Call +44 800 9755 164

Public tenders for electrical in Hungary

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!
ElectricalHungary

Electrical materials

Budapesti Távhőszolgáltató Zrt. | Published January 7, 2017  -  Deadline February 3, 2017

Purchase of electrical materials required for installation module manufacturing and a framework contract for 12 months.

Electrical materials

Budapesti Távhőszolgáltató Zrt. | Published December 28, 2016  -  Deadline January 31, 2017

Purchase of electrical materials required for installation module manufacturing and a framework contract for 12 months.

Purchase of electrical materials production and module required for installation, and the Customer 1116, Kalotaszeg u. Transport of the date specified address under number 31. This procurement procedure aims to ensure the future through the sale of futures substances specified in the documentation consignment stock.

Contracting Authority intends to ensure some of the materials to be purchased through consignment stock. A detailed list of substances covered konszignációval be itemized determined within 30 days of the contract concluded with the successful tenderer. Elements of the evaluation process the material presented by way of example in the products that could be subject to a consignment store delivery.

The net value of warehouse kongszignációs 50 million HUF.

within the framework of electrical industrial materials, light sources to obtain custody warehouse in 2016

MÁV Szolgáltató Központ ZRT. | Published December 28, 2016  -  Deadline February 10, 2017
within the framework of electrical industrial materials, light sources to obtain custody warehouse 2016th

Electrical machinery, apparatus, equipment and consumables; lighting

MÁV Szolgáltató Központ Zrt. | Published December 23, 2016  -  Deadline February 10, 2017

Purchase a framework contract settlement depository warehouse of various electrical materials, procurement of light sources, such as electronic circuit materials, other electrical materials, light sources

Total quantity or value:

Part 1 deals Electrical circuit materials 120 000 000 HUF + 50% 180 000 000 HUF option;

Part 2 offers other electrical materials 68 million HUF + 50% options 102 000 000 HUF.

Part 3 deals Light Sources 108 000 000 HUF + 50% 162 000 000 HUF option;

Sub-contracting deals for each of the specified options reduced envelope up to take the appropriate order (exercise) the commitment.

Value: 180 000 000 HUF + VAT.

definition and detailed description, and the quantity of the products included in the procurement documents.

Value: 102 000 000 HUF + VAT.

The definition of assets and detailed description, and the amount included in the procurement documents.

Value: 162 000 000 HUF + VAT.

The definition of assets and detailed description, and the amount included in the procurement documents.

Purchase of electrical materials required for installation module manufacturing and a framework contract for 12 months

Budapesti Távhőszolgáltató Zrt. | Published December 30, 2016  -  Deadline January 31, 2017
Purchase of electrical materials required for installation module manufacturing and a framework contract for 12 months

Electrical supplies and accessories

EDF Démász Zrt. | Published December 22, 2016  -  Deadline January 27, 2017

Kisfeszültségű (0,4 kV) csupasz és szigetelt szabadvezetékek, ill. a középfeszültségű (22-35 kV) csupasz és burkolt szabadvezetékek rögzítő, és leágazó szerelvényeinek szállítása.

Szabadvezetéki végfeszítő, középfeszültségű hálózaton AASC 25-120 mm² és ACSR 50/8-95/15 mm² vezetékekre.

Funkció:

A szerelvénynek biztosítania kell a vezeték sérülésmentes, csavaros szorítós megfogását, és húzószilárd csatlakoztathatóságát a rúdszigetelőkhöz, vagy annak illesztő (távolságtartó) eleméhez.

Feszítő csukló, középfeszültségű feszítő szigetelők rögzítésére.

Funkció:

A szerelvény biztosítja a középfeszültségű, VÁT-H típusterv szerinti feszítő kereszttartók és a feszítő szigetelők közötti rögzítést, biztosítva a szigetelő le-fel és oldal irányú elmozdulását.

Előreformázott tartókötés nyakhornyos szigetelőre, 35 mm² AASC vezetékhez (Ø7,5 mm).

Előreformázott tartókötés nyakhornyos szigetelőre, 50 mm² AASC vezetékhez (Ø9 mm).

Előreformázott tartókötés nyakhornyos szigetelőre, 50/8 mm² ACSR vezetékhez (Ø9,6 mm).

