Public tenders for electrical in Vantaa Finland

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

Martinlaakson kindergarten electrical contract

Vantaan kaupunki | Published May 5, 2017  -  Deadline May 29, 2017
cpvs
45000000

Contract includes Martinlakson kindergarten electrical work. Project overview: The construction of Martinlakson day-care center (new building). This so-called. a low-energy building construction Target / Scope of data: Building Name: Martinlaakson Nursery Address: Martinllakksonpolku 7, 01620 Vantaa 1836 gross m2 Gross floor area 1,788 m2 building contractor acts as the main implementer. Contract includes Martinlakson kindergarten electrical work. The overall project Yes

Power plants, electrical machinery, electrical and automation equipment maintenance, repair and installation work 2016-2017

Helen Oy | Published July 7, 2016
cpvs
51100000

Power plants, electrical machinery, electrical and automation equipment maintenance, repairs and installation Helen Ltd in various locations over the years 2016-2017.

Power plants, electrical machinery, electrical and automation maintenance, repair and installation work 2016-2017

Helen Oy | Published September 11, 2015  -  Deadline September 27, 2015
cpvs
51100000

Contract comprises power plants, electrical machinery, electrical and automation maintenance, repairs and installation of Helen Ltd in various locations over the years 2016-2017. The demand for labor is expected to be in the summer during the annual maintenance of the average electrical machine technicians with regard to 6 persons, electric installers with regard to 4 persons and automation installers with regard to 2 people. NOTE! Ad information can be found Tarjouspalvelu.fi -toimittajaportaalista. Also on offer / request to participate, the transmission is done in this way. A direct link to the notification the additional information can be found here Hilma notification. https://tarjouspalvelu.fi/helen/?id=44412&tpk=e162baec-8878-44e6-a6d4-38cf6bfc919d

Pähkinärinne school technical renovation, the draft phase electrical design, optional pääpiirustus- design and implementation of electrical engineering.

Vantaan kaupunki | Published April 15, 2015  -  Deadline May 5, 2015
cpvs
71320000

Pähkinärinne school was completed in 1980. The School of ventilation, moisture damage, most of the lighting and electrical engineering, surface structures, as well as service kitchen will be corrected. Scope of the subject is the 5035 gross m2. This acquisition covers Pähkinärinne school technical renovation sähkösuunniittelun draft design (L2-phase), the evasive spaces for electrical and telecommunication systems design in respect of subscriptions, optional pääpiirustus- the design and implementation of electrical design and construction duties. Unfortunately prepared two alternative draft ventilation. The design task will be to define in more detail in the invitation to tender house technical design of the to-do list, according TATE12. Subscriber obtains in the main architectural, structural, electrical and HEVAC designers separately contest. Purchasing will take place, if the City Council approves the project, the project plan. The project's working language is Finnish, and all the documents drawn up in the Finnish language. Planning will begin in May 2015 and the project plans will be completed in October 2015. The repair work will be completed in the summer of 2016. NOTE! Notification information can be found Tarjouspalvelu.fi -toimittajaportaalista. Also, the offer / request to participate transmission is made through this. A direct link to the alert information can be found here Hilma notification.

Framework agreement maintenance of electrical installations

Vantaan kaupunki | Published March 12, 2015  -  Deadline March 31, 2015
cpvs
45000000, 45310000

City of Vantaa Facility Centre to request a quotation maintenance of electrical work tuntiveloitusperusteisena bills the night of the contract period 06/01/2015 - 05/31/2017, as well as any option years (1 + 1) after this period, the extent of this invitation to tender and accompanying documentation shows. Procurement and acquisitions job with project organized tender briefing on 19.03.2015 at 14: 00-15: 00 at 7 Kielotie mode 007.

