Call +44 800 9755 164

Public tenders for electrical in Budapest Hungary

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

Electrical materials

Budapesti Távhőszolgáltató Zrt. | Published January 7, 2017  -  Deadline February 3, 2017

Purchase of electrical materials required for installation module manufacturing and a framework contract for 12 months.

Electrical materials

Budapesti Távhőszolgáltató Zrt. | Published December 28, 2016  -  Deadline January 31, 2017

Purchase of electrical materials required for installation module manufacturing and a framework contract for 12 months.

Purchase of electrical materials production and module required for installation, and the Customer 1116, Kalotaszeg u. Transport of the date specified address under number 31. This procurement procedure aims to ensure the future through the sale of futures substances specified in the documentation consignment stock.

Contracting Authority intends to ensure some of the materials to be purchased through consignment stock. A detailed list of substances covered konszignációval be itemized determined within 30 days of the contract concluded with the successful tenderer. Elements of the evaluation process the material presented by way of example in the products that could be subject to a consignment store delivery.

The net value of warehouse kongszignációs 50 million HUF.

Electrical machinery, apparatus, equipment and consumables; lighting

MÁV Szolgáltató Központ Zrt. | Published December 23, 2016  -  Deadline February 10, 2017

Purchase a framework contract settlement depository warehouse of various electrical materials, procurement of light sources, such as electronic circuit materials, other electrical materials, light sources

Total quantity or value:

Part 1 deals Electrical circuit materials 120 000 000 HUF + 50% 180 000 000 HUF option;

Part 2 offers other electrical materials 68 million HUF + 50% options 102 000 000 HUF.

Part 3 deals Light Sources 108 000 000 HUF + 50% 162 000 000 HUF option;

Sub-contracting deals for each of the specified options reduced envelope up to take the appropriate order (exercise) the commitment.

Value: 180 000 000 HUF + VAT.

definition and detailed description, and the quantity of the products included in the procurement documents.

Value: 102 000 000 HUF + VAT.

The definition of assets and detailed description, and the amount included in the procurement documents.

Value: 162 000 000 HUF + VAT.

The definition of assets and detailed description, and the amount included in the procurement documents.

Repair and maintenance services of electrical and mechanical building installations

Magyar Államkincstár | Published December 20, 2016  -  Deadline February 3, 2017

operated by the Hungarian State Treasury buildings and air-conditioning systems and equipment maintenance, repair, renovation and operational activities "in the documentation indicated below.

The air-handling systems and equipment maintenance, repair and operation activities shall be provided at the following locations operated by the Hungarian State Treasury's premises:

Center:

- 1054 Budapest, Hold utca 4 (monument)

- 1054 Budapest, Hold utca 7,

- 1054, Hunter Street 16th

Bekes County:

- 5600, Liberty Square 7-9.

- 5600, Dózsa György út 1. (locally protected).

Csongrad County:

- 6720 Szeged, Castle Street 5 (monuments, locally protected)

- 6720 Szeged, Széchenyi tér 9. (monument).

Zemplén County: County:

- 3525 Miskolc, Pálóczy László utca 5,

- 3525 Miskolc, Heroes 3rd

Heves county:

- 3300, 5 square Esterhazy,

- 3300, Telekessy Istvan utca 2,

- 3300, Sandor Petofi street 40th

Bihar County:

15th

Nograd county:

- 3100, Rákóczi út 13.,

- 3100, Rákóczi road 15th

Jasz-Nagykun-Szolnok County:

- 5000, Magyar utca 8,

- 5000, Park Road 6th

Szabolcs-Moson-Sopron County:

- 4400, 8 Martyrs Square - Church Street 15,

- 4400, Széchenyi utca third

Bács-Kiskun County

- 6000, Katona József tér 8.,

- 6000, Liberty Square first

The amount of per-Hungarian parts of the country:

- Window air-conditioning 20,

- Fan coil / split 903 indoor units,

- Chiller 13 db,

- 114 pieces of fan,

- 23 air handling units.

The number of buildings and the amount of established plants ranging up to + 30% change during the contract period.

The air-handling systems and equipment maintenance, repair and operation activities shall be provided at the following locations operated by the Hungarian State Treasury's premises:

Budapest and Pest County:

- 1132 Budapest, Váci út 71.,

- 1115 Budapest, Bartók Béla út 120-122.

Baranja County:

- 7621, 2nd Street 6./Vörösmarty Nun Street,

- 7621, Szigeti út 33-33 / a.

Fejér County:

- 8000, Autumn utca 11-13.