Előreformázott tartókötés nyakhornyos szigetelőre, 95 mm² AASC vezetékhez (Ø12,5 mm).

Előreformázott tartókötés nyakhornyos szigetelőre, 120 mm² AASC vezetékhez (Ø14 mm), és legyen alkalmas a 95/15 mm² ACSR acélmagvas vezetékhez (Ø13,61 mm) is.

Funkció:

A megajánlott szerelvények biztosítsák a csupasz 22-35 kV-os szabadvezetékek rögzítését a tetszőleges iránytörésben (0°-30°) elhelyezett Ø56 mm nyakhornyú műgyanta tartószigetelőkre.

Középfeszültségű 9 5mm² csupasz vezetékre felhelyezhető spirál rezgéscsillapító.

Funkció

Az előformált rezgéscsillapító spirál funkciója a 95 mm² csupasz szabadvezetéken fellépő rezgések csillapítása.

Szabadvezetéki leágazó középfeszültségű csupasz vezetékre FAM-ra alkalmas 25-95/25-95 mm² keresztmetszetre.

Funkció:

A megajánlott szerelvény biztosítsa a csupasz 22-35 kV-s szabadvezetékek feszültség alatt is kezelhető, csavaros áramkötéseinek létrehozását FAM kezelőrúd segítségével.

Oszlop transzformátorállomás belső biztosítós (T.P.C.) transzformátorának középfeszültségű csatlakozása.

Funkció:

A megajánlott szerelvény biztosítsa az oszlop transzformátorállomás (T.P.C.) transzformátorának középfeszültségű csapján történő csatlakoztatását FAM kezelőrúd segítségével.

Szabadvezetéki leágazó csupasz vezetékre 25-95/25-95 mm² keresztmetszetre.

Funkció:

Az áramkötő szerelvény biztosítsa a csupasz 22-35 kV-s szabadvezetékek csavaros leágaztathatóságát.

Előreformázott műanyag tartókötés nyakhornyos szigetelőre, 50 mm² BSZV-hez.

Előreformázott műanyag tartókötés nyakhornyos szigetelőre, 95 mm² BSZV-hez.

Funkció:

A megajánlott szerelvények biztosítsák a burkolattal rendelkező 22-35 kV-os szabadvezetékek rögzítését a tetszőleges iránytörésben (0°-30°) elhelyezett Ø56 mm nyakhornyú műgyanta tartószigetelőkre.

Átszúrós leágazó áramkötés burkolt 22 kV-os szabadvezetékre, 50-95 mm² BSZV-hez.

Funkció:

A megajánlott szerelvény biztosítsa a burkolt 22 kV-os szabadvezetékekről a leágazások elkészítését a Szv leágazó köf csup FAM 25-95/25-95 mm2 szerelvényével, valamint feszültség kémlelési és rövidzárási pontként is szolgálhasson.

Szabadvezetéki végkötés szorító 25-50 mm² vezetékre.

Szabadvezetéki végkötés szorító 50-95 mm² vezetékre.

Funkció:

A szerelvények biztosítsák a csupasz kisfeszültségű szabadvezetékek kötélszíves, vagy szigetelős végfeszítésénél a vezetékhurok kicsúszás-biztos rögzítését.

Szabadvezetéki végfeszítő kisfeszültségű csupasz 25 mm² AASC vezetékre.

Szabadvezetéki végfeszítő kisfeszültségű csupasz 35 mm² AASC vezetékre.

Szabadvezetéki végfeszítő kisfeszültségű csupasz 50 mm² AASC vezetékre.

Szabadvezetéki végfeszítő kisfeszültségű csupasz 95 mm² AASC vezetékre.

Funkció:

A szerelvény sérülésmentesen biztosítsa a 25, 35, 50 és 95 mm² keresztmetszetű csupasz alumínium vezetékek közvetlen végfeszítését.

Szabadvezetéki leágazó csupasz vezetékre, közvilágítási hálózatra 25-95/10-35 mm² vezetékhez.

Funkció:

A szerelvény biztosítsa a csupasz kisfeszültségű hálózaton a közvilágítási lámpatestek, valamint a hálózat más elemén az érintésvédelmi (ÉV) kötések készítését.