SUSPENSION NOTICE: Framework agreement maintenance of electrical installations

Vantaan kaupunki | Published April 23, 2015  -  Deadline May 15, 2015
cpvs
45000000, 45310000

City of Vantaa, the Technical Board has decided on 04.14.2015 suspended the acquisition of maintenance of electrical work. Attached: an extract from the minutes of the Technical Committee 04/14/2015 Section 18

Kuusela family support additional building electrical contract

Vantaan kaupunki | Published January 3, 2017  -  Deadline February 6, 2017
cpvs

Contract includes Kuusela family support building additional electrical work. Project overview: The construction Kuusela family rehabilitation additional building (new building). A so-called. the construction of low-energy-level of the building. Target / Scope of data: Building Name: Kuusela family rehabilitation annex building Address: Viola 16, 01300 Vantaa Neighborhood, block, plot 61, Tikkurila, 302, 2. Building kerm2 2840, the remaining 137 953 brm2 kerm2 Gross floor area 945 m2 building contractor is the main implementer. Contract includes Kuusela family support building additional electrical work. The overall project Yes

Maintenance of electrical installations framework agreement

Vantaan kaupunki | Published September 10, 2015  -  Deadline September 28, 2015
cpvs
45000000, 45311000

The City of Vantaa Health Centre to request a quotation maintenance of electrical tuntiveloitusperusteisena bills the night of the agreement period 12.01.2015 - 11.30.2017 the extent that it is clear from the invitation to tender supporting documentation. For all sectors, jobs are maintenance or contracting work is primarily Centre maintained by the properties whose duration varies from a few hours to a few weeks. On-demand jobs may be small lighting and sockets, as well as modifications relating to the status changes electrical work. Work order may also include equipment purchases, and other related work performance of service. The contractor acts as the main implementer of ordered work and is responsible for site safety at work, as well as building associated with the Contractor in accordance with the law obligations and tax reporting obligations. The client undertakes no subscription or purchase volumes, since the number of future works is not known in advance. The tasks are not identified. The customer reserves the right in exceptional cases, a separate tenders for acquisition of some specific, individual items, eg. If the object's service model includes the work in question. Based on the same contract procurement voidat to make the City of Vantaa in all sectors, public utilities, as well as the city-owned majority share of corporations and foundations (Note 9). NOTE! Ad information can be found Tarjouspalvelu.fi -toimittajaportaalista. Also on offer / request to participate, the transmission is done in this way. A direct link to the notification the additional information can be found here Hilma notification.

Uoma Rinne school expansion electrical contract

Vantaan kaupunki | Published July 7, 2017  -  Deadline August 21, 2017
cpvs
45000000

Contract includes Uoma Rinne school electrotechnical work. Project overview: This Uoma Rinne school extension (new building) construction. The contract also includes related old-school status sealing of electrical work Target / Scope of data: Building Name: Uoma Rinne school Address: Uoma Rinne 2, 01600 Vantaa 2058 gross m2 Gross floor area 1,908 m2 building contractor acts as the main implementer. This is subordinate-page contract includes procurement Uoma Rinne school electrotechnical work. The overall project Yes

The properties used in electrical installation accessories and lamps

Vantaan kaupunki/hankintakeskus | Published October 7, 2014
Winner
SLO Oy
cpvs
31000000

The properties used in electrical installation accessories, batteries and light bulbs City of Vantaa in various industries, commercial enterprises, subsidiaries and foundations needs. NOTE! Ad information can be found Tarjouspalvelu.fi -toimittajaportaalista. Direct link to the notification of additional information can be found here Hilma notification. https://tarjouspalvelu.fi/vantaa/?id=22885&tpk=a595863f-4170-4b17-8c10-ee5bfd21d8fd

VAV / repair of buildings of electrical equipment, servicing and maintenance tasks

VAV Asunnot Oy | Published April 3, 2017  -  Deadline April 26, 2017
cpvs
50711000

Contract includes VAV Asunnot Oy and its subsidiaries owned and fully managed by the rental of residential real estate repair electrical equipment, maintenance, and maintenance tasks. The objective is to find an inexpensive, flexible, and transparent approach VAV to ensure the functioning of the property and the mass of the development mode of operation. Contract includes VAV Asunnot Oy and its subsidiaries owned and fully managed by the rental of residential real estate repair electrical equipment, maintenance, and maintenance tasks. The objective is to find an inexpensive, flexible, and transparent approach VAV to ensure the functioning of the property and the mass of the development mode of operation.

