Call +44 800 9755 164

Public tenders for electrical in Bordeaux France

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

Supply and delivery of electrical energy SIVU

Sivu bordeaux merignac | Published January 4, 2017  -  Deadline January 25, 2017
Supply and delivery of electrical energy SIVU

Mono framework agreement awarded for works and acts of electrical maintenance of the buildings of the Chamber of Commerce and Industry of Bordeaux

Cci bordeaux | Published December 16, 2016  -  Deadline January 26, 2017
Mono framework agreement awarded for works and acts of electrical maintenance of the buildings of the Chamber of Commerce and Industry of Bordeaux

Mission mastery of infrastructure work and system for segregation of existing hydraulic and electric networks of swing bridges tram burgundy freely ponds.

Bordeaux metropole | Published January 18, 2017  -  Deadline March 10, 2017
Mission-control infrastructure work and system design realization for the segregation of existing hydraulic and electric networks of swing bridges tram to the waves in pools Bordeaux.Une site visit is mandatory. The offer of a candidate who has not done this tour visits will be declared irrégulière.Les conditions are: they will perform the 30et 31 January 2017 from 9:00 to 16: 00 Candidates must make an appointment with: Mr. Eric Louit Tel: 05 56 99 75 22Monsieur Bruno Varas Tel: 05 56 93 65 39

Building completion work

Préfecture Aquitaine-SGAR-MRA | Published December 16, 2016  -  Deadline January 30, 2017

On Maintenance work on buildings (second work), to services of the State and its public institutions in the new Aquitaine region.

electrical work, strong and weak current flows in one geographical area "City of Bordeaux left bank".

Zone 1 - Technical activity B - plumbing, sanitary, heating, ventilation, air conditioning in one geographical area "City of Bordeaux left bank".

Zone 1 - Technical activity C: joinery work in wood, PVC, aluminum and steel, metalworking and locksmith in one geographical area "City of Bordeaux left bank".

Zone 1 - Technical activity D: painting work, resilient flooring, tiles and blinds in one geographical area "City of Bordeaux left bank".

Zone 1 - Technical activity E: partitions work, insulation and removable ceilings in one geographical area "City of Bordeaux left bank".

Zone 1 - Technical activity F: small masonry work, plastering, earthenware, roads and utilities in one geographical area "City of Bordeaux left bank".

Zone 1 - Technical activity G: asbestos-removal work geographical area and Cracking in 1 "City of Bordeaux left bank".

Zone 1 - Technical activity H: roof works, carpentry, zinc, sealing in one geographical area "City of Bordeaux left bank".

Zone 2 - A technical activity: Electrical work, strong and weak current flows in geographic zone 2 "and Urban Community of Bordeaux right bank districts of Blaye and Libourne."

Zone 2 - technical activity B: plumbing, sanitary, HVAC zone 2 "Urban Community of Bordeaux right bank districts of Blaye and Libourne."

Zone 2 - technical activity C: joinery work in wood, PVC, aluminum and steel, metalworking and locksmith by geographical area 2 "and Urban Community of Bordeaux right bank districts of Blaye and Libourne."

Zone 2 - technical activity ...

Urban planning and landscape architectural services

Commune de l'Entre-Deux | Published December 24, 2016  -  Deadline February 10, 2017

The main objectives are:

- Erasing networks lamise underground of all electrical lines, telephone;

- The upgrading of public lighting environment-including the population of petrels flying over this area;

- The completion of the stormwater network conforms to the master plan recently approved by council area

- Compliance PMR sidewalks and pedestrian paths

- Landscape integration of these footpaths.

The program of work includes:

- Erasing networks:

? In connection with the SIDELEC responsible for clearing the low voltage network;

? In connection with the meeting area for the installation of fiber

? In connection with EDF responsible for clearing the network Htb

- The environmental upgrading of street lighting:

? The underground development of public lighting network;

? The lighting installation environmentally friendly and controllable remotely.

- The completion of the stormwater network:

? Implementation of the Master Plan recommendations

- PMR compliance sidewalks and pedestrian paths:

- Realization of footpaths vegetated, achieving plot depending on the space available.

- The achievement of a road surface asphalt

- The installation of the regulatory signaling:

- Installation of street furniture.

  • 1