Győr-Moson-Sopron County:

- 9024 Győr, Gergely street Czuczor 26 (Baross Gábor utca 21.)

- 9024 Győr, Hunyadi utca 6 / a.

Komárom-Esztergom County:

- 2800, Main Square 32,

6th

Somogy County:

- 7400, Kossuth tér 7-8.

- 7400, 5th Field Street,

- 7400, Széchenyi tér 3-4.

Tolna County:

- 7100, Augusz Imre utca 7,

48-52. / Találka Square 11th

Vas county:

- 9700, Hefele Menyhért utca 3-5.

- 9700, Szell Kalman utca 20 (locally protected).

Veszprem County:

- 8200, to Budapest 4th

Zala county:

- 8900 Zalaegerszeg, Decorative Square 7,

- 8900 Zalaegerszeg, Flower Benedek utca 5 / b.

Quantity of West Hungary parts per country:

- Window air-conditioning 0 db,

- Fan coil / split 994 indoor units,

- Chiller 13,

- Fan 83

- AHU 14th

The number of buildings and the amount of established plants ranging up to + 30% change during the contract period.

Electricity

Országos Mentőszolgálat | Published December 31, 2016  -  Deadline February 9, 2017

The National Ambulance Service to supply electricity 01.03.2017. 00:00 - 02/28/2019. 24:00 period, full supply of electricity within the framework of the purchase contract.

Purchases of electricity a total of 5.2 million kWh / year + 20% of 01/03/2017 to the contracting authority. 00:00 - 02/28/2019. For the period 24:00 pm, full supply, scheduled within the framework of consumer wireless transmission of electricity purchase contract.

The contract price includes the border crossing fee, the balance circle membership fee, LXXXVI 2007 on electricity. TV. 9-13. as defined in §-and 389/2007. energy (XII.23.) Government decree regulated, renewable energy sources and wastes generated electricity, as well as to the generated electricity transmission system operator, to promote the production of required electricity to be purchased by the dealer (FIT) the amount and cost of regulation. The contract price does not include the system of user charges in 2007 LXXXVI. TV. funds as defined in § 147, of the energy tax, VAT and other taxes, levies, fees, charges and expenses that may arise from the legislation.

Evaluation criteria: Contracting Yes. § 76th According to (2) a) evaluate the bids and selects the most economically advantageous tender for referring to the PPA. § 76 (5). The contracting needs of quality and technical requirements specific to the acquisition as the subject of a specific good meet, in addition to the selection of the most economically advantageous tender solely for the lowest price assessment, given that the standard product and additional quality criteria specified in the commodity law and defined according indistinguishable.

Electricity

Budapest Főváros VII. kerület Erzsébetvárosi Polgármesteri Hivatal | Published December 24, 2016  -  Deadline January 27, 2017

Buying power of Budapest VII. Elizabeth City District Mayor's Office, City of Budapest VII. Elizabeth District Municipality of economic institutions and companies under full board (for a limited time) based electricity trading contracts.

Buying power of Budapest VII. Elizabeth City District Mayor's Office, City of Budapest VII. Elizabeth District Municipality of economic institutions and companies under full board (for a limited time) based electricity trading contracts.

The amount of electricity to be procured (with no extension of the contract period): 3,498,903 kWh.

The number of connection points: 106.

Electricity

Szociális és Gyermekvédelmi Főigazgatóság | Published December 23, 2016  -  Deadline January 31, 2017

operated by contracting consumption places for full-board basis in the context of sale and purchase agreement 27.62346 million kWh + 50% amount of electricity 05.01.2017. 00:00 and 04/30/2018. period.

Winning bidders must treat the entire contract amount in total for all sites use 27.62346 million kWh + 50% of all institutions listed in Annex 1 procurement documents involved in the procurement process with respect.

operated by contracting consumption sites for full board in the context of contract-based selling 41,435,206 kWh (which contains 50% option) amount of electricity 05.01.2017. 00:00 and 04/30/2018. period.

Contractor of the total contract amount of 41,435,206 kWh (which contains 50% option) any place of use for all institutions listed in Annex 1 procurement documents involved in the procurement process must be treated with respect for each category.

Electricity

Médiaszolgáltatás-támogató és Vagyonkezelő Alap | Published January 7, 2017  -  Deadline January 25, 2017

obtain electricity connection points for the MTVA part of a commercial contract, without giving a timetable consumer 01/04/2017 Standard quality (meeting the requirements of BS 2002 standards EN 50160: 2011 and BS 1). - 08.31.2018. period.

