Public tenders for electrical in Bracknell United Kingdom

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

Inspection, Testing and Maintenance of Electrical Installations and Emergency Lighting Systems.

Bracknell Forest Borough Council | Published July 14, 2017
cpvs
31000000

The Council are looking to appoint a contractor to inspect, test and maintain the Council's various emergency lighting systems. The service to be provided will involve multiple sites. and include the supply and installation of all replacement parts. The appointed contractor will also provide an emergency call out facility. II.1.6) Information about lots This contract is divided into lots: Yes II.1.7) Total value of the procurement Value excluding VAT: 400 000.00 GBP II.2) Description Lot No: 1 II.2.2) Additional CPV code(s) 31500000 II.2.3) Place of performance NUTS code: UKJ11 II.2.4) Description of the procurement The Contract is for an initial period of 3 years with the option to extend for a further period of 1 year. (3+1 totalling a maximum of 4 years). II.2.5) Award criteria Quality criterion: See procurement documents / Weighting: 50 Cost criterion: See procurement documents / Weighting: 50 II.2.11) Information about options Options: No II.2.13) Information about European Union funds The procurement is related to a project and/or programme financed by European Union funds: No Section IV: Procedure IV.1) Description IV.1.1) Type of procedure Restricted procedure IV.1.3) Information about a framework agreement or a dynamic purchasing system The procurement involves the establishment of a framework agreement IV.1.8) Information about Government Procurement Agreement (GPA) The procurement is covered by the Government Procurement Agreement: Yes IV.2) Administrative information IV.2.1) Previous publication concerning this procedure Notice number in the OJ S: 2015/S 161-295101 Section V: Award of contract A contract/lot is awarded: Yes V.2 Award of contract V.2.1) Date of conclusion of the contract 22/01/2016 V.2.2) Information about tenders Number of tenders received: 4 The contract has been awarded to a group of economic operators: No V.2.3) Name and address of the contractor SSE Enterprise Ltd Reading RG7 4AH UK NUTS: UKJ11 The contractor is an SME: No V.2.4) Information on value of the contract/lot (excluding VAT) Initial estimated total value of the contract/lot: 350 000.00 GBP Total value of the contract/lot: 400 000.00 GBP V.2.5) Information about subcontracting Section VI: Complementary information VI.4) Procedures for review VI.4.1) Review body Bracknell Forest Borough Council Easthampstead House, Town Square Bracknell RG12 1AQ UK E-mail: procurement.team@bracknell-forest.gov.uk VI.5) Date of dispatch of this notice 12/07/2017 Information added to the notice since publication. Additional information added to the notice since it's publication. No further information has been uploaded. Main Contact: psc@bracknell-forest.gov.uk Admin Contact: N/a Technical Contact: N/a Other Contact: N/a Commodity Categories Commodity Categories IDTitleParent Category 31000000Electrical machinery, apparatus, equipment and consumables; lightingMaterials and Products 31500000Lighting equipment and electric lampsElectrical machinery, apparatus, equipment and consumables; lighting Delivery Locations Delivery Locations IDDescription 100UK - All Alert Region Restrictions The buyer has restricted the alert for this notice to suppliers based in the following regions. Alert Region Restrictions There are no alert restrictions for this notice. Copyright © Sell2Wales Connect with us Email signup Subscribe to our email newsletter Subscribe Call us on 0800 222 9004 Accessibility| Privacy Policy & Cookies| Site map| Terms & Conditions| © Millstream Associates Limited 2017 //

Minor Repairs and Maintenance Framework.

Bracknell Forest Borough Council | Published April 14, 2017
Winner
Woods Building Services Ltd t/a AA Woods
cpvs
45343100

The Council's aim is to establish a Framework of suppliers covering a broad range of building, mechanical, electrical, maintenance and related trades. Appointed suppliers will be required to carry out minor works and maintenance to the Council's premises as and when required on a call-off basis. The premises concerned include a mix of offices, residential properties used and schools. The Council's intention is to appoint 3 suppliers per Lot, and suppliers shall not be able to tender for more than 2 Lots overall. The Framework will consist of: Lot 1: Electrical; Lot 2: Heating and Ventilation; Lot 3: General Building; Lot 4: Roofing; Lot 5: Asbestos Removals.

Minor Repairs and Maintenance Framework.

Bracknell Forest Borough Council | Published February 17, 2016  -  Deadline March 18, 2016
cpvs
90650000, 45262660

The Council's aim is to establish a Framework of suppliers covering a broad range of building, mechanical, electrical, maintenance and related trades.

