Public tenders for electrical in Szolnok Hungary

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

Electricity

Szolnok Megyei Jogú Város Önkormányzata | Published November 21, 2015
Winner
MVM Partner Energiakereskedelmi Zrt.
cpvs
09310000

Institutional delivery contract for the transport of electricity Szolnok County Council and other entities electrical consumption points as scheduled without obligation. All of the contracting authority intends to conclude the institutions to ensure electricity supply based on the same criteria, electricity trading contracts.

Electricity

Víz- és Csatornaművek Koncessziós Zrt. Szolnok | Published December 15, 2015
cpvs
09310000

-

Electricity

Víz- és Csatornaművek Koncessziós ZRt. Szolnok | Published January 11, 2017
Winner
E- On Energiakereskedelmi Kft.
cpvs
09310000

01/01/2017 transport contract. 31/12/2017 0:00 PM. 24:00 up to a period of VCSM Plc. Szolnok electricity consumption points as scheduled without obligation.

Profiled and time-series (telemetry) in consumer locations, 01/01/2017. 0:00 pm, 31.12.2017. 24:00 (Contract period)

1. Number of profile-based consumer accounts 77 points (db).

2. Time Series (telemetry) Number of consumption points: 12 (db).

Contracted electricity quantity 9500 MWh (-30%).

1. Profile consumption-based accounting points: 1050 MWh (-30%).

2. Consumer finders points: 8450 MWh (-30%).

01/01/2017 transport contract. 31/12/2017 0:00 PM. 24:00 up to a period of VCSM Plc. Szolnok electricity consumption points as scheduled without obligation.

Profiled and time-series (telemetry) in consumer locations, 01/01/2017. 0:00 pm, 31.12.2017. 24:00 (contract period).

1. Number of profile-based consumer accounts 77 points (number);

2. Time Series (telemetry) Number of consumption points: 12 (db).

Contracted electricity quantity 9500 MWh (-30%).

1. Profile consumption-based accounting points: 1050 MWh (-30%).

2. Consumer finders points: 8450 MWh (-30%):

Electricity

Víz- és Csatornaművek Koncessziós Zrt. | Published October 19, 2016  -  Deadline November 2, 2016
cpvs
09310000

01/01/2017 transport contract. 31/12/2017 0:00 PM. 24:00 up to the period, the Company VCSM. Szolnok electricity consumption points as scheduled without obligation.

Electricity

Szolnok Megyei Jogú Város Önkormányzata | Published September 14, 2016  -  Deadline September 26, 2016
cpvs
09310000

Profiled and time-series (telemetry) in consumer locations, 11/01/2016. 00.00, 10.31.2017. 24:00 (contract period).

Electricity

Víz- és Csatornaművek Koncessziós Zrt., Szolnok | Published October 20, 2015  -  Deadline October 30, 2015
cpvs
09310000

Delivery contract for the transport of electricity on the Water and Sewer Works Concession Zrt. Szolnok electricity consumption points as scheduled without obligation.

Electricity

Szolnok Megyei Jogú Város Önkormányzata | Published September 12, 2015  -  Deadline September 18, 2015
cpvs
09310000

Institutional delivery contract for the transport of electricity Szolnok County Council and the other Contracting authorities electricity consumption points as scheduled without obligation. Contracting authority intends to conclude all the institutions to ensure electricity supply system on the same criteria, electricity trading contracts.

Sale and purchase agreement to acquire the subject of special fencing equipment.

Szolnoki Sportcentrum Nonprofit Kft. | Published May 18, 2015
Winner
PBT Hungary Kft.
cpvs
37400000

Sale and purchase agreement to acquire specialized fencing equipment. a) 12-piece scoring machine: dagger / epee / saber scoring, remote control, highlighter, battery, charger, carrying case b) 10 pieces mobilpást: vívópást aluminum segments. The piece consists of 17 mobilpást 1 meter X 1.5 meters wide, easy to fit elements, height 10 mm / battery. c) 24 pieces dobkábel: The drums include a 20-meter cables. d) four pieces of programmable electrical szúrópárna. (Wall or rack mount)

"Technical analysis and consultancy relating to buildings occupied by Jasz-Nagykun-Szolnok County Government Office, resulting in energy savings in investment projects for the preparation of care" - a statement of award