The subject of the public procurement: Overall, 16.9 GWh of standard quality (to DIN EN 50160: 2011 and BS 1: 2002 in conformity standards) obtain electricity connection points for the MTVA part of a commercial contract, without the consumer broadcast schedule of 04/01/2017. - 08.31.2018. period.

the duration of the contract amount of electricity to the entire quantity specified here in may differ +/- 10%, that of 1711/2015. Based on (X.5.) Government decision to change the points of consumption under the contract and / or the contract period, which is subject to the Contracting Authority reserves the PPA. According to § 141 paragraph (4) a) the possibility of amending the contract, that the main volume in the invitation to tender (16.9 GWh) vary in proportion to changes in the connection points.

Bidders will inform the contracting authority that, in the event that all of the tasks of state-owned real estate ownership is not necessary to return to the Exercise of 1711/2015. Based terminated (X.5.) government decree, the total amount of 11.6 GWh per 12 months (+/- 10%) is amended.

The number accounted for in accordance with the distribution of consumption profile locations to more than 25 pieces.

The detailed requirements include supplies related to compliance with the procurement documents.

Electricity

Médiaszolgáltatás-támogató és Vagyonkezelő Alap | Published January 18, 2017  -  Deadline January 25, 2017

obtain electricity connection points for the MTVA part of a commercial contract, without giving a timetable consumer 01/04/2017 Standard quality (meeting the requirements of BS 2002 standards EN 50160: 2011 and BS 1). - 08.31.2018. period.

Approval plans, working drawings and specifications

MTA Kísérleti Orvostudományi Kutatóintézet | Published December 24, 2016  -  Deadline February 1, 2017

necessary for the performance of the IEM premises to be established a new research building full design, architecture, Structures laboratories, offices and develop other service areas on and the new building is full of technology and comfort engineering and full electrical energy and building automation 1 design concept, 1 evaluation plan , preparation of all necessary design plan and detailed design documentation for one piece design framework agreement.

Bidder is required for each task, complete and correct to the applicable regulations building construction design, detailed design, preparation of technical specifications, which required a total of about 7000-8000 m² net floor area of ​​research building construction, about 3500-4000 m² lab.

The IEM premises to be established a new research building full design, architecture, structures, supplying laboratories, offices and develop other service areas on and the new building is full of technology and comfort engineering and full electrical energy and building automation need one piece design concept, 1pc evaluation plan , preparation of all licensing and 1 tervs construction design documentation for planning framework contract.

Bidder is required for each task, complete and correct to the applicable regulations building construction design, detailed design, preparation of technical specifications, which required about a 7000-8000 research m²összes net floor area building construction, about 3500-4000 m² lab.

Radioactive-, toxic-, medical- and hazardous waste services

Fővárosi Közterület-fenntartó Zártkörűen Működő Nonprofit Részvénytársaság | Published December 22, 2016  -  Deadline January 24, 2017

Collection of hazardous waste associated with clearance.

139 area (collection point) plus the cumulative total bid price of 30% of the amount of hazardous waste-collection the following:

Name identification code.

20 01 28 Paints, inks and packaging thereof.

20 01 26 * Baking grease, oil.

08 01 11 * Remaining Toner and their packaging.

15 01 10 * Oil-contaminated packaging waste.

14 06 03 * Solvents, thinners.

20 01 19 * pesticides.

20 01 35 * Electrical waste.

20 01 36 electrical waste.

17 04 09 * Hazardous materials contaminated with metal.

15 01 11 * Spray bottle.

20 01 21 * Fluorescent.

20 01 33 * Dry Battery, Automotive starter battery.

20 01 31 * Waste pharmaceuticals.

16 01 03 Tire.

13 02 05 * Waste oil.

08 03 17 * Toner.

The Contracting + 30% corresponding to the amount of up to 30% on all weekdays and public holidays carry out hazardous waste collection service is available when using differences in quantity.

Feasibility study, advisory service, analysis

NIF Zrt. | Published December 29, 2016  -  Deadline February 2, 2017

Design contract to develop the rail traction power supply MÁV Zrt.'s Network of feasibility studies, preparation of plans and licensing tender documentation.