Szabadvezetéki lengőtartó kisfeszültségre 2-4x(25-95)+25 mm² vezetékkötegre 30 fokos törésig

Funkció

A szerelvények biztosítsák a tetszőleges feszítési megoldású, szigetelt kisfeszültségű szabadvezetékek rögzítését a tartó, saroktartó oszlopokon elhelyezett tartóhorgokhoz.

Szabadvezetéki lengőtartó görgős 4x25-95+25 mm² vezetékkötegre 90 fokos törésig.

Funkció

A szerelvények biztosítsák a 2-4 szálfeszítésű, szigetelt kisfeszültségű szabadvezetékek görgős terítését és függesztését a saroktartó oszlopokon elhelyezett tartóhorgokhoz.

Szabadvezetéki végfeszítő kisfeszültségű szigetelt hálózatra, 4x50-95 mm² vezetékkötegre.

Funkció:

A szerelvény sérülésmentesen biztosítsa a négyszál feszítésű, kisfeszültségű szabadvezeték közvetlen végfeszítését a feszítő, sarokfeszítő oszlopokon elhelyezett feszítőhoroghoz.

A kengyeles felfogatási lehetőség bontható legyen, zárt szembe is lehessen rögzíteni.

Szabadvezetéki végfeszítő kisfeszültségű szigetelt 2x16-4x25 mm² vezetékkötegre

Funkció:

A szerelvény sérülésmentesen biztosítsa a két-és négyszál feszítésű, kisfeszültségű fogyasztói csatlakozások közvetlen végfeszítését az oszlopokon elhelyezett feszítőhoroghoz 2 kN feszítő erő elviselése mellett. A rögzítés felöli oldalon az akasztó fül nem lehet műanyagból. A zárt kengyeles felfogatási lehetőség kizáró szempont.

A vezetékköteg behelyezése a végfeszítő szerelvény egyik oldalán legyen biztosított, ezáltal a feszítő kampó nem dörzsölheti ki a vezeték szigetelését.

Szabadvezetéki végfeszítő kisfeszültségű szigetelt 2x16-4x25 mm² vezetékkötegre

Funkció:

A szerelvény sérülésmentesen biztosítsa a két-és négyszál feszítésű, kisfeszültségű fogyasztói csatlakozások közvetlen végfeszítését az oszlopokon elhelyezett feszítőhoroghoz 8 kN feszítő erő elviselése mellett. A rögzítés felöli oldalon az akasztó fül nem lehet műanyagból. A zárt kengyeles felfogatási lehetőség kizáró szempont.

1.Szabadvezetéki leágazó áramkötő kisfeszültségű szigetelt fogyasztói csatlakozásokra 25-95/10-25mm² vezetékre

2.Szabadvezetéki leágazó áramkötő kisfeszültségű szigetelt 50-95/50-95mm² vezetékre

3.Szabadvezetéki leágazó áramkötő kisfeszültségű szigetelt közvilágításra 25-95/2,5-4mm² vezetékre

Funkció:

1. A szerelvény biztosítsa a szigetelt kisfeszültségű szabadvezetékekről fogyasztói csatlakozók csavaros, tömített leágaztathatóságát.

2. A szerelvény biztosítsa a szigetelt kisfeszültségű szabadvezetékekről hálózati csatlakozók csavaros, tömített leágaztathatóságát.

3. A szerelvény biztosítsa a szigetelt kisfeszültségű szabadvezetékekről közvilágítási berendezések csavaros, tömített leágaztathatóságát.

Szabadvezetéki szigetelt csavaros toldó nem húzószilárd 10-35 mm2 vezetékre

Funkció:

Rekonstrukciók során a szerelvénynek biztosítania kell a kisfeszültségű fogyasztói csatlakozások nem húzószilárd, csavaros oszlopközeli toldását.

Szabadvezetéki szigetelt kettős leágazó fogyasztói csatlakozáshoz 25-95/2x10-35 mm2 vezetékre

Szabadvezetéki szigetelt négyes leágazó fogyasztói csatlakozáshoz 25-95/2x10-35 mm2 vezetékre

Funkció

A megajánlott szerelvényeknek biztosítaniuk kell a kisfeszültségű fogyasztói csatlakozások indítását kettő-illetve négy szigetelt vezetékkel egy szigetelt fővezetékről.