Appointed suppliers will be required to carry out minor works and maintenance to the Council's premises as and when required on a call-off basis.

The premises concerned include a mix of offices, residential properties used and schools.

The Council's intention is to appoint 3 suppliers per Lot, and suppliers shall not be able to tender for more than 2 Lots overall.

The Framework will consist of:

Lot 1: Electrical;

Lot 2: Heating and ventilation;

Lot 3: General building;

Lot 4: Roofing;

Lot 5: Asbestos removals.

Minor Repairs and Maintenance Framework

Bracknell Forest Borough Council | Published April 14, 2017
Winner
Woods Building Services Ltd t/a AA Woods
cpvs
50000000, 50500000, 50531100, 50531200, 50532000, 50700000, 50711000, 50760000, 50800000, 45343100

The Council's aim is to establish a Framework of suppliers covering a broad range of building, mechanical, electrical, maintenance and related trades.

Appointed suppliers will be required to carry out minor works and maintenance to the Council's premises as and when required on a call-off basis.

The premises concerned include a mix of offices, residential properties used and schools.

The Council's intention is to appoint 3 suppliers per Lot, and suppliers shall not be able to tender for more than 2 Lots overall.

The Framework will consist of:

Lot 1: Electrical;

Lot 2: Heating and Ventilation;

Lot 3: General Building;

Lot 4: Roofing;

Lot 5: Asbestos Removals.

Inspection, Testing and Maintenance of Electrical Installations and Emergency Lighting Systems.

Bracknell Forest Borough Council | Published August 21, 2015  -  Deadline September 21, 2015
cpvs
31000000, 31500000

The Council are looking to appoint a contractor to inspect, test and maintain the Council's various emergency lighting systems. The service to be provided will involve multiple sites and include the supply and installation of all replacement parts. The appointed contractor will also provide an emergency call out facility.

Coral Reef Water-world Main Works Contract

Bracknell Forest Borough Council | Published July 5, 2016
Winner
Brymor Construction Ltd
cpvs
45453100, 45212000, 45212100, 45212212

The scope of work comprises the demolition and complete removal of the existing timber glulam beam roof over the main pool hall and replacement with a new steel truss roof which will be split into 2 sections with a centrally located roof light running the length of the roof.

It is envisaged that the new roof shall be a duo pitch standing seam roof, with an acoustic perforated deck. Each section will span away and up from the roof light towards the high level lateral glazing around the perimeter of the proposed roof. The roof void shall contain an accessible services void and walkway accessed from an adjacent roof. Mechanical, electrical and public health systems associated with the main pool hall shall be replaced and modified to suit the new roof to include a new rainwater disposal system, air handling unit and associated ductwork to the main pool, updating pumps and associated equipment, including controls, cleaning and re-fixing existing ductwork, ventilation and extract system grilles.

A section of the existing below ground drainage shall need to be diverted and the existing gas service extended to serve the flume tower plant room. The main low voltage panels shall be replaced, together with cabling and distribution boards to the main pool and new general and emergency lighting system to the main pool hall. New hard and soft external landscaping works shall be required to the perimeter of the site.

The existing ancillary roofs over the changing village, Sauna World and Coconut Grove (café) will be overhauled and repaired. The repair scope shall comprise a combination of resin injection and dowel bars to repair the existing glulam beams together with replacement bolts and replacement and or repair of the roof coverings to meet current regulations.

The existing ride tower and flumes are to be completely demolished. A new reinforced concrete frame tower and link corridor will be constructed with a launch platform at approx. 12.5m above the run out level. The tower shall be clad with a proprietary insulated wall panel system and shall have an integral lift and staircase for guests. At ground floor and basement level, a mechanical, electrical and aquatic plant room will be constructed along with a balancing tank and an aquatic riser from the plant room that connects to services riser that provides water to the flumes. New water treatment systems shall also be installed to serve the new rides.

5 new flumes will be constructed comprising an oscillating funnel slide, bowl slide, body slide, and 2 gravity ring rides The 2 new flumes will include aquatic based animation rain-bars, sprays and jets and will be supplemented by special effects with programmable light emitting diode lighting inside the flumes.

The aquatic package sub contract is subject to a separate OJEU notice. Therefore there will be a requirement for the ride vendor sub-contract to be novated into the main contract. Full details will be in the ITT.