The National Infrastructure Development Corporation. "Railway traction power supply development MÁV Zrt.'s Network" Feasibility Study and power simulations, licensing plans, obtaining their permissions, tender documentation compilation and for export tender plans for preparing planning to use part of the national public railway engineering consultancy services standard gauge railway lines, which are nourishing high-voltage electrical substations and tápszakaszaik (sections 30 to 30 km on average) redevelopment and / or improvement in respect of the following:

- No. 1. railway traction substations providing power supply: Kimle, Nagyszentjános, Tatabanya, Biatorbágy,

- No. 70 and 71. railway substation providing partial traction power supply: Vac,

- No. 40. railway substation providing partial traction power supply: Szabadegyháza,

- No. 82 and 120. railway substation providing partial traction power supply: Újszász,

- 80 and 100c. s. railway substation providing partial traction power supply: Füzesabony, Nyékládháza, Nyíregyháza,

Also located under the following TEN-T lines, substations regarding: Kisvárda, Belecska, California.

The contractor shall perform power simulation, the results of which required for reproduction and databases, data sets should be communicated.

Through studies and simulations to assess, examine and revise plans based on available documentation specified in the current technical condition of substations, power role, to determine the electrical load capacity based on conditions in the light of current and future loads.

Feasibility Study of traction substations concerned (... high / medium voltage electric substation refurbishment / redevelopment) and standard gauge tápszakaszaik respect.

Cost-benefit analysis (CBA) preparation of documents.

preparing and obtaining the environmental permit, this tápszakaszok substations and the associated environmental impact assessment in respect of

Preparation of Natura 2000 impact assessment documentation.

Preparation of EVD / environmental impact study and submission to the licensing process and the involvement of the licensing authority.

preparation of design documentation, licensing and other substances and, if necessary for tápszakaszaikra and their submission for obtaining licenses and contributing to the licensing authority.

tápszakaszaik substations and preparation of tender documents isolator can export selected on the basis of respect MT.

a transfer of power simulation database, which provides power to the computer-based simulation software later reproducibility of the specified substances under normal operating and accident tápszakaszainak with respect.

Catenary's construction works

NIF Zrt. | Published December 23, 2016  -  Deadline February 7, 2017

Determination of contract:.

"Szabadbattyán - Tapolca - Keszthely implementation bottlenecks challenge, electrification and centralized traffic control around the lake Phase I (Szabadbattyán-Aszófő)" project overhead line construction, railway construction and additional works of design and construction.

framework contract for the "Szabadbattyán - Tapolca - Implementation of Keszthely bottleneck challenge, electrification and centralized traffic control around the lake Phase I (Szabadbattyán-Aszófő)" project overhead line construction, railway construction and additional works of design and construction, the following main quantities:

Szabadbattyán - Aszófő electrification of the railway line, 50 Hz 25 kV AC overhead electrical design and construction of 60 km .;

Electrical substation design and construction of two locations;

transformer provided by the expansion and redevelopment of Customer Szabadbattyán existing 120/25 kV substation, transmission line construction in the feeding phase limit;

Aszófő existing 120/25 kV substation expansion for MAV provided by Customer transformers, power supply phase construction of the border;

Exchange Heating Design and construction of 42 bypass group;

Optical Cable Design and Construction (part vasútvillamosítás) 60 km;

5. Consolidated train operation control system is installed (as part vasútvillamosítás);

Catenary power control (FET) Establishment (part vasútvillamosítás):

6.1. Station 8;

Phase Cross: 3;

Bypass installation or replacement, substructure reinforcement:

Polgárdi industrial sites Station: 4 groups;

Polgárdi Station: 2;

Csajág station: 5 groups;

Balatonkenese station: 4 groups;

Balatonfűzfő station: 4 groups;

Balaton station: 4 groups;

Alsóörsi station: 5 groups;

Balatonfüred station: 12 groups;

Aszófő Station: 2;

Track construction substructure reinforcement: 11,5 km;

Strengthening local substructures: 700 vm;

Widening Alépítménykorona: 1900 vm;

11 Ágyazatrostálás 8750 vm;

Edilonos track construction system: 180 m;

Peronépítés (SK + 55 cm magasperon small battery cover 250 m in length):

13.1. Középperon station: 9;

Stops: 7;

Paved ditch construction: 4800 m;

Leakage System Construction of 14 km .;

One or multiple track crossing, providing level crossing level crossing, pedestrian and duty construction and reconstruction:

Rail and road crossings to ensure crossing 29 group;

providing rail-pedestrian crossing pedestrian crossing 23 group;

platform approach to providing pedestrian passage 11 group;

16.4. Station operating passage: 3 groups;

Peronaluljáró Balatonfüred renovation of the station;

Peronaluljáró Csajág renovation of stairs, and Balatonfüred stations;

Installation of platform lifts for disabled approach and Balatonfüred station: 4;

Small works of art construction / reconstruction: 3;

Stairs and ramps Reconstruction Balatonakarattya stop there;

Bridge Insulation works Renovation of objects: 2;

Railway perontető refurbishment / redevelopment Balatonfüred station;

Stations are installing shelters: 21 pc;

Asset protection, installation of fire alarm systems in buildings admission: 7;

Alsóörs power station design office;

Balatonfüred Kofi station design center;

28 Stations remotely control the station building 8;

29 station interlocking in accordance with, the construction phases, 8. station;

standardization of public utility crossings;

Create and export licensing and combined plans for implementation.

