Mihaly Csokonai Vitez Primary School Modernisation of energy - Contract Amendment 2nd

Bicske Város Önkormányzata | Published December 23, 2015
Winner
Mészáros és Mészáros Kft.
cpvs
45000000

Part 2: Mihaly Csokonai Vitez elementary school energy modernization tasks during the school energy modernization: • Procession facilities • Formwork and scaffolding • Earthworks and civil engineering • Plastering and rabicolás • Roofing • Substrate preparation, preparation hidegés warm jacket • Flashing • Joiner constructions • Metal constructions • Finishing • • Electrical Insulation • Building cleaning works must be carried out complex tasks with a total of 3,043.51 m2 on the ground floor and two floors and the basement of the building. A detailed description of the exact quantities and contains a technical specification annexed to the specifications.

St. Margaret Elementary School and St. Ladislaus Members Michael Csokonai Vitez Primary School Modernisation of energy - Part 2 Contract Amendment

Bicske Város Önkormányzata | Published November 9, 2015
Winner
Mészáros és Mészáros Kft.
cpvs
45000000

Part 2: Mihaly Csokonai Vitez elementary school energy modernization tasks during the school energy modernization: • Procession facilities • Formwork and scaffolding • Earthworks and civil engineering 2 • Plastering and rabicolás • Roofing • Socket making, cold and creating a warm jacket • Flashing • Joinery Structures • Metal Structures Finishing • • • Electrical Insulation • Building cleaning works must be carried out complex tasks with a total of 3,043.51 m2 on the ground floor and two floors and the basement of the building. A detailed description of the exact quantities and contains a technical specification annexed to the specifications.

"Modernization Bicskei training pool, thermal and technology to meet the electricity needs using renewable energy sources" - Results of the procedure

Bicske Város Önkormányzata | Published November 6, 2015
Winner
FEJÉR-B.Á.L. Zrt.
cpvs
45000000

"Modernization Bicskei training pool, thermal and technology to meet the electricity needs using renewable energy sources" Contractor's duties in accordance with the technical specifications to ensure provision of the training pool Bicske process heat and electricity. The project aims to pool covered by the development application of heat pumps and solar systems below 50 kVA connected load by establishing reduce the rate of greenhouse gas emissions and increase the share of renewable energy sources. The heat supply of alternative energy supply systems, ground source water to water heat pump. The required heat a piece of ground source water to water heat pump. The soil probe to install the necessary size of the area available. The applications that may be relevant in heat pumps and combined with COP of the heat supply system is designed to express the introduced surplus of electric energy and heat energy recoverable value of between 4.0-5.0. Based on the above, the heat pump classified appropriate technical-environmental point of view. For Bicskei Tanuszoda 100-150 kW of heat demand solution can be suitably heat pump trigger. The purpose of the training pool heat pumps and technological needs of electricity supply must be installed 30 KW photovoltaic system in the attached technical specifications indicated below.

"KDOP-3.1.1 / B 12-0002-deposit box and feature extension urban regeneration '- Contract Amendment

Bicske Város Önkormányzata | Published September 18, 2015
Winner
Baurek Építőipari és Szolgáltató Kft.
cpvs
45211360

Purchase of construction design and planning service expansion and partial renovation of the Town Hall building Bicskei. The building is about 650 m2 floor area on 3 levels - ground, floor, attic - expanding to the court. Enlargement must demolish the existing building and the courtyard kazánkéményt facade of függőfolyosóját. The extension, offices, community space, sanitary facilities, and a lift providing accessibility will be built. A building permit for the extension, and construction contracting documentation that the contractor shall provide the lift design and licensing of the construction, and the fire alarm system of licensing and deployment should be carried out within the framework of this acquisition suppliers. Based on the construction documents and the budget announcement extension must be implemented in full (architecture, engineering, electricity), building on existing work to be carried out according to the budget proposals. (Eg. Customer service and related transportation, fire water system, fire alarm system, linking the existing boiler heating system and electrical supply distributors, the main distributor for the related network connecting). Bidder should co-operate in the process of usage.