Call +44 800 9755 164

Public tenders for electrical in Grenoble France

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

Electrical supplies and accessories

Conseil général de l'Isère | Published June 11, 2016  -  Deadline July 11, 2016
cpvs

electrical supplies and accessories

Electrical supplies and accessories

CEA Grenoble | Published September 28, 2016  -  Deadline November 4, 2016
cpvs
31680000

Basic supply: 230 electrical penetrations.

Electrical supplies and accessories

CEA Grenoble | Published April 6, 2017
Winner
Conesys Europe
cpvs
31680000

CEA Grenoble and service of low temperature (SBT) of nanoscience institute Cryogenics (INAC) wish to acquire 239 electric crossings cryostat walls (300 K) constituting the cryogenic chain thermometer for the superconducting magnets of ITER (International Thermonuclear Experimental Reactor - construction in Saint-Paul-lès-Durance - 13). Providing some crossings and the two connectors associated with each bushing are provided as part of any supplementary services (PSE). The benefits of vias and connector wiring are also planned as part of PSE ..

Preproduction basic supply: supply of electrical feedthroughs 19, 38 comprising the associated connectors.

Series basic supply: supply 220 crossings.

PES # 1: supply of additional electrical feedthroughs 32,

PES 2: providing electrical connectors 440,

PES 3: providing 64 additional electrical connectors,

PES 4: wiring benefits for 220 electrical feedthroughs.

Electrical supplies and accessories

CEA Grenoble | Published December 20, 2016  -  Deadline January 26, 2017
cpvs
31680000

CEA Grenoble and low temperatures Service (SBT) of Nanoscience Institute Cryogenics (INAC) wish to acquire 232 electric crossings cryostat walls (300 K) constituting the cryogenic chain thermometer for the superconducting magnets of ITER (International thermonuclear experimental Reactor - under construction in Saint-Paul-lez-Durance - 13). Providing certain crossings as well as the 2 connectors associated with each crossing are provided as part of any additional services (PES). The crossings benefits wiring and connectors are also provided as part of PSE.

Pre-production base of supply: supply of 12 electrical penetrations including 24 associated connectors.

Series basic provision: provision of 220 crossings.

PSE 1: provision of 32 additional electrical feedthroughs.

PES 2: supply of 440 electric connectors.

PSE 3: provision of 64 additional electrical connectors.

PES 4: Wiring services for 220 electrical penetrations.

Electrical supplies and accessories

Centre régional oeuvres univ. scolaires | Published February 17, 2017  -  Deadline March 17, 2017
cpvs
31680000

Supply of electrical equipment for all schools of Grenoble Alpes Crous.

Geographical Lot 1: Isere.

Geographical Lot 2: Savoie and Haute-Savoie.

geographical Lot 3: Drome.

Electrical wiring and fitting work

CHU de Grenoble | Published June 3, 2015  -  Deadline July 17, 2015
cpvs
45311000

This contract concerns the executions studies, supplies, installation, on-site control, revenue, the commissioning and the guarantee as part of the renovation work of the primary electrical distribution at the University Hospital of Grenoble - North hospital. The work involved in this market are planned in 2 phases.

Repair and maintenance services of electrical building installations

Grenoble Alpes Métropole | Published April 1, 2016  -  Deadline April 13, 2016
cpvs
50711000

repair and maintenance services of electrical building installations

Electrical wiring and fitting work

CHU de Grenoble | Published August 7, 2015  -  Deadline September 23, 2015
cpvs
45311000

The work involved in this market relate to the improvement of infrastructure of central generators. This contract concerns the executions studies, supplies, installation, on-site control, recipes, the commissioning and the guarantee of work under Phase 2 renovation of the primary electrical distribution center Grenoble University Hospital - North hospital.

Electrical wiring and fitting work

CHU de Grenoble | Published October 7, 2015
Winner
SPIE Sud-Est
cpvs
45311000

This contract concerns the executions studies, supplies, installation, on-site control, the recipes, the commissioning and the guarantee as part of the renovation work of the primary electrical distribution of Centre Hospitalier Universitaire de Grenoble - North hospital. The work involved in this market are expected in two phases. Market "Electricity BT IGH Michallon" normal BT architecture vertical modification / replacement and corrugated IGH Michallon.

Electrical installation work

CEA/Grenoble | Published May 17, 2017  -  Deadline June 23, 2017
cpvs
45310000

Construction, equipment and connection of a new high-voltage electrical supply substation at the CEA / Grenoble site.

Construction, equipment and connection of a new high-voltage electrical supply substation at the CEA / Grenoble site.

The main projects envisaged are:

- the construction of a new building to accommodate new equipment,

- the implementation of new HTA trains and associated auxiliary equipment,

- the connection of the various HTA loops of the site with the resumption of existing connections or the realization of new HTA links.

Initial installations:

The CEA of Grenoble is supplied with electrical energy via an HTB type outdoor delivery station RTE comprising:

- a 225/15 kV transformer - TR611 - 2 * 40 MVA, the protections of which are located in the adjoining RTE source station (confluent station),

- a transformer 225/20 kV - TR613 - 70 MVA belonging to GEG whose protections are located in the RTE source station,

A transformer 225/15 kV - TR612 - 2 * 40 MVA, the protections of which are located in the adjoining RTE source station.

Two ultimate backup links are also available for an ultimate "5MW" rescue via RTE's HTA train.