Jász-Nagykun-Szolnok Megyei Kormányhivatal | Published November 6, 2015
Winner
Energiacsapda Kft.
cpvs
71250000

Within EEOP 7.14.0 / 15 scheme implemented by the Government Offices and Departments 2014-2020 period, energy efficiency improvements in the preparation of the project entitled "Technical analysis and consultancy relating to buildings occupied by Jasz-Nagykun-Szolnok County Government Office, resulting in energy savings in investment projects for the preparation of care" RÉSZTELJESÍTENDŐ JOB POINTS 3.1. Technical survey of buildings - tracing data / transfer of geometric / structural data base - typical floor plans based on accurate presentation of the building envelope construction; - All facade drawings, engravings typical examination marking of the heated and unheated areas; - Structural layer of real estates, if available thermal transmittance (U value) survey; - Building structures survey: Facades (building structures status, building structures, links) roofs, flat roofs (condition, leaks, slopes correctness, layer feudal structure) of doors (condition, leaks, flow, location, solar access, type, orientation, size, number, glazing ratio shield structure) of all heated / unheated space separating wall, floor structures (stability, build-up, connection wall constructions) Mechanical / electrical / lighting survey - Identification / description of building systems: DHW system (type, capacity, circulation, condition, storage, operation times) Heating System (type, power, status, heating medium, distribution piping, insulation, heat rejection type and volume control mode, operation times) Cooling system (types of cooling system characteristic of regulation, uptime, operational experience) Ventilation systems (type, status, power, extraction types, ventilation panels, heating to cooling system connections of regulation) Other engineering - power systems, identifying areas of consumption; - At least visually documenting heating and cooling systems are supported beszabályozottsága photos; - Presentation of the electrical system: a. building electrical system (inspection, production, name of producer, type of energy (kWh / year), number of pieces, other data produced); b. electricity consumers: b.1. lighting: luminaires, performance, uptime B.2. high-power electrical items (kitchen appliances, refrigerators, computers, servers, mechanical components, pumps): performance, battery life is 3.2. Operating habits description - average energy consumption characteristics and operation of power systems; - Under-examining the issue of overheating, internal air temperature (winter and summer); Consumption data - When a meter performs several buildings and there is no other accurate method for determining the specific consumption per building, in case you have to give all the heated net floor area of ​​all buildings served by the particular meter. 3.4. Examination of protected historic building - Resolution to the effect that the audited building is under some kind of protected monuments (eg local, national defense, world heritage, historic environment.) Support: copy of the title deed, local regulation of declaring protected by law; RÉSZTELJESÍTENDŐ JOB POINT

Obtaining the framework EEOP 5.6.0 / E / 15 identification number of projects Geza X-ray equipment in Jasz-Nagykun-Szolnok County Hospital-Clinic for Hetényi - Information on the amendment of the contract

Jász-Nagykun-Szolnok Megyei Hetényi Géza Kórház-Rendelőintézet | Published January 8, 2016
Winner
Euromedic Technology Kft.
cpvs
33100000, 33111000, 33124000, 45315100, 45350000

X-ray equipment purchase contract of sale under the EEOP 5.6.0 / E / 15 project is the identification number of Geza Jasz-Nagykun-Szolnok County Hospital in Hetényi for. In transportation equipment: 3 C-arm surgical image intensifier 3 Direct Digital Mobile X-2 Floor Fixed X-ray tube direct digital X-2 remote-controlled scanning recording X-2 dental x-ray equipment with digitizer The contractor is also responsible for performing design tasks needed for equipment installation, including the dismantling and removal is also, in the case of digital imaging equipment to carry out adaptation to the PACS system, or the assets necessary to carry out the operation of the two-day teach-in of old equipment. The contractor shall also encompasses the operation of the X-ray equipment movements (electrical) energy consumption reference measurement of the existing condition, after startup and for 5 years once the annual energy consumption for operation of X-ray equipment (electrical) measurements, respectively. During 24 hours of measurement, under the same test portion, one test per min. Proof of a 15% reduction in levels of energy consumption, up to the end of the maintenance period (5 years) warranty and the end of the maintenance period (5 years) planned and preventive maintenance necessary for daily operation.