1. Szabadvezetéki leágazó áramkötő kisfeszültségű csupaszról-szigetelt 25-95/2,5-4mm2 vezetékre

2.Szabadvezetéki leágazó áramkötő kisfeszültségű csupaszról-szigetelt 25-95/10-35mm2 vezetékre

3. Szabadvezetéki leágazó áramkötő kisfeszültségű csupaszról-szigetelt 50-95/50-95mm2 vezetékre

4.Szabadvezetéki leágazó áramkötő kisfeszültségű szigeteltről-csupasz 25-95/10-35mm2 vezetékre

Funkció:

1. A megajánlott szerelvény biztosítsa a közvilágítási berendezések csavaros leágaztathatóságát csupasz kisfeszültségű szabadvezetékről szigetelt vezetékre.

2. A megajánlott szerelvény biztosítsa a fogyasztói csatlakozók csavaros leágaztathatóságát csupasz kisfeszültségű szabadvezetékről szigetelt vezetékre.

3. A szerelvény biztosítsa a csupasz kisfeszültségű szabadvezetékek hálózati csavaros, leágaztathatóságát szigetelt vezetékre.

4. A szerelvény biztosítsa a csavaros leágazást szigetelt kisfeszültségű vezetékekről, kisfogyasztói csatlakozás lecsupaszított 10mm2 vezetékvégre.

Szabadvezetéki leágazó áramkötő kisfeszültségű szigetelt-csupasz 50-95/50-95mm2 vezetékre

Funkció:

A szerelvény biztosítsa a szigetelt kisfeszültségű szabadvezetékek hálózati csavaros, leágaztathatóságát csupasz vezetékre a nullázások kialakításához. Amennyiben a szerelvény kialakítása megegyezik a 21/3. altermékkel, és annak fő- és leágazási oldala megfordítható, úgy azonos típus megajánlható, és a szerelési próbáját külön nem tartjuk meg.

Csupasz szabadvezetéki hálózaton nulla, védőföld és a lámpakar nullázás bekötésére szolgáló szerelvény.

Funkció

A közvilágítási lámpatestek tömlővezetékeinél szolgál a nulla, a földelés, valamint a lámpakar ÉV bekötésére.

Egy szerelvénynek kell fogadni a tömlővezeték kis keresztmetszetű réz ereit, és a nagyobb keresztmetszetű érintésvédelmi csupasz Al vezetéket.

Szigetelt szabadvezetéki hálózaton nulla, védőföld és a lámpakar nullázás bekötésére szolgáló szerelvény.

Funkció

A közvilágítási lámpatestek tömlővezetékeinél szolgál a nulla, a földelés, valamint a lámpakar ÉV bekötésére.

Egy szerelvénynek kell fogadni a tömlővezeték kis keresztmetszetű réz ereit, és a nagyobb keresztmetszetű érintésvédelmi csupasz Al vezetéket.

1. Szigetelt kisfeszültségű szabadvezetéki leágazó szerelvény földelés-rövidrezárás számára, nulla vezetőre

2. Szigetelt kisfeszültségű szabadvezetéki leágazó szerelvény földelés-rövidrezárás számára, fázis vezetőkre

Funkció

1. A nulla vezetőre kerülő szerelvény műanyag szigetelésének anyagában színezettnek kell lennie, mely kék, vagy sárga színű lehet.

2. A fázisvezetőkre kerülő szerelvény műanyag szigetelésének anyagában színezettnek, fekete színűnek kell lennie.

Szabadvezetéki szigetelt zárósapka 25-95 mm2 vezetékre

Funkció:

A megajánlott termék biztosítsa a megszabott NFA2X vezetékvégek szigetelt, vízzáró módon történő lezárását.

1.A síncsatlakozó kábel saru 2x35-120 mm2 Al vezeték csatlakoztatására alkalmas elosztószekrényekben, sínekhez.