The interior of internal public facing areas shall be completely refurbished to comprise main reception area, changing village, café, Sauna World and Lazy River. The scope of this work shall include new internal fixtures, fittings and equipment, internal wall, floor and ceiling finishes and new mechanical and electrical installations.

If you have already submitted a completed Pre-Qualification Questionnaire for this project then you do not need to submit again.

Minor Works and Maintenance

BRACKNELL FOREST COUNCIL | Published April 13, 2017  -  Deadline March 18, 2016
Winner
FJW Ltd
cpvs
31500000

The Council’s objective is to establish a Framework of suppliers covering a broad range of building, mechanical, electrical, maintenance and related trades. Such suppliers will be required to carry out minor works and maintenance to the Council’s Premises as and when required on a call-off basis, providing the Council’s Service Users with a responsive and competitively priced service. The service is split into lots and no tenderer can bid for more than 2 lots. • Electrical • Heating & Ventilation • General Builders (This will include Carpentry and Plumbing) • Roofing • Asbestos Removal The full PQQ pack can be downloaded directly from this advert and should be returned by 5pm Friday the 18th of March. Any questions raised during the PQQ stage will be posted on this site alongside the responses given.

Portable Applicance Testing

BRACKNELL FOREST COUNCIL | Published April 18, 2017  -  Deadline February 26, 2016
Winner
Hawkesworth Appliance Testing
cpvs
31600000

The appointed contractor will provide a service for the Inspection and Testing of Portable Electrical Appliances at Bracknell Forest Council Sites. The contract is for an initial 3 years plus two possible extensions of 1 year (3+1+1 =5) All tender documents can be downloaded directly from the South East Business Portal. The tender submission date is by mid day on the 26 February 2016. Questions raised by tenderers alongside the repsonses given will be posted on the South East Business Portal. The Council will not be held responsible for not informing any organisation who has not officially registered their interest on the Portal. Total contract value is based on the maximum contract term.

Reactive Maintenance and Repair.

Bracknell Forest Borough Council | Published November 17, 2015
Winner
Kier Services
cpvs
50700000

The Council are looking to appoint a contractor to provide a Reactive Building Maintenance and Repair Service. This may include some Planned Maintenance work. The appointed contractor will be required to provide a 24-hour service to all Bracknell Forest Council premises and may also include schools. Schools will be included in the Invitation to Tender but their decision to procure the service will be on an optional basis. The contractor will provide maintenance and repair of mechanical and electrical services and plant. The exception to this will be where term maintenance contracts exist for specialist plant and equipment. There will be a requirement for a 3-stage response system, for example, 2-hour maximum response on emergency or health and safety (life threatening) situations, 4-hour maximum response for urgent but non-emergency work and 4 days for all other work required.

Reactive Maintenance and Repair

Bracknell Forest Borough Council | Published December 27, 2014  -  Deadline January 30, 2015
cpvs
50700000

The Council are looking to appoint a contractor to provide a Reactive Building Maintenance and Repair Service. This may include some Planned Maintenance work. The appointed contractor will be required to provide a 24 hour service to all Bracknell Forest Council premises and may also include schools. Schools will be included in the Invitation to Tender but their decision to procure the service will be on an optional basis. The contractor will provide maintenance and repair of mechanical and electrical services and plant. The exception to this will be where term maintenance contracts exist for specialist plant and equipment. There will be a requirement for a 3 stage response system, for example, 2 hour maximum response on emergency or health and safety (life threatening) situations, 4 hour maximum response for urgent but non-emergency work and 4 days for all other work required.

Reactive Maintenance and Repair.

Bracknell Forest Borough Council | Published December 27, 2014  -  Deadline January 30, 2015
cpvs
50700000

The Council are looking to appoint a contractor to provide a Reactive Building Maintenance and Repair Service. This may include some Planned Maintenance work. The appointed contractor will be required to provide a 24 hour service to all Bracknell Forest Council premises and may also include schools. Schools will be included in the Invitation to Tender but their decision to procure the service will be on an optional basis. The contractor will provide maintenance and repair of mechanical and electrical services and plant. The exception to this will be where term maintenance contracts exist for specialist plant and equipment. There will be a requirement for a 3 stage response system, for example, 2 hour maximum response on emergency or health and safety (life threatening) situations, 4 hour maximum response for urgent but non-emergency work and 4 days for all other work required.

Commercial Heating Servicing, Repair, Maintenance and Installation.

