Electrical Repairs at HMP Channings Wood

Ministry of Justice (MoJ) Procurement - CMT SW&W | Published February 18, 2015
Winner
David R White Builders , DT3 5QA
cpvs
45000000

Electrical repairs to the recycling plant at HMP Channings Wood

Yorkshire Housing Ltd - Boiler renewals, electrical periodic testing & remedial works, smoke alarms & external lights - PP781

Yorkshire Housing | Published May 13, 2016  -  Deadline May 20, 2016
cpvs
31527200

The provision of: 1)Boiler renewals, 2)electrical periodic testing & remedial works, 3)smoke alarms 4)external lights For Yorkshire Housing - reference PP781

16/043 - MTC Mechanical and Electrical Maintenance and Minor Works

 | Published June 16, 2016  -  Deadline July 18, 2016
cpvs
50710000

The University of Portsmouth invites Expressions of Interest from suitably qualified and experienced companies wishing to tender for the Mechanical and Electrical Maintenance and Minor Works contract throughout the University for a period of 3 years plus 2 year. The contract will include the maintenance of Buildings Services for the UoP diverse estate of 95 buildings. In addition to this routine work there will be reactive repairs and minor works. There will also be a requirement to meet specified response times due to emergency repairs. The contract is expected to be in the region of £1.4M per annum based on the average expenditure over the last three years of which £450k is estimated to be routine maintenance. Please note, all that is currently required is the completion of the PQQ document. If you are successful in your PQQ response, you will be sent the ITT stage. The ITT documents are attached for Information purposes only. To Express an Interest in this project please register on the University of Portsmouth In-Tend webpage and express an interest in this project. Please find the weblink for our webpage below: https://in-tendhost.co.uk/port/

Electrical Rewires (2017-2020) - PROC17013

South Derbyshire District Council | Published August 7, 2017  -  Deadline September 7, 2017
cpvs
45000000, 50000000, 51000000,

South Derbyshire District Council is seeking to appoint a principal contractor to undertake electrical rewires with associated minor repairs, mainly to occupied and void domestic properties within South Derbyshire. The contract shall be for a three year period with an option to extend for up to a further two years. The commencement date is expected to be the 1st October 2017 Current budgets anticipate between 125 and 150 rewires per financial year, which are subject to annual budgets and approvals.

Hardware in the Loop Simulation platform for Energy Storage and Electrical Systems Simulation

 | Published July 26, 2016  -  Deadline August 25, 2016
cpvs
30211300

The University of Warwick, Warwick Manufacturing Group, has a requirement for two real-time hardware-in-the-loop (HIL) simulators: • HIL unit (A) – General purpose HIL simulator to underpin electronic control unit (ECU) verification. • HIL unit (B) – This unit will share the same functionality as HIL (A), but will also have the added capability to simulate very high performance physical models of electrical systems using an FPGA based approach to real-time simulation. Please refer to http://in-tendhost.co.uk/universityofwarwick for further information. You will be able to download the full tender documents from this site. Any queries in relation to this requirement should be directed to the University of Warwick via the correspondence functionality of our e-tendering system. Failure to do so may result in queries being excluded from the procedure. This is an ABOVE EU threshold tender In order to express interest in this opportunity please go to the University of Warwick In-Tend supplier portal (https://in-tendhost.co.uk/universityofwarwick). All queries must be sent via In-tend Correspondence and not directly to University staff. NOTE: The University of Warwick is not a contracting authority for the purposes of the Public Contracts Regulations 2015 (as amended) and its procurement activities are not subject to the Public Contracts Regulations 2015 or the obligations under the European Public Procurement Directives, including the European Remedies Directive. Should the University advertise contracts in the Official Journal of the European Union, this is at the sole discretion of the University and is undertaken on a voluntary basis with no implied obligation to comply with the procurement legislation. All bids must be received by midday 25th August 2016

Contract for the Provision of Building Maintenance and Repair Services.

South Tyneside College | Published September 24, 2015  -  Deadline October 21, 2015
cpvs
50711000, 50712000, 50720000, 50730000, 50700000, 50000000

Planned preventative and responsive maintenance for all electrical, heating, water, plumbing systems, air conditioning, ventilation systems and building fabric components.

Contract for the Provision of Building Maintenance and Repair Services.

South Tyneside College | Published September 24, 2015  -  Deadline October 16, 2015
cpvs
50711000, 50712000, 50720000, 50730000, 50700000, 50000000, 50711000, 50712000, 50720000, 50730000, 50700000, 50000000, 50711000, 50712000, 50720000, 50730000, 50700000, 50000000, 50711000, 50712000, 50720000, 50730000, 50700000, 50000000, 50711000, 50712000, 50720000, 50730000, 50700000, 50000000

Planned preventative and responsive maintenance for all electrical, heating, water, plumbing systems, air conditioning, ventilation systems and building fabric components.

Contract for the Provision of Building Maintenance and Repairs.

South Tyneside College | Published February 25, 2016
Winner
P F Burridge & Sons Ltd
cpvs
50711000, 50712000, 50720000, 50730000, 50700000, 50000000

Planned preventative and responsive maintenance for all electrical, heating, water, plumbing systems, air conditioning, ventilation systems and building fabric components.

Business Support Space, Westfield Centre, South Elmsall, West Yorkshire

South Elmsall Town Council (WBSP) | Published October 23, 2014  -  Deadline November 11, 2014
cpvs
45000000, 44000000

Works to include replacement internal doors, replacement sanitary equipment, minor works to stud walling, replacement PVC windows, minor electrical works, repairs to plaster, new carpets, painting and decorating. The full specification for the works is to be found in the supporting documents. Any problems accessing any information, please phone 01977 642335 for assistance.