2. A síncsatlakozó 16-120 mm2 Al vezeték csatlakoztatására alkalmas elosztószekrényekben, sínekhez.

3. A síncsatlakozó 2x50-240 mm2 Al vezeték csatlakoztatására alkalmas elosztószekrényekben, sínekhez.

Funkció:

A síncsatlakozó szerelvények az üzemviteli munkák során szükséges Al vezetékek és kábelerek csatlakoztatására elosztószekrényekben, alumínium vagy ónozott réz sínekhez, szakaszoló kapcsolókban és KÖF/KIF transzformátorok kivezetésein.

Operation of electrical installations

Bács-Kiskun Megyei Rendőr-főkapitányság | Published January 20, 2017  -  Deadline February 9, 2017

"The IBH private business providing electricity supply to part of the operation of 22 kV (MV) and 0.4 kV (LV)" - Bács-Kiskun county, in the framework of a contract for a period of 36 months.

Part 2 bid round.

Part 1: "The IBH private business providing electricity supply to part of the operation of 22 kV (MV)" - Bács-Kiskun county, in the framework of a contract for a period of 36 months.

Part 2: "The IBH private business providing electricity supply to part of Operation 0.4 kV (LV)" - Bács-Kiskun county, in the framework of a contract for a period of 36 months.

All:

Overhead and underground cable network (km): 98 + 11 km option.

MV / LV transformer station (number): 21 + 4 option.

Infrastructure operation cabinet (pieces): 120 + 14 option.

The operation of the equipment includes malfunctions, diagnostic testing, maintenance and troubleshoot the claim in the procurement documents dies.

Repair and maintenance services of electrical and mechanical building installations

Magyar Államkincstár | Published December 20, 2016  -  Deadline February 3, 2017

operated by the Hungarian State Treasury buildings and air-conditioning systems and equipment maintenance, repair, renovation and operational activities "in the documentation indicated below.

The air-handling systems and equipment maintenance, repair and operation activities shall be provided at the following locations operated by the Hungarian State Treasury's premises:

Center:

- 1054 Budapest, Hold utca 4 (monument)

- 1054 Budapest, Hold utca 7,

- 1054, Hunter Street 16th

Bekes County:

- 5600, Liberty Square 7-9.

- 5600, Dózsa György út 1. (locally protected).

Csongrad County:

- 6720 Szeged, Castle Street 5 (monuments, locally protected)

- 6720 Szeged, Széchenyi tér 9. (monument).

Zemplén County: County:

- 3525 Miskolc, Pálóczy László utca 5,

- 3525 Miskolc, Heroes 3rd

Heves county:

- 3300, 5 square Esterhazy,

- 3300, Telekessy Istvan utca 2,

- 3300, Sandor Petofi street 40th

Bihar County:

15th

Nograd county:

- 3100, Rákóczi út 13.,

- 3100, Rákóczi road 15th

Jasz-Nagykun-Szolnok County:

- 5000, Magyar utca 8,

- 5000, Park Road 6th

Szabolcs-Moson-Sopron County:

- 4400, 8 Martyrs Square - Church Street 15,

- 4400, Széchenyi utca third

Bács-Kiskun County

- 6000, Katona József tér 8.,

- 6000, Liberty Square first

The amount of per-Hungarian parts of the country:

- Window air-conditioning 20,

- Fan coil / split 903 indoor units,

- Chiller 13 db,

- 114 pieces of fan,

- 23 air handling units.

The number of buildings and the amount of established plants ranging up to + 30% change during the contract period.

The air-handling systems and equipment maintenance, repair and operation activities shall be provided at the following locations operated by the Hungarian State Treasury's premises:

Budapest and Pest County:

- 1132 Budapest, Váci út 71.,

- 1115 Budapest, Bartók Béla út 120-122.

Baranja County:

- 7621, 2nd Street 6./Vörösmarty Nun Street,

- 7621, Szigeti út 33-33 / a.

Fejér County:

- 8000, Autumn utca 11-13.

Győr-Moson-Sopron County:

- 9024 Győr, Gergely street Czuczor 26 (Baross Gábor utca 21.)

- 9024 Győr, Hunyadi utca 6 / a.

Komárom-Esztergom County:

- 2800, Main Square 32,

6th

Somogy County:

- 7400, Kossuth tér 7-8.

- 7400, 5th Field Street,

- 7400, Széchenyi tér 3-4.

Tolna County:

- 7100, Augusz Imre utca 7,

48-52. / Találka Square 11th

Vas county:

- 9700, Hefele Menyhért utca 3-5.