Technical inspection services

NIF Zrt. | Published December 29, 2016  -  Deadline February 2, 2017

Assignment of Contract No. 338. Western Highway bypass Nyíregyháza 6 + 830-14 + 711 km no. perform engineering tasks related to the implementation of the section between (among 36 main road no. 3822nd and j. the road).

Part 1: No. 338. Western Highway bypass Nyíregyháza 6 + 830-10 + 600 km no. supply engineering tasks related to the implementation of the section between (among 36 main road and 38 main road..), PST: A003.23.

The subject of the implementation of construction-related traffic 2x1-lane road led to a new track.

Cross-sectional design: crown width of 12.00 m, a width of traffic lanes of 3.5 m, 2.5 m padkaszélesség.

The No. 36. and the main road No. 38. section between the main road (3.77 km) II. a main road network classification will be implemented. The trail crosses a separate floor of the Budapest-Miskolc-Szerencs-Nyíregyháza railway. The No. 38. main road roundabout crossing points. Affected utilities: telecommunications networks, small and medium-voltage power grid, water and sewage networks.

The Engineering Task more detailed description of the documentation.

Part 2: 338. c. Western Highway bypass Nyiregyhaza 10 + 600-14 + 711 km no. supply Engineering jobs (from 38 main road and the road 3822nd j..) associated with the implementation of the section between PST: A003.23.

The object of the associated implementation: implementation of 2x1 traffic lanes, new tracks led to the road.

Cross-sectional design: crown width of 12.00 m, a width of traffic lanes of 3.5 m, 2.5 m padkaszélesség.

38, no. The main road and the 3822 j. they. Between way - Nyírszőlős road (4.11 km) will be implemented connecting road network classification, the end section roundabout points. Affected utilities: telecommunications network, low, medium and high voltage electrical network, water network, medium and medium-high-pressure hydrocarbon pipelines.

The Engineering Task more detailed description of the documentation.

Religious buildings construction work

Magyarországi Zsidó Hitközségek Szövetsége | Published December 10, 2016  -  Deadline January 25, 2017
11-13. Synagogue ID (34199th u.) II listed building is under reconstruction. and III. phase. 

11-13. Reconstruction of numbers (34199th u.) below the historic Synagogue building construction works of II. and III. A technical description of the procurement documentation forming part of the framework of the implementation phase in connection with a project called "Coexistence House" further defined in accordance with a contract.

The reconstruction consists of the following key job components and quantities:

Levels of gross floor area.

Basement 544.1 m².

1 Ground Floor 311.8 m².

1 first floor 311.8 m².

II. Floor 1 193.5 m².

III. Floor 1 193.5 m².

Attic 546.2 m².

Attic Gallery 220 sqm.

Total floor area: 776.8 m² 5.

Demolition work within the 5 776.8 m² building complete demolition of the existing building mechanical and electrical systems, including the structure of construction work in designated areas to carry out the necessary demolition of the roof demolition (carpenter structures, sheet metal work), unnecessary partitions and ceilings breakdown and at designated locations coverings demolition, demolition of elevators, windows and doors broken down according to the construction plan documentation.

The church space will be restored to its original state (church background work to be carried out in the Technical Description separate chapter), which will also function as a space exhibition is based on the detailed design documentation.

New sheet metal roofing will be developed on the basis of detailed design documentation.

Roofing new roofing is made, together with the necessary tinsmith work on the basis of detailed design documentation.

Textiles: new flooring, wall coverings, suspended ceilings are made on the basis of detailed design documentation.

Plasters: the newly finished walls, respectively. improving facades, respectively. re-plastered they are made on the basis of detailed design documentation.

Skins: each painting is a significant part of restoration on the basis of detailed design documentation.

Joinery: a significant part in the restoration work, new interior doors and windows are made on the basis of detailed design documentation.