Bound Visigoth - Complex IV. - Information on contract modification

Közép-Tisza-vidéki Vízügyi Igazgatóság | Published February 13, 2015
Winner
VIZÉP-KÖR Kivitelező, Szolgáltató és Kereskedelmi Kft.;KÖTIVIÉP’B Közép-Tisza Vidéki Vízépítő és Telekommunikációs Kft.
cpvs
45240000, 45248000, 71322000

Of a contract under the EEOP 2.2.1 / 2F / 09-2011-0001 identification number, the application program "Complex Lake Tisza Project" was necessary Nagykunság main channel of art and design tasks of reconstruction works carried out on the basis of the FIDIC Red Book. EEOP-2.2.1 / 2F / 09-2011-0001 identification number, the application program "Complex Lake Tisza Project" was necessary Nagykunság main channel reconstruction works of art of planning and carrying out the tasks of the construction works on the basis of the FIDIC Red Book, the following principal amounts taking into account, in accordance with the tender documentation: Reconstruction of the main channel Nagykunsági works of art of the 14th c. Reconstruction of No. 31, art. 34. No objects reconstruction. reconstruction of objects No. 14. The reconstruction works of art Cell Shaped Stone cover 481 m2 of concrete tiles 435 m2 reinforced concrete 151.6 m3 of rock blasting 690 m3 3320 kg Gerebkötegek production, renovation 4168 kg of Sluice Structure Reconstruction of railway based on 13,000 kg Electrical works 1 Engineering manual technical design 1 Drainage 1 31st c. reconstruction of objects in concrete tiles 1033 m2 reinforced concrete 154 m3 of rock blasting 385 m3 2080 kg Gerebkötegek production, renovation 1280 kg of Sluice Structure Reconstruction improving 9,300 kg Electrical works one piece of concrete surface on the basis of 751 m2 Engineering Manual railway technical design 1 Drainage 1 34th c. reconstruction of objects Earthworks (humus) 49 m3 of concrete tiles 1201 m2 reinforced concrete 167 m3 of rock blasting 8 m3 1800 kg Gerebkötegek production, renovation 2888 kg of Sluice Structure Reconstruction improve 12,000 kg Electrical works one piece of concrete surface 1350 m2 Drainage 1 The total amount and technical description of the procurement will be explained in further detail in the documentation. This procurement procedure is available in respect of the 7100-15 / 2010th There are bound by registration number KTVF water right permit. 15 right) government decree for content. With Regulation 15), Govt. Is required to be carried out properly. The contractor shall be responsible for preparing and obtaining operating permits on behalf of the contracting authority so that the necessary technical work done by the contractor, while the cost of the licensing entity bears the as-built plans. During the term of the contract, damage mitigation works for the inland ice, drought and other environmental damage in the work area must be carried out by the contractor handed. In the inland defense contractor is required to perform protective functions in the work area and work in the channels, main channels in the channel, the main channel and ensure proper operation of normal water supply capacity.

Changes in the structure of Geza Jasz-Nagykun-Szolnok County Hetényi hospitals clinics "are c.TIOP-2.2.4-09 / 1-2010-0010 project and construction work on the building B1 a ground floor - contract modification

Jász-Nagykun-Szolnok Megyei Hetényi Géza Kórház-Rendelőintézet | Published July 24, 2015
Winner
Swietelsky Magyarország Kft.
cpvs
45000000, 45110000, 45215100, 45221250, 45223200, 45261400, 45262700, 45262000, 45300000, 45330000, 45331000, 45310000, 45313000, 45343200, 45350000, 45410000, 45420000, 45430000, 45442100

The "Structure Change of Geza Jasz-Nagykun-Szolnok County Hetényi hospitals clinics" of projects marked SIOP-2.2.4-09 / 1-2010-0010 identification in respect of the construction and related demolition, renovation works to be performed are as follows: buildings to be demolished : Blood Transfusion Station building, building Communicable diseases, Economic Office building, electrical fitting shop building, Administration building, building Psychiatry, Old Boiler House building Net area: 6,696 m2. Built and renovated net floor area: B1 a 1-2 floor building: 686.19 m 2 Building C: 12,077.86 m2 OVSZ part of the building: 471.00 m2 Total: 13,235.05 m2 building B1a ground floor: 499,16m2

"In the case of complex examination of regenerative energy recovery systems development and application of a pure electric vehicle and drive" PIAC_13

Alfa Javító Szolgáltató és Kereskedelmi Kft. | Published November 13, 2014
Winner
E-Wechicle Group KonzorciumSuite 410, Cotton Exchange Bixteth Street, MerseysideLiverpool L3 9LQ
cpvs
73110000, 73120000

Agency contract "Complex regenerative energy recovery systems Developed and examine its application.