Operation of a refuse site

South Tyneside Council | Published April 12, 2017  -  Deadline May 12, 2017
cpvs
90530000, 90510000

The Recycling Village is provided to discharge the Authority's statutory duty under Section 51 of the Environmental Protection Act 1990.

The facility comprises 5 aspects:

1. A covered tipping area with a wide range of containers in which to deposit materials brought onto the Recycling Village, with the emphasis on material segregation and storage.

2. The transport of collected materials to various destinations to enable its processing or disposal.

3. A ‘Bring Site’ for recyclable materials.

4. Reception and storage areas for Waste Electrical and Electronic Equipment (WEEE) and Post-Consumer Batteries.

5. The Windmill Warehouse, operated by the Authority's partner, Groundwork, acts as a catalyst for environmental, recycled and reclaimed products and information about the environment.

The Authority requires a Service that will primarily assist with the first and second aspects set out above, but which will also contribute to the successful and efficient operation of the others.

Operation of a refuse site

South Tyneside Council | Published November 16, 2017
Winner
Remondis JBT Ltd
cpvs
90530000, 90510000

The Recycling Village is provided to discharge the Authority's statutory duty under Section 51 of the Environmental Protection Act 1990.

The facility comprises 5 aspects:

1. A covered tipping area with a wide range of containers in which to deposit materials brought onto the Recycling Village, with the emphasis on material segregation and storage.

2. The transport of collected materials to various destinations to enable its processing or disposal.

3. A ‘Bring Site’ for recyclable materials.

4. Reception and storage areas for Waste Electrical and Electronic Equipment (WEEE) and Post-Consumer Batteries.

5. The Windmill Warehouse, operated by the Authority's partner, Groundwork, acts as a catalyst for environmental, recycled and reclaimed products and information about the environment.

The Authority requires a Service that will primarily assist with the first and second aspects set out above, but which will also contribute to the successful and efficient operation of the others.

The Contractor provides the staff, operates and manages the Recycling Village and provides the transport as and when required to deliver the sorted waste material to end outlets specified by the Authority, with the Contractor incentivised to maximise recycling performance. The Authority bears any disposal costs/receives any income from the outlets in respect of material delivered there.

FRAMEWORK 1 FOR CARRYING OUT OF MINOR ADAPTATIONS IN DOMESTIC PROPERTIES

South Tyneside Council | Published October 17, 2017  -  Deadline June 9, 2017
Winner
DR builders
cpvs
45000000

South Tyneside Council wish to establish a framework agreement for the supply, installation of minor adaptations for domestic properties The framework agreement will be divided into three lots as follows: - Lot 1 - Small Electrical Works Lot 2 - Plumbing/ Bathroom works Lot 3 ¬¬- Internal Joinery Works Tenders may bid for one or more lots. It is envisaged there will be a maximum of 5 suppliers appointed to the framework for lots 1 - 3. The suppliers will be ranked from 1 to 5

University of Sunderland - Centre for Advanced Manufacture M&E Consultants

University of Sunderland | Published May 3, 2016  -  Deadline June 3, 2016
cpvs
71300000

There is a real renaissance currently underway in Sunderland, which is apparent in both the arts and local culture, as well as in the automotive, manufacturing and digital technologies arena. Greater levels of investment are being encouraged through a number of city-led initiatives to transform Sunderland, such as the recently announced 3,6,9 Vision and the Economic Masterplan for the city. Over the coming years, Sunderland will need to invest in the right education and training to drive innovative businesses within the region, creating more jobs for individuals who have the skills to meet that demand. It is in this context that the University of Sunderland has identified the development of its Advanced Manufacturing proposition as an area for strategic investment. The development of a new Centre for Advanced Manufacturing on the St Peter’s Riverside site has been identified as the key physical investment to realise this vision, with a GIFA of 6,500m² and construction budget of £14m exclusive of VAT but inclusive of client fit-out. The floor area and budget are both subject to review during Stage 2 of the project development. This project currently aims to complete in September 2018 subject to programme changes following the Stage 2 consultations, with a start on site in spring 2017, though the completion date may be put back to January 2019. This should be confirmed at the end of Stage 2. The University of Sunderland seeks to appoint an experienced team of Mechanical and Electrical Consulting Engineers to support the development of the New Centre for Advanced Manufacture.

Heating Maintenance and Installations Contracts (2017-2020) - PROC17005

South Derbyshire District Council | Published May 9, 2017  -  Deadline June 8, 2017
cpvs
45000000, 50000000,

South Derbyshire District Council is seeking to appoint one or two principal contractors to undertake our: Lot 1 – Heating Maintenance contract – safety checks, repairs and maintenance to all properties. Lot 2 – Heating Installations contract – approximately 78 full gas heating installations and 55 boiler upgrades per annum. Lot 3 – both of the above. The Council has 3015 properties that have mainly gas fired heating systems, with smaller numbers of solid fuel, oil, biomass, ground source, air source, and electrical storage heating systems. The works shall also include the commercial gas boilers within the Council offices. The contracts shall be for a three year period with an option to extend for up to a further two years. The commencement dates may be phased with installations commencing in July 2017 and the safety checking, repairs and maintenance works commencing in January 2018.

Construction structures and materials; auxiliary products to construction (except electric apparatus)

South Tyneside Council | Published January 8, 2015
Winner
<CONTACT_DATA_WITHOUT_RESPONSIBLE_NAME><ORGANISATION><OFFICIALNAME>Civils and Lintels</OFFICIALNAME></ORGANISATION><TOWN>South Shields</TOWN><COUNTRY VALUE="UK"/></CONTACT_DATA_WITHOUT_RESPONSIBLE_NAME>
cpvs
44000000

Manufacture and supply of precast concrete kerbs and supply of aggregates.
  • 1