each connection point (consumer sites listed in the contract draft which is part of procurement document) GYSEV. within the framework of the electricity supply full supply contract between free-market framework, without scheduling obligation, 2017 year, 72 GWh +30% / year, Hungarian Transmission continuous network availability, BS 1: 2002 or BS EN 50160: 2001 standard quality, 1/1/2017. - 31.12.2017. settlement between.
24:00 to 12 months' duration with performance.The use sites concerned did not operate in household size and small power plants are not designed for the installation and commissioning of the duration of the contract.
Contracting Authority requires that electricity generated and consumed in traction, the contractor is required to szaldózottan accounted for and billed to the consumer.
If the process does not have a winner in their own balance group, the settlement is between the winner and is responsible for the balance group.The bid price is fixed electricity price for the entire term of the contract.
- The bid price includes the cost of electricity and balancing energy, border crossing fees, the balance group membership fees, the bid price does not include any costs for the service broadcast invoicing as well.
energy produced in Regulation 27.) NFM, renewable energy sources and wastes electricity production in order to facilitate the transmission system operator compulsorily purchased by the Electricity Trading (FIT) the amount and cost of regulation.Electricity supply of all connection points of GYSEV Zrt. (As listed in the technical content as part of the Procurement Document), in the framework of a full supply contract under free market conditions, without scheduling obligation, for 2018, 73 GWh +30% (option) continuously available on the network, standard quality, from 1 January 2018 to 31 December 2018. performance.
The contracting authority requires the winner contractor to invoice and invoice the electricity consumed and generated during the towing.
Up to 24:00 hours for a 12-month period.No small-scale household power plants are in operation at the sites concerned and their installation and commissioning are not planned for the duration of the contract.
The contracting authority requires the winner contractor to invoice and invoice the electricity consumed and generated during the towing.
If the winner of the procedure does not have his own balance sheet circle, the settlement is between the winner and the balance group.Offer electricity is a fixed price for the entire duration of the contract.
- The offer price includes: electricity and balancing energy costs, cross-border charge, membership fee for the balance group, the offer price includes the possible costs of invoicing the mediated service.
9-13 / A. Of the CAA and the premium cash. The contracting authority checks the existence of the license in the register of the Hungarian Energy and Utilities Regulatory Authority. In view of Article 76 (5) of the EC Treaty, the contracting authority informs tenderers that the requirements of the contracting authority meet the quality and technical requirements specified in the contract as the object of the procurement, and the selection of the most economically advantageous tender is only to be used to evaluate the lowest price, standard product defined by the law and can not be differentiated according to quality criteria. If the present procurement procedure is prolonged and the electricity trading contract does not take effect at the specified time in view of the delay, the starting point for the entry into force of the contract may be extended by the time the procurement procedure may be delayed.Villamos energia adásvételi szerződés