Public tenders for electrical in Hayange France

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

Electrical wiring and fitting work

Communauté d'agglomération du Val de Fensch | Published July 8, 2016
Winner
Electroservice
cpvs
45311000

The operation involves electrical work compliance, verification and recovery wiring, DOE plans remission and various electrical services for the headquarters building of the Community of agglomeration of Val de Fensch.

Electrical wiring and fitting work

Communauté d'agglomération du Val de Fensch | Published August 5, 2016
Winner
SARL Electro Service
cpvs
45311000

The operation involves electrical work compliance, verification and recovery wiring, DOE plans remission and various electrical services for the headquarters building of the urban community of Val de Fensch.

Supply of electrical equipment for the Municipal Technical Center

Mairie d'hayange | Published September 19, 2017  -  Deadline October 20, 2017
cpvs
31600000

Supply of electrical equipment for the Municipal Technical Center

Structural steel erection work for buildings

Communauté d'agglomération du Val de Fensch | Published August 27, 2015
Winner
SDEL Lumière enseigne commercial Citéos
cpvs
45262410

This consultation concerns the extension work and highlighting the park of the blast furnace U4 in Uckange. The transaction is to achieve the work of: - construction of an extension of the existing path in the cast house, - highlighted the cast house, - compliance of electrical installations of the existing path.

Structural steel erection work for buildings

Communauté d'agglomération du Val de Fensch | Published August 5, 2015
Winner
SDEL Lumière enseigne commercial Citeos
cpvs
45262410

This consultation concerns the extension work and highlighting the park of the blast furnace U4 in Uckange. The transaction is to achieve the work of: - construction of an extension of the existing path in the cast house, - highlighted the hale casting - compliance of electrical installations of the existing path.

Electricity

Ville d'Hayange | Published November 28, 2015
Winner
EDF, GDF Suez et Alterna
cpvs
09310000

Framework agreement for the supply and delivery of electricity.

Electricity supplies

Communauté d'agglomération du Val de Fensch | Published November 11, 2015  -  Deadline December 17, 2015
cpvs
31682000, 65300000, 71314100

This consultation concerns the supply and delivery of electricity and related services for the delivery points of the Community of agglomeration of Val de Fensch. The operation consisted of two separate batches. Each batch is a market with no minimum and no maximum amount and an economic operator. Current situation: the CAVF currently have 9 sites whose subscribed power is greater than 36 KVA. They break down as follows: # 6 websites yellow tariff # 3 websites green tariff. Specifications and consumption data of these sites are given in Annex 2 of the CCTP. The object of this market benefits include: # a complete supply of electric energy delivery points supplying the buildings of the contracting authority (including temporary connections) # The access to the public distribution network and using it to delivery points in under a single contract and delivery of electricity needed for sites identified CCTP # mission responsibly balance, defined pursuant to Article L.321-15 of Energy Code, includes in the price of the supply of electric energy # or services associated with this provision as described in CCTP.

Electricity

Ville d'Hayange | Published July 31, 2015  -  Deadline September 18, 2015
cpvs
09310000

Framework Agreement for the supply and delivery of electricity.

Installation services of electricity distribution equipment

METAFENSCH | Published October 1, 2015
Winner
Cofely Ineo
cpvs
51112100

Metafensch, public platform for R & D in the field of steel and metal implants in the Fensch Valley, on the U4 Uckange site in ancient Hfrsu stores. This platform will include various metal melting pilot equipment or by induction plasma torches and pumping features, fluid supply and discharge of raw materials and finished products. The Power of Metafensch requires a power of 4 MW.

Repair and maintenance of plant

Communauté d'agglomération du Val de Fensch | Published January 24, 2017  -  Deadline February 20, 2017
cpvs
45259000, 45110000, 45111100, 45262522, 45261000, 45421000, 45410000, 45320000, 09310000, 45431000, 45432113, 44112230, 44316500, 45442100, 45330000, 45331000, 44423450, 90910000, 45262660, 45262650, 45321000, 45443000, 45313000

The Framework Agreement will result in the conclusion of several subsequent contracts:

- An annual market subsequent to single orders or multi-beneficiaries in case of recurring and recurring needs.

- Subsequent ordinary markets, optional brackets.

The framework agreement is no minimum or maximum amount under Article 78 of Decree 2016-360 of March 25, 2016.

The work will include, but are not limited to demolition:

- The preparation and site installation

- Preliminary work - Greenspace work

- The selective deconstruction of the building work

- The careful deconstruction of the work of the existing wood frame

- The works of rehabilitation of the platform.

Companies will execute without exception or reservation, all the work of their profession required for the perfect completion of the works, and that, whatever the quantities of books they have to achieve.

the work will include, but are not limited to:

- The supply, the installation, maintenance and withdrawal at the end of work site installations;

- Earthworks;

- All openings, bled, refilling, seals, couplings

- concrete pouring

- Establishment of masonry walls.