The "Jászberényi District Court 5100 Jászberény, the Lehel preparation and execution of building number 15 space heater under the control of export plans of modernization" - informational award notice

Szolnoki Törvényszék | Published December 30, 2015
Winner
Király 2008 Csőszerelő Szolgáltató Kft
cpvs
45331110, 71321200

The Jászberényi District Court 5100 Jászberény, the Lehel preparation and execution, total gross 2,318 m2 floor area of ​​the building under control tér 15. Heating modernization construction drawing: Heat-core equipment radiators and piping replacement while continuing to guarantee the activities taking place in the building and related building electrical, master builder and Finishing work together: • After the decommissioning of the existing gas boiler installation kéménybekötött 6 x 4 x condensing gas boiler, mixed produced water heating circuits with motorized valves outside temperature szabályozásúvá to transform the present system without regulation; • After the old boiler chimneys (6) coaxial demolish the construction of flue gas outlets (4); • demolition of the existing cast iron radiators (104) and heating wiring (320 m) of new pipeline construction (about 344 m) and a modern steel radiators (about 90 pieces of different sizes) placement of thermostats, termofejekkel with restrictive and anti-theft spacer.

Our Government House Window Steering JNSZ 5300 Karcag, Kossuth tér 1 under "SIOP 3.3.1 - creating equal access to public services - supply of construction tasks related to accessibility tender"

Jász-Nagykun-Szolnok Megyei Kormányhivatal | Published January 11, 2016
Winner
Kurucz István Attila
cpvs
45000000, 45453100, 45110000, 45331000, 45310000

The Government window including the building of Karcag, Kossuth tér 1. - (hrsz: 7) located in the City Hall building during which the subject-storey, gabled roofs, masonry design .. The present public procurement procedure, the Government Window offices of interior transformation and construction work on Accessibility. The planned intervention is affected by structural transformation in which the premises will be converted to open up a large customer area. In an internal transformation within the building (212.65 m2) Furnishing of the client space, supporting office spaces vary in appropriate uniform corporate image and customer service areas are constructed space. The plan includes an elevator building and sanitary facilities Disabled, which is jointly used with the Kormányablakkal. The renovation of the corridor is not part of the proposed project, however, demolition and corridors repainting the customer space to be kept front-side 150 cm tall ceramic tiles required, and running through the electrical cable routing rethinking Hide suggested .. The local government planned an initial investment of over the town hall building accessibility of replacing the flooring also planned placement of the leading bands. During construction, the existing water connection only candidate for Free plan and furniture elements should be added. Obtaining custom made furniture is not part of this procurement procedure. The contractor responsible for preparing as-built design documentation in 5 copies in paper copies and one CD / DVD format. The construction materials have to be built AWU licensed / CE mark / European Technical Approval (depending on model), as well as prior to installation contractor to check your installation location, size and construction plans. The deviation from the implementation plan to be approved by the designer and the technical supervisor can happen, for works which do not affect the construction permit. Guidance on the Regulation, if, under a construction product is not available for the construction market or in substitution for some other reason (eg. Too expensive or is better) is the builder and the designer agree, the required technical capacity to fulfill any of the other building product can be installed. The construction authorization is required, the number of building permits: BK-05D / 008 / 1386-9 / 2013th

EEOP 5.6.0 / 12-2013-0008 identification number '' Jasz-Nagykun-Szolnok County Government Office building in 5100 Jaszbereny, Jasz summer residence during the 16th street energy efficiency modernization '' - a statement amending the contract

Jász-Nagykun-Szolnok Megyei Kormányhivatal | Published October 7, 2015
Winner
Pócs és Társa Építőipari Szolgáltató és Kereskedelmi Kft.
cpvs
45321000, 45443000, 44221000, 45261400, 45350000, 45310000, 45312310