Bracknell Forest Homes | Published April 29, 2017
cpvs
45259300

The tender is primarily for the provision of commercial heating servicing, repair, maintenance and installation for the associations sheltered scheme of communal housing stock within the Bracknell and surrounding area. Bracknell Forest Homes currently has ownership and/or management of ten (10) commercial schemes predominantly commercial gas boilers with associated distribution and control systems. Secondary requirements will include support of the installation of domestic heating systems programme and it envisaged that between 120 and 150 domestic installation shall be required each annum. II.1.6) Information about lots This contract is divided into lots: No II.2) Description II.2.2) Additional CPV code(s) 42160000 44620000 45331110 50531100 II.2.3) Place of performance NUTS code: UKJ11 II.2.4) Description of the procurement 2 Stage Restricted Process. II.2.5) Award criteria Quality criterion: Documents / Weighting: 100 Price / Weighting: 0 II.2.11) Information about options Options: No II.2.13) Information about European Union funds The procurement is related to a project and/or programme financed by European Union funds: No Section IV: Procedure IV.1) Description IV.1.1) Type of procedure Restricted procedure IV.1.8) Information about Government Procurement Agreement (GPA) The procurement is covered by the Government Procurement Agreement: No IV.2) Administrative information IV.2.1) Previous publication concerning this procedure Notice number in the OJ S: 2016/S 226-411715 Section V: Award of contract Contract No: 1021 A contract/lot is awarded: No V.1 Information on non-award The contract/lot is not awarded Other reasons (discontinuation of procedure) Section VI: Complementary information VI.3) Additional information This contract is being run through Bracknell Forest Homes's e-procurement system — mytenders. All of the information and documentation relating to this contract will be stored online in this e-procurement system. All expressions of interest / requests for information / clarifications / tender submissions should be made via mytenders. To do this you will need to register at the web address below and then express an interest in this opportunity. You will then be able to obtain all relevant information / send any requests you have /submit your proposal via the system; www.mytenders.org (MT Ref: 196851). VI.4) Procedures for review VI.4.1) Review body Bracknell Forest Homes Berkshire Court, Western Road Bracknell RG12 1RE UK Telephone: +44 8006923000 Internet address(es) URL: www.bracknellforesthomes.org.uk VI.5) Date of dispatch of this notice 27/04/2017 Information added to the notice since publication. Additional information added to the notice since it's publication. No further information has been uploaded. Main Contact: procurement@bracknellforesthomes.org.uk Admin Contact: N/a Technical Contact: N/a Other Contact: N/a Commodity Categories Commodity Categories IDTitleParent Category 45331110Boiler installation workHeating, ventilation and air-conditioning installation work 42160000Boiler installationsMachinery for the production and use of mechanical power 44620000Central-heating radiators and boilers and partsTanks, reservoirs and containers; central-heating radiators and boilers 45259300Heating-plant repair and maintenance workRepair and maintenance of plant 50531100Repair and maintenance services of boilersRepair and maintenance services for non-electrical machinery Delivery Locations Delivery Locations IDDescription 100UK - All Alert Region Restrictions The buyer has restricted the alert for this notice to suppliers based in the following regions. Alert Region Restrictions There are no alert restrictions for this notice. Copyright © Sell2Wales Connect with us Email signup Subscribe to our email newsletter Subscribe Call us on 0800 222 9004 Accessibility| Privacy Policy & Cookies| Site map| Terms & Conditions| © Millstream Associates Limited 2017 //

Coral Reef Waterworld Main Works Contract.

Bracknell Forest Borough Council | Published February 14, 2015  -  Deadline March 20, 2015
cpvs
45453100, 45212000, 45212100, 45212212

