Public tenders for electrical in Tarpa Hungary

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

Change No. 2 shoulder contract

Szatmárcseke Község Önkormányzata | Published November 12, 2014
Winner
Gyarmat Építő Szolgáltató és Kereskedelmi Kft
cpvs
45210000

The building has been renovated 260 m2. Building Expansion rate of 9 m2. Udvar-up innovation in the context of sidewalk and parking lot design is made with a 560 m2. The building in question will be performing two functions. The building has two main entrances, the building design will be developed relevant domestic and child clinic, nursing services. The load-bearing masonry building will be demolished according to the floor plan of the existing openings are befalazásra according to the floor plan. Floor of the building will be demolished. The shell of the building, sewer system also will be demolished. The building is the mechanical and electrical fittings, pipes, installed network demolished. Instead of advanced materials will be built again. The building will be demolished as a plug-glued one part of the building. All rooms have been designed office unit performing server function. Waiting room, working for social block, sick toilet, designed for the expected traffic, separately by gender, disabled toilet + bathroom + changing child. The ground floor will be built in the central warehouse, storage of hazardous waste. The premises flooring needs and the need to use the gap-free and ceramic tiles. In building construction, water channel classic hardware, fixtures. Water supplies are installed solar panels in order to bail out. Ventilation: complete the ventilation equipment and air ducts. Heating: complete the pipelines, fittings fittings, heat dissipators, wood gasification boiler). Electrical network, complete power system will be installed, wireless networks, distributors, fittings and fixtures (lights, sockets, switches, etc), and lightning arrester system. The parking structure is needed to service the property, you will ensure the planned construction of parking lots. The car parks are there will be a barrier-free parking.

No. 3. contract modification

Szatmárcseke Község Önkormányzata | Published November 28, 2014
Winner
Gyarmat Építő Szolgáltató és Kereskedelmi Kft
cpvs
45210000

The building has been renovated 260 m2. Building Expansion rate of 9 m2. Udvar-up innovation in the context of sidewalk and parking lot design is made with a 560 m2. The building in question will be performing two functions. The building has two main entrances, the building design will be developed relevant domestic and child clinic, nursing services. The load-bearing masonry building will be demolished according to the floor plan of the existing openings are befalazásra according to the floor plan. Floor of the building will be demolished. The shell of the building, sewer system also will be demolished. The building is the mechanical and electrical fittings, pipes, installed network demolished. Instead of advanced materials will be built again. The building will be demolished as a plug-glued one part of the building. All rooms have been designed office unit performing server function. Waiting room, working for social block, sick toilet, designed for the expected traffic, separately by gender, disabled toilet + bathroom + changing child. The ground floor will be built in the central warehouse, storage of hazardous waste. The premises flooring needs and the need to use the gap-free and ceramic tiles. In building construction, water channel classic hardware, fixtures. Water supplies are installed solar panels in order to bail out. Ventilation: complete the ventilation equipment and air ducts. Heating: complete the pipelines, fittings fittings, heat dissipators, wood gasification boiler) Power supply complete power system will be installed, wireless networks, distributors, fittings and fixtures (lights, sockets, switches, etc.), lightning and surge arrester system.. The parking structure is needed to service the property, you will ensure the planned construction of parking lots. The car parks are there will be a barrier-free parking.