Building Jasz-Nagykun-Szolnok County Government Office 5100 Jaszbereny, Jasz summer residence street number 16 below the modernization of energy efficiency renovations SUMMARY OF THE PLANNED BUILDING: - Full facade insulation, plaster Making - Front window replacement (triple insulating glazing); - Attic Ceiling thermal insulation; - Mechanical conversion, hydronic balancing - Lightning protection proposed renewal: the existing slab to get to 20 cm heat insulation. All doors and windows must be replaced, at least 5-chamber plastic frame and sash, as well as 4-12-4-12-4AG mm, 2xLOW E-COAT, triple insulation glazing is installed. The insulating properties requirements: For Windows and doors: U (complete system) <1.1 2 w m2 * k, ug Electrical installation work of the existing lightning protection lightning protection demolition and refitting.

SZMJV_Csillag_táj.elj.eredm

Szolnok Megyei Jogú Város Önkormányzata | Published September 23, 2015
Winner
R + K 2000 Építőipari, Szolgáltató és Kereskedelmi Korlátolt Felelősségű Társaság
cpvs
45200000

A contract TÁMOP-5.3.6-11 / 1-2012-0057 identification number, "Learning and Community Development - Providing access to complex human services in Szolnok" to perform construction tasks required within the framework of the project entitled "Support Service Star" reality. Supply of construction tasks required within the framework of the project entitled "Support Service Star" in the light of the implementation of the - The contractor is responsible for SROP-5.3.6-11 / 1-2012-0057 identification number, "Providing access to complex human services and community development in Szolnok Learning" as specified in tender documentation: 6 container available, installing a total of 81.68 m2 useful floor container house, taking into account the following main quantities, tender documents as defined by: - ​​the combined receiving container based on the static planning foundation (6.58 m3) - utility connections to build Within the boundary (water, sewage, electricity), - construction of pipelines engineering (31.0 fm) - powering electrical construction (36.0 fm) - Development of paved road link between road and land (14.0 m2), - indoor parking and road design (129.59 m2) - container around the joint design of concrete pavement and ramps (41,25 m2) - steel container ensemble semi-pitched roof construction (88.84 m2), - the development of storm water drainage (14.70 m + 5.5 fm) - drótfonatos boundary fence construction, passenger and vehicle gate design (94.0 fm). It does not provide a margin contracting.

Government Window JN-Szolnok County Government Office 5300 Karcag, Kossuth tér 1 under "SIOP 3.3.1 - creating equal access to public services - supply of construction tasks related to accessibility tender"

Jász-Nagykun-Szolnok Megyei Kormányhivatal | Published September 2, 2015
Winner
Kurucz István Attila
cpvs
45000000, 45453100, 45110000, 45331000, 45310000

The Government window including the building of Karcag, Kossuth tér 1. - (hrsz: 7) located in the City Hall building during which the subject-storey, gabled roofs, masonry design .. The present public procurement procedure, the Government Window offices of interior transformation and construction work on Accessibility. The planned intervention is affected by structural transformation in which the premises will be converted to open up a large customer area. In an internal transformation within the building (212.65 m2) Furnishing of the client space, supporting office spaces vary in appropriate uniform corporate image and customer service areas are constructed space. The plan includes an elevator building and sanitary facilities Disabled, which is jointly used with the Kormányablakkal. The renovation of the corridor is not part of the proposed project, however, demolition and corridors repainting the customer space to be kept front-side 150 cm tall ceramic tiles required, and running through the electrical cable routing rethinking Hide suggested .. The local government planned an initial investment of over the town hall building accessibility of replacing the flooring also planned placement of the leading bands. During construction, the existing water connection only candidate for Free plan and furniture elements should be added. Obtaining custom made furniture is not part of this procurement procedure. The contractor responsible for preparing as-built design documentation in 5 copies in paper copies and one CD / DVD format. The construction materials have to be built AWU licensed / CE mark / European Technical Approval (depending on model), as well as prior to installation contractor to check your installation location, size and construction plans. The deviation from the implementation plan to be approved by the designer and the technical supervisor can happen, for works which do not affect the construction permit. Guidance on the Regulation, if, under a construction product is not available for the construction market or in substitution for some other reason (eg. Too expensive or is better) is the builder and the designer agree, the required technical capacity to fulfill any of the other building product can be installed. The construction authorization is required, the number of building permits: BK-05D / 008 / 1386-9 / 2013th