The scope of work comprises the demolition and complete removal of the existing timber glulam beam roof over the main pool hall and replacement with a new steel truss roof which will be split into 2 sections with a centrally located roof light running the length of the roof. It is envisaged that the new roof shall be a duo pitch standing seam roof, with an acoustic perforated deck. Each section will span away and up from the roof light towards the high level lateral glazing around the perimeter of the proposed roof. The roof void shall contain an accessible services void and walkway accessed from an adjacent roof. Mechanical, electrical and public health systems associated with the main pool hall shall be replaced and modified to suit the new roof to include a new rainwater disposal system, air handling unit and associated ductwork to the main pool, updating pumps and associated equipment, including controls, cleaning and refixing existing ductwork, ventilation and extract system grilles. A section of the existing below ground drainage shall need to be diverted and the existing gas service extended to serve the flume tower plant room. The main low voltage panels shall be replaced, together with cabling and distribution boards to the main pool and new general and emergency lighting system to the main pool hall. New hard and soft external landscaping works shall be required to the perimeter of the site. The existing ancillary roofs over the changing village, Sauna World and Coconut Grove (café) will be overhauled and repaired. The repair scope shall comprise a combination of resin injection and dowel bars to repair the existing glulam beams together with replacement bolts and replacement and or repair of the roof coverings to meet current regulations. The existing ride tower is to be completely demolished whilst leaving the existing 3 ride flumes in place. A new reinforced concrete frame tower and link corridor will be constructed with a launch platform at approx. 12.5 m above the run out level. The tower shall be clad with a proprietary insulated wall panel system and shall have an integral lift and staircase for guests. At ground floor and basement level, a mechanical, electrical and aquatic plant room will be constructed along with a balancing tank and an aquatic riser from the plant room that connects to a horizontal aquatic services gallery running directly underneath the start tubs. New aquatics will be delivered to the new start tubs and new water treatment systems shall be installed to serve the new rides. Two new flumes will be constructed comprising an oscillating funnel slide and a bowl slide; the 3 existing flumes shall be adjusted to facilitate the new angle and new flume launch tower. The 2 new flumes will include aquatic based animation rain-bars, sprays and jets and will be supplemented by special effects with programmable light emitting diode lighting inside the flumes. The Ride Vendor element is subject to a separate OJEU notice. Therefore there will be a requirement for the ride vendor sub-contract to be novated into the main contract. Full details will be in the ITT. The interior of internal public facing areas shall be completely refurbished to comprise main reception area, changing village, café, Sauna World and Lazy River. The scope of this work shall include new internal fixtures, fittings and equipment internal wall, floor and ceiling finishes, and new mechanical and electrical installations.

Coral Reef Waterworld Main Works Contract.

Bracknell Forest Borough Council | Published April 23, 2015  -  Deadline May 22, 2015
cpvs
45453100, 45212000, 45212100, 45212212

The scope of work comprises the demolition and complete removal of the existing timber glulam beam roof over the main pool hall and replacement with a new steel truss roof which will be split into two sections with a centrally located roof light running the length of the roof. It is envisaged that the new roof shall be a duo pitch standing seam roof, with an acoustic perforated deck. Each section will span away and up from the roof light towards the high level lateral glazing around the perimeter of the proposed roof. The roof void shall contain an accessible services void and walkway accessed from an adjacent roof. Mechanical, electrical and public health systems associated with the main pool hall shall be replaced and modified to suit the new roof to include a new rainwater disposal system, air handling unit and associated ductwork to the main pool, updating pumps and associated equipment, including controls, cleaning and refixing existing ductwork, ventilation and extract system grilles. A section of the existing below ground drainage shall need to be diverted and the existing gas service extended to serve the flume tower plant room. The main low voltage panels shall be replaced, together with cabling and distribution boards to the main pool and new general and emergency lighting system to the main pool hall. New hard and soft external landscaping works shall be required to the perimeter of the site. The existing ancillary roofs over the changing village, Sauna World and Coconut Grove (café) will be overhauled and repaired. The repair scope shall comprise a combination of resin injection and dowel bars to repair the existing glulam beams together with replacement bolts and replacement and or repair of the roof coverings to meet current regulations. The existing ride tower and flumes are to be completely demolished. A new reinforced concrete frame tower and link corridor will be constructed with a launch platform at approx. 12.5 m above the run out level. The tower shall be clad with a proprietary insulated wall panel system and shall have an integral lift and staircase for guests. At ground floor and basement level, a mechanical, electrical and aquatic plant room will be constructed along with a balancing tank and an aquatic riser from the plant room that connects to services riser that provides water to the flumes. New water treatment systems shall also be installed to serve the new rides. Five new flumes will be constructed comprising an oscillating funnel slide, bowl slide, body slide, and two gravity ring rides The 2 new flumes will include aquatic based animation rain-bars, sprays and jets and will be supplemented by special effects with programmable light emitting diode lighting inside the flumes. The aquatic package sub contract is subject to a separate OJEU notice. Therefore there will be a requirement for the ride vendor sub-contract to be novated into the main contract. Full details will be in the ITT. The interior of internal public facing areas shall be completely refurbished to comprise main reception area, changing village, café, Sauna World and Lazy River. The scope of this work shall include new internal fixtures, fittings and equipment, internal wall, floor and ceiling finishes and new mechanical and electrical installations. If you have already submitted a completed Pre-Qualification Questionnaire for this project then you do not need to submit again.
  • 1