Public tenders for electrical in Szentendre Hungary

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

Electricity

Magyar Alkotóművészeti Közhasznú Nonprofit Korlátolt Felelősségű Társaság | Published February 16, 2017
Winner
ELMŰ-ÉMÁSZ Energiakereskedő Kft.
cpvs
09310000

within the framework of a contract of sale for cultural institutions to obtain electricity under the control of the Ministry of Human Resources for the 2017 year.

for cultural institutions to obtain electricity under the control of the Ministry of Human Resources in 2017, the year the acquisition of the Hungarian electricity transmission network is constantly available access points to the use of appropriate quality characteristics of electricity (commercial relationship with purchase) of 01.01.2017. (00:00) - 31.12.2017. for the period (24:00).

The number of institutions participating in public procurement: 23 pcs.

MEF: 23 134 1121 MWh.

The contracting a specified amount in a positive direction by 20% surcharge-free variations.

· 376 technical point of use by content. The number of sites use + 5% change.

The amount was specified on the basis of average consumption according to the announcement, in the state of actual use may be different, so the contracting authority and the organizations it represents may vary without a specified quantity of + 20% in addition to tapping kötbértől, in addition offtakes contract price required to pay the merchant.

Detailed specifications for the procurement subject matter of the RFP documentation.

Electricity

Magyar Alkotóművészeti Közhasznú Nonprofit Korlátolt Felelősségű Társaság | Published November 25, 2016  -  Deadline December 12, 2016
cpvs
09310000

within the framework of a contract of sale for cultural institutions to obtain electricity under the control of the Ministry of Human Resources for the 2017 year.

for cultural institutions to obtain electricity under the control of the Ministry of Human Resources in 2017, the year the acquisition of the Hungarian electricity transmission network is constantly available access points to the use of appropriate quality characteristics of electricity (commercial relationship with purchase) of 01.01.2017. (00:00) - 31.12.2017. for the period (24:00).

The number of institutions participating in public procurement: 23 pcs.

MEF: 23 134 1121 MWh.

The contracting a specified amount in a positive direction by 20% surcharge-free variations.

The number of sites use + 5% change.

The amount was specified on the basis of average consumption according to the announcement, in the state of actual use may be different, so the contracting authority and the organizations it represents a specified quantity of free + 20% in addition to tapping kötbértől may differ, in addition offtakes contract price required to pay the merchant.

II.2.4) Description of the procurement:

for cultural institutions to obtain electricity under the control of the Ministry of Human Resources in 2017, the year the acquisition of the Hungarian electricity transmission network is constantly available access points to the use of appropriate quality characteristics of electricity (commercial relationship with purchase) of 01.01.2017. (00:00) - 31.12.2017. for the period (24:00).

The number of institutions participating in public procurement: 23 pcs.

MEF: 23 134 1121 MWh.

The contracting a specified amount in a positive direction by 20% surcharge-free variations.

The number of sites use + 5% change.

The amount was specified on the basis of average consumption according to the announcement, in the state of actual use may be different, so the contracting authority and the organizations it represents may vary without a specified quantity of + 20% in addition to tapping kötbértől, in addition offtakes contract price required to pay the merchant.

If bidders do not have the required license bid is invalid.

Contracting points out that 23 institutions listed as contracting, but some name / status / location on changes to 1.1.2017. (based on 1312/2016. (VI.13.) Government. Six.), Which reserves the right in case of changes in AK participating authorized institutions, and changes to the place of consumption.

Detailed specifications for the procurement subject matter of the RFP documentation.

Electricity

Magyar Alkotóművészeti Közhasznú Nonprofit Korlátolt Felelősségű Társaság | Published October 31, 2015  -  Deadline November 3, 2015
cpvs
09310000

Villamos energia

Electricity

MANK – Magyar Alkotóművészeti Közhasznú Nonprofit Korlátolt Felelősségű Társaság | Published September 28, 2017  -  Deadline October 9, 2017
cpvs
09310000

Acquisition of Electricity for Purchase of Electricity for 2018 by the Ministry of Human Resources under a sales contract.

Electricity

Magyar Alkotóművészeti Közhasznú Nonprofit Korlátolt Felelősségű Társaság | Published October 17, 2015  -  Deadline October 23, 2015
cpvs
09310000

Connection with the acquisition of electric power purchase and sale agreement for the year 2016.

Electricity

Szentendre Város Önkormányzata | Published December 12, 2015
Winner
MVM Partner Energiakereskedelmi Zártkörűen Működő Részvénytársaság
cpvs
09310000

Purchases of electricity in Szentendre 01.01.2016., 00:00 CET within the framework of a contract of sale for 31.12 24:00 CET 2016 period.