Within EEOP 5.6.0 / 12-2013-0008 identification number of projects in the "Jasz-Nagykun-Szolnok County Government Office building in 5100 Jaszbereny, Jasz summer residence during the 16th street Energy Efficiency Modernization"

Jász-Nagykun-Szolnok Megyei Kormányhivatal | Published August 10, 2015
Winner
Pócs és Társa Építőipari Szolgáltató és Kereskedelmi Kft.
cpvs
45321000, 45443000, 44221000, 45261400, 45350000, 45310000, 45312310

Building Jasz-Nagykun-Szolnok County Government Office 5100 Jaszbereny, Jasz summer residence street below 16. The modernization of the energy-efficiency renovation SUMMARY OF PLANNED BUILDING: - Full facade insulation, plaster Making - Front window replacement (triple insulating glazing); - Attic ceiling heat insulation; - Mechanical conversion, hydronic balancing - Lightning protection proposed renewal: the existing slab to get to 20 cm heat insulation. All doors and windows must be replaced, at least 5-chamber plastic frame and sash, as well as 4-12-4-12-4AG mm, 2xLOW E-COAT, triple insulation glazing is installed. The insulating properties requirements: For Windows and doors: U (complete system) <1.1 w m2 k *, ug <0.9 when exchanging * ka internal doors and windows damaged parts must be repaired bagged plaster rendering, glettelni followed dispersion paint to two coats. during the first works replace then you have prepare thermal insulation. care should taken in cases of injury-free! a common mistake is need repair design specification: facade poor insulation capacity, replacement necessary. external brick walls insulated. zárófödémet (attic floor) also interior wall faded, dirty, new would justified. heat smoke evacuation staircases resolved. planned transformation engineering operation after investment level as gas boiler sufficient, while other serves backup. (switching between by hand.) under project, spinal cord heating systems tuning circuits takes place. Electrical installation work of the existing lightning protection lightning protection breakdown or reinstalling.

Within EEOP 5.6.0 / 12-2013-0008 identification number of projects in the "Jasz-Nagykun-Szolnok County Government Office 5000 Szolnok, Kossuth Lajos utca 6-8. under the building code for energy efficiency modernization "- informational award notice

Jász-Nagykun-Szolnok Megyei Kormányhivatal | Published September 2, 2015
Winner
Pallai Project Egyéni Cég
cpvs
45321000, 45443000, 44221000, 45261400, 45261310, 45310000, 45312310

Jasz-Nagykun-Szolnok County Government Office 5000 Szolnok, Kossuth Lajos utca 6-8. under the building code for energy efficiency modernization renovation SUMMARY OF THE PLANNED BUILDING: - Full facade insulation, plaster Making - Front window replacement (triple insulating glazing); - Final slab thermal insulation; - Rainwater insulation on flat roofs - the exchange Attikabádogozás - Lightning protection proposed renewal: the staircase area of ​​18 cm thick insulation installation can not be achieved by the former architectural façade design, so in concrete blade walls between the glass block skylight panels are 2 cm plastered mineral fiber insulation, which is the remaining üvegtéglára 2 cm thick befordítanak. On the south wall of fire to the building basement and ground floor of the adjacent property line superimposed to a garage, so this part of the garage height connection and insulation lagging behind because of physical obstacles collision. The staircase of glass-brick walls leaving in its current form and structure, the lower roll nyílásszerkezeten üvegtéglához connecting to existing X-ray-a thermal insulation glazing 2 is changed, the new seals rubber seals can be replaced. The thermal insulation qualities provisions: - in the case of plastic windows and doors: U (complete system) <1.1 w m2 k *, ug <0.6 * - aluminium entrance door for u (complete system) <1.4 must when exchanging ka doors and interior plaster damaged parts should be improved rendering bag, glettelni disperse dyes have to paint two coats. during the first works replace windows then you need thermal insulation made. care taken in cases of injury-free! a common mistake is repair structures description: front poor capacity, replacement necessary. external walls are insulated façade, after demolition existing insulation. roof slab fitted with new flat rainwater old, so waterproofing construction warranted. some areas inner wall mennyezetfestések faded, dirty, signs indicating leaks can discovered, would justified. Electrical installation work of the existing lightning protection lightning protection demolition and refitting.