- 9700, Szell Kalman utca 20 (locally protected).

Veszprem County:

- 8200, to Budapest 4th

Zala county:

- 8900 Zalaegerszeg, Decorative Square 7,

- 8900 Zalaegerszeg, Flower Benedek utca 5 / b.

Quantity of West Hungary parts per country:

- Window air-conditioning 0 db,

- Fan coil / split 994 indoor units,

- Chiller 13,

- Fan 83

- AHU 14th

The number of buildings and the amount of established plants ranging up to + 30% change during the contract period.

Electricity

Nagykanizsa Megyei Jogú Város Önkormányzata | Published December 22, 2016  -  Deadline January 27, 2017

Purchase contract for the sale of electricity.

Klara Fröhlich, registered number: 00321st

the expected amount of electricity produced by the HMKE's expected to reduce the amount of electricity consumption.

The difference in consumption is expected to be managed on the basis of current production systems HMKE together for the consumer sites.)

The portfolio will be specifically mentioned in the Annex consumption sites KLIK treatment is expected after 1 January 2017, as a result of which the prospective trader must deal with the possible name change or change of needs, without the Contracting Authority from any penalty origin.

Energy demand continuous service - for lighting public lighting calendar - adjusted and profile.

The electricity delivery place: Hungarian electricity transmission network.

Inspection performance, quantities: time-series T-consumption sites curves electronically for 12 months, and the time line and no time-line tapping are annual consumption data, consumption of the public lighting network data sites are according to the specifications given.

Electricity

Alföldvíz Zrt. | Published December 23, 2016  -  Deadline January 27, 2017
24:00 CET for the period, full supply, scheduled within the framework of consumer wireless transmission of electricity purchase contract. 

The number of contracting covered by the contract for consumer sites - below - quantitative limits, taking into account the change, about which - time-limits for the relevant statutory provisions and other regulations compliance - the contractor shall notify in writing who is bound to the announced changes to take note of and act according to them .

Total quantity to be supplied electricity

. Plain Water Co. for 42 GWh.

. Bácsvíz Ltd. for 22 GWh.

The net energy charge:

- Includes the full requirements of the contracting production and marketing costs corresponding amount of electricity, including balance group membership fee of balancing energy fees and the cost of measurement data, but is not included in § 13 of Electricity Act states that a contractor under obligatory reception additional costs resulting from the price fixed by specific legislation supported by falling electricity,

- Not included in the VET 9-13. § in-defined and 389/2007 (XII.23.) Government decree and 1/2016. (I.27.) In Regulation NFM energy, renewable energy sources and wastes generated electricity, as well as to the generated electricity transmission system operator, to promote the production of required electricity to be purchased by the dealer (FIT) the amount and cost of regulation,

Contractor without surcharges may differ from the total amount within the tolerance band under contract.

50.§ task (2) and 61.§ (4)) .This fulfilled the conditions of performance, the manner expected to be issued as part of the procurement documents, technical specifications and draft contract included.

Electricity

Szociális és Gyermekvédelmi Főigazgatóság | Published December 23, 2016  -  Deadline January 31, 2017

operated by contracting consumption places for full-board basis in the context of sale and purchase agreement 27.62346 million kWh + 50% amount of electricity 05.01.2017. 00:00 and 04/30/2018. period.

Winning bidders must treat the entire contract amount in total for all sites use 27.62346 million kWh + 50% of all institutions listed in Annex 1 procurement documents involved in the procurement process with respect.

operated by contracting consumption sites for full board in the context of contract-based selling 41,435,206 kWh (which contains 50% option) amount of electricity 05.01.2017. 00:00 and 04/30/2018. period.

Contractor of the total contract amount of 41,435,206 kWh (which contains 50% option) any place of use for all institutions listed in Annex 1 procurement documents involved in the procurement process must be treated with respect for each category.

Electricity

Pápa Város Önkormányzata | Published January 3, 2017  -  Deadline February 3, 2017

Electricity sales contract Pope Municipality, as well as Pope Municipality City Trust for the Hungarian electricity transmission network is constantly available to use local connection characteristics of the right quality, general (institutional) (Part 1) and public lighting purposes (second purchase part) use electricity (commercial relationship with purchase) 03/01/2017. (0:00) - 12.31.2018. within the framework of full supply electricity without, scheduling commitments for the period (24:00) sale and purchase agreement, which includes the accounting system of user charges.