Electricity

Magyar Alkotóművészeti Közhasznú Nonprofit Korlátolt Felelősségű Társaság | Published January 16, 2016
Winner
Magyar Áramszolgáltató Kft.
cpvs
09310000

Electricity sales contract contracting authorities listed in Annex invitation to the opening of A. IV) for the acquisition of the Hungarian electricity transmission network is constantly available, use a local connection characteristics of suitable quality electricity (for the purchase of commercial relationship) 01/01/2016 (0:00 that does not include the context, full board without scheduling obligation based power purchase agreement for the period) and 12.31.2016 (24:00) system includes the settlement of charges (the system usage fees directly to the network licensees are validated against contracting with). MEF 21 614.745 MWh. The number of consumer sites (POD): 333 pcs. The number of participating in public procurement institutions: 23 pcs.

Electricity

Szentendre Város Önkormányzata | Published October 3, 2015  -  Deadline November 16, 2015
cpvs
09310000

Purchases of electricity in Szentendre 01/01/2016. 12/31 00:00 CET within the framework of a contract of sale for the period 2016 to 24:00 CET.

Electricity

Magyar Alkotóművészeti Közhasznú Nonprofit Korlátolt Felelősségű Társaság | Published April 23, 2015
Winner
Budapesti Elektromos Művek Nyrt.
cpvs
09310000

Purchases of electricity contracting year 2015, as part of purchase contracts listed in the invitation to tender I.1) and Annex A of Annex IV) for the purchase of the Hungarian electricity transmission network is constantly available, the use of appropriate quality characteristics of the local connection and power (commercial relationship to purchase) 01.01.2015 (0:00) - which does not include the context of full supply without electricity, scheduling commitments for the period 31.12.2015 (24:00) contract of sale system charges accounts (the system charges the network licensees enforced directly against contracting with). MEF: Number 19.125 GWh consumption locations (POD): The number of 266 participants in the procurement institutions: 21 pcs.

Purchase of electricity in the year 2015.

Magyar Alkotóművészeti Közhasznú Nonprofit Korlátolt Felelősségű Társaság | Published October 2, 2014  -  Deadline November 14, 2014
cpvs
09310000

The context of the purchase of electricity purchase contract year 2015.

Purchase of Electricity and Pomáz Szentendre.

Városi Szolgáltató Zrt. | Published October 2, 2014  -  Deadline November 17, 2014
cpvs
09310000

Purchase of Electricity and Szentendre Pomáz 2015 00:00 CET 01.01 - 31.12 under the delivery contract for the period 2015 24:00 CET.

"Czóbel Museum Renovation"

Ferenczy Múzeum | Published October 7, 2015
Winner
KŐ-MED Építő és Díszítő Korlátolt Felelősségű Társaság
cpvs
45262690, 45310000

Contractor shall supply the Szentendre Czóbel Museum Renovation construction tasks of construction building usable area: Ground floor: 253.35 m2 basement: 44.71 m2 supply of architectural and structural discipline-specific building-construction tasks - necessary demolition work - roof and roof renovation - existing doors and windows renovation, installation of new windows - foundation reinforcement - Renovation of the yard drainage system - street entrance staircase - improving internal linings renovation of the building electrical supply industry-specific construction tasks in normal and stable power system, distribution system renovation, lighting and capping network renovation of wiring loads (lighting, heating) placing , fire alarm systems, presence detection system design of the available gross margin rate 40.000.000.- Ft. Detailed conditions contained in the tender documents.

Construction Szentendre suburban railway underpass renewal and modernization results

Szentendre Város Önkormányzata | Published November 16, 2015
Winner
TÉR Kivitelező Kft
cpvs
45000000