Companies will execute without exception or reservation, all the work of their profession required for the perfect completion of the works, and that, whatever the quantities of books they have to achieve.

the work will include, but are not limited to:

- The supply, the installation, maintenance and withdrawal at the end of the work of construction of facilities;

- Cleaning works for the delivery and receipt;

- Protection of works to the reception;

- Manufacture in the workshop or on site

- Seals.

Companies will execute without exception or reservation, all the work of their profession required for the perfect completion of the works, and that, whatever the quantities of books they have to achieve.

the work will include, but are not limited to:

- The establishment by any means, including all calibrations, seals, etc.

- Manufacturing factory or workshop;

- Laying, setting, adjustment, adjustment and verification of the works;

- Laying dormant and doorframes.

Companies will execute without exception or reservation, all the work of their profession required for the perfect completion of the works, and that, whatever the quantities of books they have to achieve.

the work will include, but are not limited to:

- Manufacturing factory or workshop;

- The supply and installation of mounting systems

- The installation of wooden fittings

- The supply and installation of hardware

- Laying and cleaning windows.

Companies will execute without exception or reservation, all the work of their profession required for the perfect completion of the works, and that, whatever the quantities of books they have to achieve.

the work will include, but are not limited to:

- All openings, bled, refilling, seals, couplings

- Setting up isolation following construction principle

- Setting up false ceiling plasterboard wall on frame.

Companies will execute without exception or reservation, all the work of their profession required for the perfect completion of the works, and that, whatever the quantities of books they have to achieve.

the work will include, but are not limited to:

- The openings and grooves

- The supply, transport and the implementation of all equipment

- The grounding installations, the earthing and grounding connections;

- Electrical installations and safety equipment;

- Alarm and signaling facilities.

Companies will execute without exception or reservation, all the work of their profession required for the perfect completion of the works, and that, whatever the quantities of books they have to achieve.

the work will include, but are not limited to:

- The openings and grooves

- The supply, transport and the implementation of all equipment

- The grounding installations, the earthing and grounding connections;

- Electrical installations and safety equipment;

- The inst

Repair and maintenance of plant

Communauté d'agglomération du Val de Fensch | Published May 6, 2017
Winner
entreprise general de peinture spi
cpvs
45259000, 45110000, 45111100, 45262522, 45261000, 45421000, 45410000, 45320000, 09310000, 45431000, 45432113, 44112230, 44316500, 45442100, 45330000, 45331000, 44423450, 90910000, 45262660, 45262650, 45321000, 45443000, 45313000

The framework agreement is concluded without a minimum amount or maximum amount pursuant to Article 78 of Decree 2016-360 of 25.3.2016.

The work will include, but not be limited to, the demolition of the building: - site preparation and installation - preliminary work - green space works - selective deconstruction of the building - construction work Careful deconstruction of the existing timber framework - work to restore the platform.

The lot was estimated at EUR 30 000.

The works shall include, but not be limited to: - the supply, installation, maintenance and retreat at the end of the works on the site, - earthworks, - all piercings, , Sealing, coupling-concrete casting-placing of masonry walls.

The lot was estimated at 180,000 euros.

The undertakings must carry out, without exception or reservations, all the work of their profession which is indispensable for the complete completion of the

The works shall include, but not be limited to: - the supply, installation, maintenance and repairs at the end of the works at the site, - the cleaning of the works for delivery and reception, Protection of works up to the reception

- manufacturing in workshop or on site - sealing.

The lot was estimated at EUR 45 000.

The lot was estimated at EUR 25 000.

The works will include, but are not limited to: - factory or workshop fabrication - supply and installation of fastening systems - installation of joinery - supply and installation of hardware - laying and cleaning of glazing.

The lot was estimated at EUR 28 000.

The undertakings must carry out, without exception or reservations, all the work of their profession which is indispensable for the complete completion of the

The lot was estimated at 32,000 euros.

The lot was estimated at 70,000 euros.

The lot was estimated at 65 000 euros.

The lot was estimated at 28,000 euros.

The lot was estimated at 17 000 euros.

The lot was estimated at 28,000 euros.

The lot has been estimated at 22,000 euros.

The undertakings must carry out, without exception or reservations, all the work of their profession which is indispensable for the complete completion of the works, whatever the

The lot was estimated at 53,000 euros.

The undertakings, without exception or reserves, shall carry out all the work of their profession which is indispensable for the complete completion of the works, irrespective of the quantities of works to be carried out. Limiting: - the supply, transport and use of all materials - all drillings, slots, seals, seals, fittings - heating installations, including heating apparatus, distribution pipes and bodies , Faucets- equipment

Controls - Electrical connections, Gas,, Flue gas evacuation - Adjustment and

The lot was estimated at 69,000 euros.

The lot was estimated at 18,000 euros.

The lot was estimated at 16 500 euros.

The lot was estimated at 120,000 euros.

The lot was estimated at 33,000 euros.

The undertakings must carry out, without exception or reservations, all the work of their profession which is indispensable for the complete completion of the

The

Work shall include, but not be limited to: - the supply,

The lot was estimated at 74 000 euros.

The lot was estimated at 64,000 euros.

  • 1