Building services: building a whole new building system made from water network, sewerage system, heating, cooling, ventilation, based on the detailed design documentation.

Heavy- and light-current design: the entire building new electric heavy- and light-current system will be built on the basis of detailed design documentation.

Landscaping and environmental planning: the building of 580 sq m garden in the inner courtyard of the implementation plan will be developed.

Restoration work, which will be carried out specialist restoration expert says:

- Stone restoration work,

- Restoration painting (decorative painting, gilding) work,

- Metal restoration work,

- Wood restoration work.

1200 m²) on the basis of detailed design documentation.

Measuring instruments

BM Országos Katasztrófavédelmi Főigazgatóság | Published December 29, 2016  -  Deadline February 17, 2017
Contract of sale "value Leakage Meter pressurized flue gas exhaust sensors" on the subject. 

Purchase contract "Tüzeléstechnikai instrument" subject.

Part 1 Sales contract "value Leakage Meter pressurized flue gas exhaust sensors" on the subject.

the subject of acquisition: Leakage value measuring instrument, its accessories (inflatable plug kit) - pressurized ripening flue Twitter.

Technical parameters:

The device is suitable for:

- The value of pressurized flue gas according to EN 1443 standard drains leak,

- Measurement for regulatory purposes (according to the Act XLV of 1991.)

determining the leakage values ​​based on the accuracy and distribution in the standard -

- The value of 50-600 mm diameter flue gas leakage drains,

- 230-volt charge of electricity supply and 50 Hz operation, and continued for at least 4 hours of battery operation.

The tool provides:

- A printer and / or computer connected to the preparation of the measured values ​​of Protocol,

- Operating 230 V 50 Hz mains charger

- The instrument carrying case and accessories for transporting, storing,

- Taps required for testing flue 50-150 mm diameter inflatable seal kits,

- Detailed Hungarian-language user's manual,

- Certificate of Calibration.

Purchased raw quantity: 20 pieces.

Option amount: 6.

Any doubts concerning the specific elements of the tender proof of the contractor in full you must disband, which is a clear and verifiable evidence should provide substantiating its claims.

The time required for each device for teaching may be different, but the principle that education per unit for at least 2 people, within the framework of theoretical and practical training necessary to conduct content.

Hungarian communication is needed to ensure the opportunity of servicing contractor

The calibration of all required maintenance obligations and the need for regulatory measure to maintain the frequency determined by the contractor.

Part 2: Sales contract "Tüzeléstechnikai instrument" subject.

the subject of acquisition: Tüzeléstechnikai instrument.

Technical parameters:

The device is suitable for:

- Analysis of room air: temperature, flue gas recirculation (flue gas components under any presence) to measure and attached separately, without additional probe of CO (0-400 ppm) measurement and alarm limits are exceeded,

- Gas-fired combustion equipment for testing CO (0-8000 ppm) and temperature (0-600 degrees Celsius)

- Concentric flue gas deflector mounted room sealed gas fired equipment intake air to measure the parameters of the measurement of O2 (0-21 vol%) and CO2 content,

- Draft measurements (-9 + 20 hPa in the range of 1 Pa resolution)

to determine compliance with the limits imposed on the parameters on the basis of accuracy and distribution, -

- Data collection (at least 500 data) documenting the measured values,

- Measuring cell monitoring,

XLV. under the law) the technical specifications in respect of named parameters,

- 230 V at 50 Hz electrical power adapter for charging and operation of continuous battery operation to 8 hours.

The tool provides:

- Illuminated high-resolution color display (220 * 320 pixels minimum)

- Bluetooth or USB PC connection and the measured parameters to export or import the client data,

- Making a computer run, can be defined by the user, client software available Protocol,

- Hungarian menu,

- A magnet to metal surfaces of the instrument recording,

- Robust design protection, at least vertically against dripping water,

- More than 60 seconds settling time measurement,

- Automatic load cell reset after start-up (up to 60 seconds)

- At least 80 cm long cable connected to a flexible probe parameters of exhaust gas appliances for testing,

- 0-40 degrees C operating temperature range,

- Interchangeable load cells,

- The standard for proving compliance with EN 50379 1-3 for compliance certification

- Certificate of Calibration.

Purchased raw quantity 150 pieces.

Option quantity: 45 pcs.

Any doubts concerning the specific elements of the tender proof of the contractor in full you must disband, which is a clear and verifiable evidence should provide substantiating its claims.

The time required for each device for teaching may be different, but the principle that education per installation for at least two people, both theoretical and practical content f
  • 1