Szentendre suburban railway underpass renewal and modernization construction of Planning area: The planning area directly to the south side of the underpass and 2:55 m, 3:00 m north side bar. Applied Materials: Stairs, ramps: If the load carrying capability inadequate 15 cm thick new World Cup. stair structure is produced. The stairs and ramps get busy ramp surface white anti-slip coating - on the basis of advice from the manufacturer Mapei Parking System HE coating. Floor surface: The surface must be divided into visual layout of the plans. After Cost-effectiveness should be considered in terms of the current cleaning and surface preparation advice from the manufacturer on the basis of the entire surface using Mapecoat Mapei TNS Urban white. Surface sidewalk: Non-slip surface broom secure, highly wear-resistant concrete, equal to the underpass white coating of surface and color. Handrails, railings, information boards: The surfaces are fitted with anti-graffiti coating. Walls, wall coverings: The surfaces are fitted with anti-graffiti coating. On the basis of advice from Mapei company because of cracks in the surface MAPEI Elastocolor Rasante SF proposed deal with Elastocolor Net Elastocolor Pitturával and colored. Ceiling: The existing structure 100x100x3 mm hollow sections in galvanized steel electrical conduit and fixture and protective cover assembly is made. Based on preliminary discussions of the products used for side wall can be used here as well. Mapi Wallgard Anti Graffiti Barrier. Lighting: The electrical wires beneath the hollow sections, are protected from those leading. It is important to note that the original concept is that every new structure - floors, ceilings, stairs, railing ... - was the same color fehérbetonból designed two types of textures: the walking surfaces broom secure surface, non-slip, high abrasion resistance fehérbetonnal, on a vertical surface mirror-smooth surface. In order to achieve the appropriate homogeneous overall picture and color quality for all surface and surface samples must be presented to and approved by the designer during construction.

The Galyatetői Creative House Renovation

Magyar Alkotóművészeti Közhasznú Nonprofit Korlátolt Felelősségű Társaság | Published October 7, 2015
Winner
ASTON CONSTRUCTION Építőipari és Szolgáltató Kft.
cpvs
45200000

Design: • Preparation of detailed design documentation. Architecture, building engineering, building electricity, environmental planning: • basement renovation, new doors, female, floor and side villages tuning of the wall has dried promote légpórusos plaster • in some rooms establishment of an independent wet rooms • office space to expand, creating new door installation • mechanical area of ​​the office at the back, • foreground slight expansion, creating new dividing replacement installation • Replacement of toilet room • Expansion chamber demolition, window increasing • façade windows • New internal doors • ceramic tiles • floor coverings • Reconstruction walls, ceilings, plastering and painting • roof thermal insulation • New heating build boilers and Review of indirect-fired boiler • Water-sewer system renovation, new furniture and wireless network • electrical system • drainage design: rainfall canal construction, infiltration creation, building around sidewalks rebuilding yard • building around environmental settlement building floor area in total: 163.95 m 2 Garden area total: 2,699 m2

Vujicsics Tihamér Music School (Szentendre, Danube Promenade 16) Roof Repair and Overhaul safe escape route design and construction craftsmanship

Szentendre Város Önkormányzata | Published July 29, 2015
cpvs
45000000

Szentendre Danube Promenade No 16. The building involved rebuilding the main parameters: Land u. 1815 Installation Mode: The building consists of free-standing importance in the areas of Monuments, not monuments, Szentendre Hesed and architectural value Regulatory Plan under the Local Defence classifies the building. Building levels: basement (268.36 m2) floor (249.65 m2) 1st floor (243.72) second floor (172.9m2) layout Land area: construction plans and made part of the budget documentation Based on 1314 m2 proposals that include building and strengthening work on the renovation and replacement of the roof covering, as well as escape routes. The present proposals, as envisaged in the plans - a part - it contains the pace. These works are as follows: Note: At this rate the "dome" structure of the reconstruction is realized. After exploring the need for funds after confirmation by the fund over the relevant sections of the floor slab above the roof structure after conversion of a World Cup. It is tying drive existing wood floor structure. The above has been adjusted to the electrical and mechanical design as well.

City surveillance system expansion results

Szentendre Város Önkormányzata | Published July 24, 2015
Winner
"Multi Alarm" Biztonságtechnikai, Fejlesztő, Kereskedelmi és Szolgáltató Zártkörűen Működő Részvénytársaság
cpvs
35125300, 35125000

BACKGROUND expansion of urban surveillance system architecture of the system should be based on the tender documentation. PLANNING APPROVAL In addition, the construction phase of full implementation, commissioning, preparation of as-built documentation and training of the operating personnel. SYSTEM DESCRIPTION There are 32 pieces of surveillance cameras operating in the system. Bidder should cost up every venue in terms of cameras, fittings, power and wireless networks required for deployment. You need to build an additional workstation in the observation room. The end points must be connected to the transmission grid. INSTALLATION LOCATIONS Szentendre, Railway villas - Spar parking on street Dome Camera Szentendre, Szentlászlói street - Church Street public space a fixed camera Szentendre, gooseberry road on street fixed camera Szentendre, Peach road - Strawberry Street public space a fixed camera in the call OPERATOR REQUIREMENTS LIST AND ITS compliance with the system will be key components: - expansion of the Central Monitoring System 1 NVR and 1 client station by building - Installation of Camera endpoints based on specified criteria - construction of transmission network Wireless Technology Requirements opposite the central elements of the work station must be ergonomically suitable for 12-hour continuous work. The surveillance software upgrade is required to receive adequate The notice must be capable cameras. The required storage capacity must be chosen so that the legislation can ensure adequate recording time in eight days to provide cameras to be expanded. Technical Requirements against the cameras used in lux light sensitivity should be at least 0:07. The lux light sensitivity should be at least 0:05. Power The Power cabling design and conduct of the authorization procedure dealt with by the contractor. Technical Requirements against the transmission network, the transmission network must be designed to obtain the surveillance system signs to the center of the camera. The offer includes the necessary licensure population. The radio transmission network must provide 98% uptime. The wireless network required safety elements: - Password protection programming interface - IP address filtering for remote access - for MAC-level authentication AP and client - using WPA2-PSK encryption Bidder is responsible for power transmission components of energy supply in licensing and the measured or unmeasured electrical Switching network. Helpdesk