Vaaralas park kindergarten electrical contract

Vantaan kaupunki | Published May 20, 2016  -  Deadline June 2, 2016
cpvs
45200000

The acquisition includes all of the park Vaaralas kindergarten electrical work. Work performed at the contractor have made out according to plan. The building contractor is the main implementer site and the site johtovelvollisena contractor. Side-contractors be subject to the main contract. Offer is given SUBSCRIBER TO GIVE THE LIST OF BASIC AID (project bank) and the contract program wide principles. The subscriber uses electricity contract amount of modeling based on the list for the first time in a pilot scheme. If the number of material errors in the list of the revision phase (see Fig. Contract Programme) shows the number of the list, the impact of which the offer price by more than 10%, subscriber reserves the right to request the new company submitting the bid offer for all the contractor's number of amendments based on. Building Name: Dangerous for the park's nursery Address: Harju Edge 23, 01230 Vantaa, Finland The building site is located Vaaralas district, block 93127. Details Credits: Gross entire building in 1467 brm2. In addition, the cold outdoor spaces: rullakkotila 4brm2, an outdoor equipment storage 32brm2 and canopy 24m2 Capacity: 7215 m³ Special features: The so-called. the construction of nearly 0 energy level day-care center. Electricity contract includes the technical ventilation (SU) found in contract documents, described and plans drawn up for the subscriber based on the work as a whole. If desired, the contractor can use the status of the documents mentioned building products or other products of the working method or way of working. The contractor shall obtain the prior exchange of the developer and co. Approval of the designer. The contractor will be presenting the changes to take into account public and to separately change impact on energy efficiency (nearly zero-energy target). Publication of the invitation to tender also in Hilmar.

NOTE! Notification of additional information can be found on Offer Service -toimittajaportaalista. Also on offer / request to participate, the transmission is done in this way. Direct link to the notification of additional information can be found here Hilma-notification.

Vaaralas park kindergarten electrical contract

Vantaan kaupunki | Published May 20, 2016  -  Deadline June 2, 2016
cpvs
45200000

The acquisition includes all of the park Vaaralas kindergarten electrical work. Work performed at the contractor have made out according to plan. The building contractor is the main implementer site and the site johtovelvollisena contractor. Side-contractors be subject to the main contract. Offer is given SUBSCRIBER TO GIVE THE LIST OF BASIC AID (project bank) and the contract program wide principles. The subscriber uses electricity contract amount of modeling based on the list for the first time in a pilot scheme. If the number of material errors in the list of the revision phase (see Fig. Contract Programme) shows the number of the list, the impact of which the offer price by more than 10%, subscriber reserves the right to request the new company submitting the bid offer for all the contractor's number of amendments based on. Building Name: Dangerous for the park's nursery Address: Harju Edge 23, 01230 Vantaa, Finland The building site is located Vaaralas district, block 93127. Details Credits: Gross entire building in 1467 brm2. In addition, the cold outdoor spaces: rullakkotila 4brm2, an outdoor equipment storage 32brm2 and canopy 24m2 Capacity: 7215 m³ Special features: The so-called. the construction of nearly 0 energy level day-care center. Electricity contract includes the technical ventilation (SU) found in contract documents, described and plans drawn up for the subscriber based on the work as a whole. If desired, the contractor can use the status of the documents mentioned building products or other products of the working method or way of working. The contractor shall obtain the prior exchange of the developer and co. Approval of the designer. The contractor will be presenting the changes to take into account public and to separately change impact on energy efficiency (nearly zero-energy target). Publication of the invitation to tender also in Hilmar. NOTE! Notification of additional information can be found on Offer Service -toimittajaportaalista. Also on offer / request to participate, the transmission is done in this way. Direct link to the notification of additional information can be found here Hilma-notification.

