/2 u.), Village House, surgery ( .. 8912 Nagypáli, Arany János u 26), Service Centre (8912 Nagypáli, Arany János u 26) "Main quantities: The construction task relates to the preparation of the solar power generation system construction drawing, as well as the transportation associated with the system tools and complete turnkey construction, including the building to supplement the existing electrical network of solar generating facilities capable fed back into the supply network, in isolated operation "NO". Partial / complete replacement of the primary objective of contracting consumption of electricity generating equipment, and the resulting surplus production sold during the accounting period operating using renewable energy sources. To this end, Contracting photovoltaic power generation system of implementation decided. Just licensee inverter system can be installed. Solar-powered system that the solar modules with regard to compliance with the IEC61215 and the requirements of the EN61730 standard: Number of modules: 150 Total installed side DC output: 37.5 kWp Substructure: aluminum sloped roof support structure 40 x 40 module profiles, U toldóprofil U-secondary clamps, V végleszorító Inventors: - 1 three-phase 12 kW - 10 kW 3-phase 2 - 1 3 1 phase kW For further details and the exact specification contains the technical description part of the documentation.

County Hospital - works (SROP-5.2.1 / C 11-2012-0001)

Zala Megyei Kórház | Published March 27, 2015
Winner
ZÁÉV Építőipari Zrt.
cpvs
45000000, 45215100, 45215220

Construction works for the County Hospital "Development of Rehabilitation Services in West Pannon Region health institutions," the NYDOP-5.2.1 / C No. 11-2012-0001 framework of Psychiatry building project in 1973 was built vb.pillérvázas, brick masonry infill ground floor and two floors design, traditional flat roof lágyfedésű through structural reform of the institution, after the psychiatry department works proposed 69-bed inpatient department, respectively. the day hospital will be constructed. The main characteristics, details of construction works: • Replacement of original wooden front doors and windows, plastic construction • EPS facade insulation (10cm) • Deck additional thermal insulation and new insulation against rainwater • Total accessibility • The building water-sewage, domestic water, restoration of ventilation and heating system complete replacement • coatings Key figures: Estimated number of beds: 69 Built area: 667m2 Built net floor area: 1,932 m2 Roof area: 712 m2 Front Surface: Number of 1355 m2 wards: 15 for replacement Number of windows: 89 pieces painted wall: 5043 m2 PVC sheeting: 724 m2 Gres porcelain tiles: 1148 m2 Oldalfalburkolat: 559 m2 building Employing the proposed works are primarily energy-related renovations, respectively. sanitary performed this context, the main tasks: • painted wall: 892m2 • flat roof insulation: 803m2 Key data: Gross floor area: 626m2 net floor area: 607m2 painted wall surface 892 m2 The works include the substitution is síküvegezés in the greenhouse's glass 10mm polycarbonate disk, will renovate the heating, water, sewage and electrical systems. Key Specifications: • Gross floor area: 233m2 • Net area: 195 m2 • for replacement glass surface: 171m2

Zalaegerszeg informational award

Zalaegerszeg Megyei Jogú Város Önkormányzata | Published June 17, 2015
Winner
Szabau Invest Kft.
cpvs
45212212

A contract to the "Zalaegerszeg, city beach, paddling pool construction and reconstruction of the environment" adopted by the construction work. The contractor is responsible for Zalaegerszeg, city beach, paddling pool construction and reconstruction work environment of snow March 2015, 15-06 working number by Indeco Arch Studio Ltd., General procurement documentation for construction plans and tender documents indicated below. Vizafogó statue in the middle of an existing pool will be moved to the pool axis of a built-in pedestal drinking fountain built. Architects working part: The pool also 1pc water gushing hedgehog, 3 pcs and more water water jet water gate will be installed. The dividing walls in galvanized steel legs raised partition system. New doors and windows, the door will be placed. The outdoor shower in the basin axis of the cross will be built on either side, the structure of polished glass-reinforced engineering plastic resin casing surrounded by flower shape formatted. The galvanized steel structures, shade structures and UV coated solar sail complete with rain-proof fabric. As in the shade structures are changing, powder-coated galvanized steel structures and UV solar sail complete with rain-proof fabric. The existing pool Vizafogó statue will be moved from the middle axis of the new pool. New interpretation of the statue and pedestal also serves the ivókútként padkaként, dribbling through the pedestal of the statue of the water. On the western side of the basin on both sides of the statue is made from our sun screening device. Structures Working part: Material: C30 / 37-16 / XV2 (H) Material: C30 / 37-16 / XV2 (H) Material: C25 / 30 - During opening breakdowns required 16 / XC1 Female / barrier-free toilet room to form 2 x LEIER MDA125- kerámiaköpenyes year bridging is installed. Building services working part: technological water requirements necessary to ensure the filling of the pool water output line is in connection with the plot takes place. The supply of domestic hot water needs is done by the existing water heater, which is connected to be built within the work area pool water engineering technology Registrar of the heat exchanger. The property has no stormwater network, so the network receives wastewater discharged into the pool of water. The toilet facilities are constructed new facilities. Building Electrical Work part: Under the new investment in the power grid will be expanded with the building of summer dressing rooms on the toilet, fund supply operation of the new boiler and water engineering systems. Garden Architecture Working part: Given the fact that during the execution tree planting is not possible, therefore, not subject to the public procurement only perform the tasks contained in the documents and gardening, planting shrubs and herbaceous plants, as well as irrigation for the installation works. Hydraulic engineering work for: the existing water conditions in the engineering system currently in place is not up, so after the breakdown will establish a new water system engineering. The pool water disinfection with chlorine, chlorine dioxide system works. The margin may only be used for the completion of works, necessary for the proper and safe use works against the value of the settlement. The level of assessed value below the amount of the reserve funding also includes the estimated value net 43,307,090 USD main parameters of the job, the volumes of detailed specifications in the tender documentation. Offer the Offeror must submit unpriced budget priced for proposals will be issued in the tender documents.
  • 1