"The Ferenczy Museum of Szentendre heating modernization construction of a heat pump system - CHOP 3.3.3-11-2011-0025 - works"

Ferenczy Múzeum | Published May 20, 2015
cpvs
45112000, 45200000, 45350000, 45331000

The Ferenczy Museum, 1052/1 hrsz.-U geothermal investment in 2000 Szentendre, Kossuth Lajos utca 5 of 69 kW heating capacity during heat pump system is designed. The system comprises: Geothermal heat pump 1; 18 pieces of vertical ground probes; Additional items (hot water tank, circulating pumps, controls, etc). geothermal heat pump is designed for medium and high temperature level is equipped with a compressor, it allows the economical application. The IVT Greenline D70 type of investment - will be applied to a heat pump - or equivalent. Probe according to their placement on the layout plan 2000 Szentendre, No. 1 Roman rampart public. , hrsz. property during 1053-U is going to happen. As indicated in the site plan 100 m deep, 150 mm diameter holes 18 pieces, each 7.0 meters in distance are made. Collector holes deepening performed hydraulic drilling equipment. The holes will be built 40x3,7 mm PE100 pipe single collector loop, which approx. Base temperature of 12 ° C using the transfer medium circulates through the loop pipeline here. The loops are surrounded by a special insulation slurry in the wellbore. The horizontal section of vertical probes bind manifold, and connected to the primary side of the heat center heat pump. The heat pump is used only for electrical power, air pollution, so the operation runs. The heat pumps are sound insulated, so noise is minimal. Provided care in the preparation of the necessary legislation for the holes drilling mud proper storage, handling, disposal of any surplus. Detailed conditions contained in the tender documents.

Members buds Street Nursery (2000 Szentendre, Bimbo u. 8-10.) Modernization of the energy complex construction craftsmanship

Szentendre Város Önkormányzata | Published May 27, 2015
Winner
ARCHIBONA Kft
cpvs
45000000