Pähkinärinne school technical upgrading electrical contract

Vantaan kaupunki, Pähkinärinteen koulun tekninen perusparannus sähköurakka | Published November 17, 2015  -  Deadline December 14, 2015
cpvs
45000000

Pähkinärinne school was built in 1980. This refurbishment of the school's ventilation renewed (iv new machines are installed on the roof of the container machines), the majority of old electrical and lighting technology is dismantled and replaced. Construction of technical corrections to be done for instance. As regards surfaces and facade, improved airtightness of structures and local moisture damage is repaired. The kitchen also has a new service in the context of this basic improvement. The extent of the building is 5035 brm2. The building contractor acting as prime contractor, and the main implementer site johtovelvollisena. MEP work is done on the subscriber's separate purchasing and subjected to the main contract. Unfortunately draw up local plans. . NOTE! Ad information can be found Tarjouspalvelu.fi -toimittajaportaalista. Also on offer / request to participate, the transmission is done in this way. A direct link to the notification the additional information can be found here Hilma notification.

Correction Notice: Framework agreement for maintenance electrical

Vantaan kaupunki | Published March 24, 2015  -  Deadline March 31, 2015
cpvs
45000000, 45310000

City of Vantaa Facility Centre to request a quotation maintenance of electrical work tuntiveloitusperusteisena bills the night of the contract period 06/01/2015 - 05/31/2017, as well as any option years (1 + 1) after this period, the extent of this invitation to tender and accompanying documentation shows. CORRECTION NOTICE 19.03.2015 held acquisitions job with -tiedotustilaisuuden address was incorrect, resulting in a new briefing held 03/25/2014 at 15:30 - 16:30 at Kielotie 13, 3rd floor, the space 391b, Vantaa, or may be associated with the City of Vantaa, the employment services of the person Mira Luukkanen 043 8249979 or mira.luukkanen@vantaa.fi. The attached acquisitions work remains rekrytointi.pdf. In addition, the modified contract notice in the identification or reference to respond to the invitation to tender diary number. Tenders will also be accepted in a previous notice of the identity or reference number. Otherwise, the contract notice remains unchanged.

City of Vantaa 2C class of objects of electrical equipment operation management

Vantaan kaupunki | Published January 22, 2015  -  Deadline February 13, 2015
cpvs
50711000

The city of Vantaa owns nine (9) The use of head of items, which tendered the use of a leader. Director's electricity use competitive bidding in accordance with the service description. The electric system operator and the entity or enterprise service-employed in the natural person who made the contract the use of leadership. Director requires the use of an appropriate certificate of competence. A leader in the use of the process are shown in the Ministry of Trade and Industry (MTI) decision electrical work (516/96).

Tack, Elimäenkatu 20, Helsinki, repair and alteration, electrical contract

Hengitysliitto ry | Published July 18, 2016  -  Deadline August 9, 2016
cpvs
45310000

Contract includes Vocational most creative use of premises for the repair and modification work for wiring the invitation to tender, in the extent. HEVAC and subjected to electric works side urakkoina main contract. Repair and modification mainly concerns the 4th-floor rooms, which are converted into suitable educational purposes. Currently, the premises consist of office and workshop activities. The extent of change in the area is approximately 1,400 m2 (4th floor.) + minor alterations 3rd and 5th floors + technical rooms. electrical engineering old farms unloaded mainly out. The initial contract period is 10/2016 - 4/2017.

CORRECTION NOTICE: CORRECTION NOTICE: Pähkinärinne school technical upgrading electrical contract

Vantaan kaupunki, Pähkinärinteen koulun tekninen perusparannus sähköurakka | Published November 30, 2015  -  Deadline December 21, 2015
cpvs
45000000

Pähkinärinne school was built in 1980. This refurbishment of the school's ventilation renewed (iv new machines are installed on the roof of the container machines), the majority of old electrical and lighting technology is dismantled and replaced. Construction of technical corrections to be done for instance. As regards surfaces and facade, improved airtightness of structures and local moisture damage is repaired. The kitchen also has a new service in the context of this basic improvement. The extent of the building is 5035 brm2. The building contractor acting as prime contractor, and the main implementer site johtovelvollisena. MEP work is done on the subscriber's separate purchasing and subjected to the main contract. Unfortunately draw up local plans. . Electricity contract changes in plans. NOTE! Ad information can be found Tarjouspalvelu.fi -toimittajaportaalista. Also on offer / request to participate, the transmission is done in this way. A direct link to the notification the additional information can be found here Hilma notification.