§ 61 (4). Based on examination of parts under sub-contracting ensures the bidding.

Other legislation: the technical description of procurement documents.

The number of consumer spaces: 70 pcs.

The exact requirements for procurement of technical subject matter includes a description of the tender documentation.

The license verifies the existence of the contracting records of the Hungarian Energy and Utilities Regulatory Agency.

The contract price includes the cost of any service broadcast invoicing as well.

energy, renewable energy sources and waste funds referred 147 §-in, energy tax, VAT and other taxes, levies, fees, charges and expenses, as well as the relevant prevailing legislation may arise under the relevant legislation set out has been generated electricity in order to promote the production of energy, the transmission system operator compulsorily purchased by the electricity Trading (FIT) the amount and cost of regulation.

According to § 76 paragraph (5) for the contracting of electricity is a product which only corresponds to one of quality and technical requirements, the specific and the selection of the most economically advantageous tender in that case, additional quality features not only serve the lowest price rating.

The number of consumption places: 5.

The exact requirements for procurement of technical subject matter includes a description of the tender documentation.

The license verifies the existence of the contracting records of the Hungarian Energy and Utilities Regulatory Agency.

The contract price includes the cost of any service broadcast invoicing as well.

energy, renewable energy sources and waste funds referred 147 §-in, energy tax, VAT and other taxes, levies, fees, charges and expenses, as well as the relevant prevailing legislation may arise under the relevant legislation set out has been generated electricity in order to promote the production of energy, the transmission system operator compulsorily purchased by the electricity Trading (FIT) the amount and cost of regulation.

§ 61 (4). Based on examination of parts under sub-contracting ensures the bidding.

Other legislation: the technical description of procurement documents.

According to § 76 paragraph (5) for the contracting of electricity is a product which only corresponds to one of quality and technical requirements, the specific and the selection of the most economically advantageous tender in that case, additional quality features not only serve the lowest price rating.

Electricity

Székesfehérvár Városgondnoksága Kft. | Published December 31, 2016  -  Deadline February 7, 2017

Purchase and sale of electricity Székesfehérvár city's public lighting network (active elements) to power and area lighting purposes, within the framework of the electricity purchase contract without scheduling obligation, 28/02/2017. 28/02/2018 24:00 PM. 24:00.

Purchase and sale Székesfehérvár electricity to power street lighting network, as well as background lighting purposes. energy below 1-year term of the agreement consumption: 5,407,004 kWh minus 20%.

Electricity

Országos Mentőszolgálat | Published December 31, 2016  -  Deadline February 9, 2017

The National Ambulance Service to supply electricity 01.03.2017. 00:00 - 02/28/2019. 24:00 period, full supply of electricity within the framework of the purchase contract.

Purchases of electricity a total of 5.2 million kWh / year + 20% of 01/03/2017 to the contracting authority. 00:00 - 02/28/2019. For the period 24:00 pm, full supply, scheduled within the framework of consumer wireless transmission of electricity purchase contract.

The contract price includes the border crossing fee, the balance circle membership fee, LXXXVI 2007 on electricity. TV. 9-13. as defined in §-and 389/2007. energy (XII.23.) Government decree regulated, renewable energy sources and wastes generated electricity, as well as to the generated electricity transmission system operator, to promote the production of required electricity to be purchased by the dealer (FIT) the amount and cost of regulation. The contract price does not include the system of user charges in 2007 LXXXVI. TV. funds as defined in § 147, of the energy tax, VAT and other taxes, levies, fees, charges and expenses that may arise from the legislation.

Evaluation criteria: Contracting Yes. § 76th According to (2) a) evaluate the bids and selects the most economically advantageous tender for referring to the PPA. § 76 (5). The contracting needs of quality and technical requirements specific to the acquisition as the subject of a specific good meet, in addition to the selection of the most economically advantageous tender solely for the lowest price assessment, given that the standard product and additional quality criteria specified in the commodity law and defined according indistinguishable.

