Call +44 800 9755 164

Public tenders for electrical in Oulu Finland

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

Mäntylän kindergarten, renovation; RU of the main work and HEVAC and electrical contract subordination to page-based contracts,

Oulun kaupunki | Published October 19, 2016  -  Deadline November 14, 2016
Mäntylän kindergarten (Snellman Home, ex. Christmas Make Home) Renovation includes a gross area of ​​1978 gross m2 and completed in 1934 for the renovation of the main building plans. In addition, the reforms carried out repairs and yard area. HVAC-engineering systems of kindergarten will be renewed according to plan. The project is implemented divided by the build contract in which all the contractors have a direct contractual relationship with the subscriber. Main contract includes civil works and general construction requirements of the project. The main contractor responsible for construction management responsibilities and co-ordinate the construction of alistamissopimuksilla; HEVAC and electrical contract subordination to page-based contracts.

Construction structures and materials; auxiliary products to construction (except electric apparatus)

Oulun kaupunki | Published October 6, 2016  -  Deadline November 16, 2016
Oulu technical enterprise to request an offer infrastructure solutions concrete products for the period 1.1.2017-31.12.2018 and possible options for the years 2019 and 2020 in accordance with the invitation to tender.

Laivakangas school expansion, KVS-design

Oulun kaupunki | Published October 14, 2016  -  Deadline November 11, 2016
explained Jäälin school renovation project planning is 04.09.2014 proposed that the school Jäälin replaced by a new building due to the high degree of renovation. Feasibility study Jäälin school renovation to replace the new building was completed in 10.31.2014. According to the decision of the school Jäälin replace spaces are placed Laivakangas school mission extension part, which would create a new community center. Community should act as a primary school class. 1-9, special groups and Jäälin library and possibly a resident room. The school does not come well-being points or pre-school classes. Departing from the original plan for the reference library located inside the current school building is no longer necessary to build an extension to kirjaton required. functional and qualitative objectives of the project are presented in the project plan and the user drawn up by the pedagogical review. a description of the technical systems are presented in Inspecta Oy's report. Project size and cost targets are determined and their implementation is monitored drawn up on the basis of a target price estimate calculations. Project objectives specified in the early stages of the design with the design team. Project planning is a form of KVS design and implementation of a preliminary form of a turnkey contract (SR), where the phase II design package is transferred to the control selectable contractor. Planning will begin in November 2016 and the premises are designed to be ready to be introduced in July 2018. The design assignment includes the main and architectural design, structural design, HVAC design, electrical design, acoustic design, interior design, landscaping design, the bottom of the structural design and audio-visual design.
  • 1