The sun stone school 2.vaihe, expansion, electrical engineering

Vantaan kaupunki | Published May 12, 2016  -  Deadline May 27, 2016
cpvs
71321000

The sun stone school 2.vaihe, expansion, acquisition of electrical design is also an art school and a music kiopisto work in the building. The sun stone's 2nd phase involves the expansion of the building school premises middle school luok-banks with regard to the comprehensive model. Extension modules will be joining integrally the first phase of building the frame. 1st and 2nd phase will form a coherent whole, so that the structural and technical systems are compatible with each other. Spatial design and technical solutions related to education-oriented culture changes, and the new curriculum. This phenomenon-based learning, yhteisopettajuus, the effective use of information technology as well as teachers and student groups in an interactive by cooperating are part of the changing learning environment. The facilities are designed flexible and versatile. The sun stone first construction works will be completed in June-October clinic, kindergarten and primary school construction work were included in 2016. The first construction phase, as well as kindergarten and school yard work. The second phase two expansion parts, whose location and massing comply with the architect of the winning and the actual proposal for a solution. The building phase 1 facilities are in operation 2.vaiheen construction period. Rake-build- ing work since August 2016, health clinics, youth health point, kindergarten, primary school, an art school and a music school. 5240 gross m2. The project cost forecast of 14.3 million. €. Energy solution district heating and uu-newable energy requirement to be produced on the spot carried out on the attitude of the roof with solar panels. TATE-demand model in accordance with the Level 2 and its complementary busi-compound Technical Building modeling requirements and in accordance with the general operating principles of BIM City of Vantaa Health Centre - advice. The modeling is performed so that the data models of the 1st and 2nd stage of forming the converging unit, formed by the two phases of the data model can be examined and worked with the same software. Planning Tasks will be a clearer definition of the technical design of the invitation to tender house-do list, according TATE12. The project will be carried out if the city council approves the project plan in the autumn of 2016. The extension will be introduced in August 2019. The project's working language is Finnish, and all the documents drawn up in the Finnish language. The client acquires the object structure, - HVAC and electrical engineers a competitive process separately.

Direct link to the notification of additional information can be found here Hilma-notification.

The sun stone school 2.vaihe, expansion, electrical engineering

Vantaan kaupunki | Published May 12, 2016  -  Deadline May 27, 2016
cpvs
71321000

The sun stone school 2.vaihe, expansion, acquisition of electrical design is also an art school and a music kiopisto work in the building. The sun stone's 2nd phase involves the expansion of the building school premises middle school luok-banks with regard to the comprehensive model. Extension modules will be joining integrally the first phase of building the frame. 1st and 2nd phase will form a coherent whole, so that the structural and technical systems are compatible with each other. Spatial design and technical solutions related to education-oriented culture changes, and the new curriculum. This phenomenon-based learning, yhteisopettajuus, the effective use of information technology as well as teachers and student groups in an interactive by cooperating are part of the changing learning environment. The facilities are designed flexible and versatile. The sun stone first construction works will be completed in June-October clinic, kindergarten and primary school construction work were included in 2016. The first construction phase, as well as kindergarten and school yard work. The second phase two expansion parts, whose location and massing comply with the architect of the winning and the actual proposal for a solution. The building phase 1 facilities are in operation 2.vaiheen construction period. Rake-build- ing work since August 2016, health clinics, youth health point, kindergarten, primary school, an art school and a music school. 5240 gross m2. The project cost forecast of 14.3 million. €. Energy solution district heating and uu-newable energy requirement to be produced on the spot carried out on the attitude of the roof with solar panels. TATE-demand model in accordance with the Level 2 and its complementary busi-compound Technical Building modeling requirements and in accordance with the general operating principles of BIM City of Vantaa Health Centre - advice. The modeling is performed so that the data models of the 1st and 2nd stage of forming the converging unit, formed by the two phases of the data model can be examined and worked with the same software. Planning Tasks will be a clearer definition of the technical design of the invitation to tender house-do list, according TATE12. The project will be carried out if the city council approves the project plan in the autumn of 2016. The extension will be introduced in August 2019. The project's working language is Finnish, and all the documents drawn up in the Finnish language. The client acquires the object structure, - HVAC and electrical engineers a competitive process separately.