Future installations:

The new building for the electric delivery station will consist of:

- a basement for the route of the HTA connections:

It will be partitioned into 5 parts in order to obtain a fire separation 2h between the different rooms under the oars,

The routing of the new loop links is studied so that there is no common path of links of the same loop.

- the path is studied so that there is no common path of connections of the different sources.

- a DRC above the flood level with:

- a HTA room A1 row,

- a HTA room rowing B1,

- a HTA room A2 row,

- a HTA room B2 train,

- one room "auxiliary trains A1 and B1"

- a room "auxiliary trains A2 and B2"

- a room "counting RTE and auxiliary buildings"

- a fire separation 2h is provided between the various premises.

- a roof gravelly terrace to provide a certain thermal comfort to the building and to meet the architectural constraints of integration.

The new HTA delivery station will consist of 4 new HTA trains:

- A1 train with 8 HTA cells,

- A2 train with 9 HTA cells,

- B1 train with 8 HTA cells,

- B2 train with 8 HTA cells.

Only the source switch between the TR611 and the TR612 is realized automatically via the automation of the RTE Confluent substation.

They will have a working voltage of 24kV.

In order to remain in compliance with the operating agreement between the CEA and RTE, the TR611 and TR612 arrival cells and the 5MW final arrivals which are RTE / ENEDIS operational will have to comply with the HN64S40 standard of October 1995 And be authorized by ENEDIS.

The owner will have to carry out all the necessary services (stripping, earthworks, hard work, second-hand work, VRD, HV, BT, TBT, control-command, participation in supervision, ventilation, air conditioning, heating, fire detection, extinction Fire, lightning protection, water supply, evacuation of EU / EV and EP, tests, etc.) for the start-up of the new substation and its insertion into the existing electricity distribution network.

Repair and maintenance services of electrical machinery, apparatus and associated equipment

Institut polytechnique de Grenoble | Published July 8, 2016
Winner
Schneider Electric IT France
cpvs

repair and maintenance services of machinery and electrical appliances and related equipment

Repair and maintenance services of electrical building installations

Grenoble Alpes Métropole | Published December 23, 2016
Winner
Vinci Facilities Dauphiné Savoie Maintenance
cpvs
50711000, 50700000

Maintenance of technical installations of the ice.

Each of the above items is composed of a fixed part on preventive maintenance and a purchase-order part no minimum and no maximum on the corrective maintenance of the installations concerned.

- Lot No 1: Electrical Engineering (package 38 700 EUR HT / Order forms without and without mini maxi)

- Lot # 2: HVAC package (87 000 EUR HT / Purchase Orders without mini and no maximum).

This lot includes preventive maintenance (fixed part) and corrective maintenance (party to purchase orders) of electrical installations.

HVAC

This lot includes preventive maintenance (fixed part) and corrective maintenance (party to purchase orders) climate installations.

Renewal of electrical equipment pretreatment of industrial wastewater on site slaughterhouses Fontanil Cornillon

Synd. mixte bassins hydrauliques isere | Published January 20, 2017  -  Deadline February 13, 2017
cpvs

Consultation No. 17SYMAA-AM01 Renewal of electrical equipment pretreatment of industrial wastewater on site slaughterhouses Fontanil Cornillon

Lighting equipment and electric lamps

Institut polytechnique de Grenoble | Published January 8, 2016
Winner
Agence REXEL
cpvs
31500000, 31681000

Purchase of electrical equipment and lighting supplies.

Lighting equipment and electric lamps

Institut polytechnique de Grenoble | Published June 17, 2015  -  Deadline July 23, 2015
cpvs
31681000

Purchase of electrical equipment and lighting supplies.

Electrical supplies and accessories

CEA Grenoble | Published December 22, 2016  -  Deadline January 26, 2017
cpvs
31680000

CEA Grenoble and Low Temperatures Service (SBT) of the Nanoscience Institute Cryogenics (INAC) wish to acquire 232 electric crossings cryostat walls (300K) constituting the cryogenic chain thermometer for the superconducting magnets of ITER (International Thermonuclear Experimental Reactor - under construction in Saint Paul lez Durance - 13). Providing certain crossings and the two connectors associated with each crossing are provided as part of any additional services (PES). The crossings benefits wiring and connectors are also provided as part of PSE.

Electrical wiring and fitting work

CHU de Grenoble | Published July 3, 2015  -  Deadline July 31, 2015
cpvs
45311000

Travaux de câblage et d'installations électriques

Instruments for measuring electrical quantities

CEA/Grenoble | Published August 22, 2015
Winner
Serop
cpvs
38341300

The CEA wants to equip mechanical equipment for electrically testing micro battery components during the manufacturing process. This equipment must allow the positioning of micro batteries and electric measuring contacts. The different elements must comply with the requirements of materials, geometry and tolerances specified in the specifications. Required delivery date: 2015

Instruments for measuring electrical quantities

CEA/Grenoble | Published March 5, 2015  -  Deadline April 7, 2015
cpvs
38341300

CEA would be equipped with mechanical devices for electrically testing micro battery components during the manufacturing process. These facilities must positioning micro batteries and electric measuring contacts. The different elements must comply with the requirements of materials, geometry and tolerances specified in the specifications. Delivery date: 2015.

Instruments for measuring electrical quantities

Institut polytechnique de Grenoble | Published March 10, 2015
Winner
Distrame
cpvs
38341300

Acquisition of scientific and technical equipment for the SACCO 3 platform ESISAR school in Valencia - Grenoble INP.