Electricity

Budapest Főváros VII. kerület Erzsébetvárosi Polgármesteri Hivatal | Published December 24, 2016  -  Deadline January 27, 2017

Buying power of Budapest VII. Elizabeth City District Mayor's Office, City of Budapest VII. Elizabeth District Municipality of economic institutions and companies under full board (for a limited time) based electricity trading contracts.

Buying power of Budapest VII. Elizabeth City District Mayor's Office, City of Budapest VII. Elizabeth District Municipality of economic institutions and companies under full board (for a limited time) based electricity trading contracts.

The amount of electricity to be procured (with no extension of the contract period): 3,498,903 kWh.

The number of connection points: 106.

Electricity

Médiaszolgáltatás-támogató és Vagyonkezelő Alap | Published January 7, 2017  -  Deadline January 25, 2017

obtain electricity connection points for the MTVA part of a commercial contract, without giving a timetable consumer 01/04/2017 Standard quality (meeting the requirements of BS 2002 standards EN 50160: 2011 and BS 1). - 08.31.2018. period.

The subject of the public procurement: Overall, 16.9 GWh of standard quality (to DIN EN 50160: 2011 and BS 1: 2002 in conformity standards) obtain electricity connection points for the MTVA part of a commercial contract, without the consumer broadcast schedule of 04/01/2017. - 08.31.2018. period.

the duration of the contract amount of electricity to the entire quantity specified here in may differ +/- 10%, that of 1711/2015. Based on (X.5.) Government decision to change the points of consumption under the contract and / or the contract period, which is subject to the Contracting Authority reserves the PPA. According to § 141 paragraph (4) a) the possibility of amending the contract, that the main volume in the invitation to tender (16.9 GWh) vary in proportion to changes in the connection points.

Bidders will inform the contracting authority that, in the event that all of the tasks of state-owned real estate ownership is not necessary to return to the Exercise of 1711/2015. Based terminated (X.5.) government decree, the total amount of 11.6 GWh per 12 months (+/- 10%) is amended.

The number accounted for in accordance with the distribution of consumption profile locations to more than 25 pieces.

The detailed requirements include supplies related to compliance with the procurement documents.

Electricity

Kecskemét Megyei Jogú Város Önkormányzata | Published January 7, 2017  -  Deadline February 9, 2017

operating Kecskemét City administrative area of ​​public lighting network and router equipment electricity supply.

The operating Kecskemét City administrative area of ​​public lighting network, electricity supply to the Hungarian transmission network is constantly available, standard quality, full supply, with consumer electricity purchase contract with no scheduled broadcast.

draft power purchase agreement contract with detailed conditions specified by the contracting documentation.

Contracting the specified amount by 40% (-40%) without penalty may differ from the negative direction.

shipping and delivery obligations of the place of performance of the electricity trading on the Hungarian Power System (VER) Transfer Network.

Technical characteristics of electricity for which the present procurement transport, inspection benchmarks contained in the documentation.

The operating Kecskemét City administrative area of ​​traffic control devices electricity supply to the Hungarian transmission network is constantly available, standard quality, full supply, with consumer electricity purchase contract with no scheduled broadcast.

draft power purchase agreement contract with detailed conditions specified by the contracting documentation.

Contracting the specified quantity positively by 50% (+ 50%) without penalty may differ.

shipping and delivery obligations of the place of performance of the electricity trading on the Hungarian Power System (VER) Transfer Network.

Technical characteristics of electricity for which the present procurement transport, inspection benchmarks contained in the documentation.

Electricity

Médiaszolgáltatás-támogató és Vagyonkezelő Alap | Published January 18, 2017  -  Deadline January 25, 2017

obtain electricity connection points for the MTVA part of a commercial contract, without giving a timetable consumer 01/04/2017 Standard quality (meeting the requirements of BS 2002 standards EN 50160: 2011 and BS 1). - 08.31.2018. period.

Buying electricity

Budapest Főváros VII. kerület Erzsébetvárosi Polgármesteri Hivatal | Published December 30, 2016  -  Deadline January 27, 2017
Buying electricity

Electric power purchases in 2017

Nagykanizsa Megyei Jogú Város Önkormányzata | Published December 28, 2016  -  Deadline January 27, 2017
Electric power purchases in 2017