8-10.) Complex energy modernization of building construction contract for subjects 8-10.) The construction of complex energy modernization of building renovation aimed primarily at improved thermal insulation of the outer structure, as well as modern and innovative architectural solutions for producing renewable energy, reducing CO2 emissions by architectural, engineering and it includes electrical solutions. The upgrade affects the outer parts of the building, the interior parts - except for the electrical work - remain intact. (Plaster coverings, heating system, etc.). These succinctly: The outer walls are given additional thermal insulation, windows and doors of the existing outdated same place Subsequent heat and electricity-generating solar panels are constructed. The tin structures are renewed. Since the bridge structure remains intact, so no building permit obligation von behind. The southern facade in front of the ground floor and second-floor windows of employing 3-aisle structural shell as a so-called two-stage high. "Klímafal" is that collects solar energy in winter, all the windows in the south facade exterior aluminum blinds get blind. The western wall of the building next to the exit to the yard so-called 2x3 meters. green paneled facade is made by employers heat exchanger ventilation fans will be built in order to better ventilation. It is an aesthetic space stone instead of concrete sidewalks around the building. The north terrace on the ground floor will also get a new layer order, where water and heat insulation will be adequate. The part of the boiler room and cellar. Ensuite hőszegetelt the warehouse can get the existing windows, pierced fémajtókra the current existing, recently replaced the combustion turbo intake of fresh air from the outside due to boiler is no longer needed. Will be demolished on the west side of the building has been disused high steel chimney. The interior spaces will be replaced with luminaires using LEDs are világószerkezetei. All these construction changes do not entail authorization. Partial reconstruction - structures Solutions: Foundations of the foundation is not affected by the renovation. Vertical load-bearing structure of the existing static vertical load-bearing structures are not affected by the renovation. Here, the planned parapetfalak 25cm YTONG P4 this are the new windows it. Northern longitudinal side of the balcony below the YTONG wall with 2 steel beams I220 challenge made kiváltásról detailed description of the structural plans. The walls of the Dryvit 3cm layer remains. The basement ceiling slabs above the ground floor and are not affected by the renovation. The lintels lintels are not affected by the renovation. Wreaths wreaths does not affect the existing renovation. Partitions Partitions are not affected by the renovation. Roof of the building north-south central axis of the west, insulated floor space of the existing bituminous waterproofing central axis east of the thermal insulation of new waterproofing slope of 1% in the same direction as introduces the eaves on the east side foil sheets of rain water into the PVC waterproofing layer to glue at least 10cm inch range. The parapets will be glued to the edge of line tin foil structure. The layer thickness should not be too large, so the bottom is almost twice as polystyrene pur foam insulation thermal insulation capacity, 5cm for polystyrene and PVC slope identical to the existing slope of the roof edges dropper solution. The exception under the form of doors on the north terrace kisbelmagasságú, only accessible from the courtyard steel metal warehouse door. (See plans) The surface is powder coated in any other insulated plastic doors and windows insulated glazed-a 2 layers. (Requirements:. Uw = 1.3 W / m2K, glazing Ug = 1.0 W / m2K The outer side of the consignation anthracite colors, golden oak wood decor foil inside of the windows above the first floor staircase 70cm high with the exception of plastic windows, armrest aranytörgy dekorfóliás made. The doors and windows after behelyzésük be wrapped around the water and air tightness in order to falcsatlakozásoknál EPDM foil. coverings The new kava plaster and in the same way in wet places kerámiaburkolata, if possible, the same type of ceramic, such as the original, or your best like. The upstairs built terrace associated laminate employing parquet floor of the built-in balcony floor height of the two casing at the junction enclosure relay the floor with colored accommodate the lam. Parquet. Before needed an external base of the outer bottom wall plaster spalling repair the insulation. Exterior cladding, heat insulation Where there is an existing Dryvit 3cm, there is an exception at 10cm EPS

DDOP framework 2.1.1 / B-12-2012-0015 identification number of projects in Pecs Royal Serbian Orthodox Church and the Regional Centre for Religious Art Collection the renovation, expansion and construction of the chapel and bell tower - No. 1. contract modification

Budai Szerb Ortodox Egyházmegye | Published February 25, 2015
Winner
BRANAU ÉPÍTŐIPARI KFT.
cpvs
45453100, 45232151, 45262690, 45311200, 45331100, 45321000, 45422100

DDOP framework 2.1.1 / B-12-2012-0015 identification number of projects in Pecs Royal Serbian Orthodox Church and the Regional Centre for Religious Art Collection the renovation, expansion and construction of the chapel and bell tower. Quantity: The technical content of 09-9 / 4152-14 / 2012th based on the information registration number valid building permit and the construction plan documentation included. Background: The Diocese for the beginning of 2005 gave a mandate to the center of Pécs church and church art collection building design. Registration historic buildings marked the regulation does not exist, is the only archaeological site under protection. The official site of the full title deed under the Royal Serbian Diocese of property, archaeologically protected lakóház- yard and three farm building was located on it. No. 15 18 597 u. regarding property under the new chapel bell-tower building. Design tasks: The contractor responsible for carrying out the technical content provided on the basis of a valid building permit and construction plans and permits. The archaeological expertise necessary to perform the tasks prior to contractor must provide the necessary time and financial conditions, as well as for specialized tasks should be subject to archaeological institutions authorized to perform the tasks contract. A collection of exhibition space will be renovated premises of the proposed functional architecture and associated specialist mechanical and electrical safety transformations. Floor plan of the building Arche type breakdown of (Sole-Naos-pronaosz-exonartex), while the interior is shaping (archaic cabin and síkmennyezet) and external shaping (archaic Sheet-closing action-store belts) mass archaic (distributed mass and articulated cornice) is a historical quote appearance follows. The detailed technical specifications included in the detailed design architect. The gallery is also the chapel lobby level split toronyalj indoor hallways can be approached as a participant in the liturgy choir members, through the firewall steel staircase with wood paneling along the driveway. The two-storey tower covered saucer and tower room and the open belfry pronounced element of the composition. The building is a mixture of archaic and modernist design, with an emphasis displaying the orthodox elements, endeavoring to use the simple clean shapes. The facade of the chapel liturgical space typically traditional plaster wall architecture, masonry brick cornice with decorative stone and brick paneling, interior and exterior wood doors and windows.
  • 1