Call +44 800 9755 164

Public tenders for electrical in Lappeenranta Finland

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!
ElectricalFinlandlappeenranta

Electricity

Lappeenrannan teknillinen yliopisto | Published February 10, 2017  -  Deadline March 15, 2017
cpvs
09310000

Fixed-term 2-year contract flat rate electricity supply.

Lappeenranta University of Technology invites tenders under the flat rate for electricity delivery on time delivery period. The number of seats is the use of five pieces, and the reality of the 12-month hourly use is

presented in the year 2015 for the Annex "LUT hour data 2015". The use of electrical energy is about 6 000 MWh per year.

The offered delivery period is: 01.01.2018 - 31.12.2019.

relating to the construction of K-hospital Alterations position in the hospital: the changes of dialysis water system and D1-wing ELECTRICAL ENGINEERING

Etelä-Karjalan sosiaali- ja terveydenhuollon kuntayhtymä | Published February 6, 2017  -  Deadline February 28, 2017
cpvs

in the invitation to tender is a modification of the construction of the South Karelia Central Hospital K-making position in the hospital and in more detail in dialysis water system and D1-wing modification and repair work on electrical engineering. Dialysis, the water system will be built to include power monitoring and power department, as well as D1-wing spaces in the contract documents indicated below. D1-wing modification and repair work, an area of ​​about 1425 htm². Site address is Valto Käkelän street 1, 53130 Lappeenranta. The design phase to begin exploring the possibility of rendering and energy-efficient new ventilation system under the project hospital indoor air quality requirements. As part of the offer given the cost The modestly in the bid for this work entity by using a potential compensation price is determined, if the ventilation system is not in connection with a project to design and implement. Link to the tender documents can be found in the tender documents the user is: dialysis D1 password is: Eksote2017 the subject of the invitation to tender is for the construction of South Karelia Central Hospital of K-Making alterations and further strain the hospital dialysis water system and D1-wing modification and repair work on electrical engineering. Dialysis, the water system will be built to include power monitoring and power department, as well as D1-wing spaces in the contract documents indicated below. D1-wing modification and repair work, an area of ​​about 1425 htm². Site address is Valto Käkelän street 1, 53130 Lappeenranta. The design phase to begin exploring the possibility of rendering and energy-efficient new ventilation system under the project hospital indoor air quality requirements. As part of the offer given the cost The modestly in the bid for this work entity by using a potential compensation price is determined, if the ventilation system is not in connection with a project to design and implement. Link to the tender documents can be found in the tender documents the user is: dialysis D1 password is: Eksote2017

Electrical design, Pohjolankatu 12 of Part A of Marata and renovation of Elt

Etelä-Karjalan koulutuskuntayhtymä | Published February 3, 2017  -  Deadline March 6, 2017
cpvs

Pyydämme sähkösuunnittelutarjoustanne Matkailu-, Ravitsemis- ja Talousalan sekä Elintarvikealan opetustilojen peruskorjauksesta. Suunnittelualueeseen kuuluu Pohjolankatu 12 A-osan 1. kerroksessa sijaitsevat opetuskeittiöt 1-4, leipomo ja kahvila Tuurimokka (n. 1000 m²) sekä kellarikerroksen varasto ja sosiaalitilat (n. 300 m²). Peruskorjauksessa on kiinnitettävä huomiota sisäilman laatuun. Ulkoseinien tiiviyteen ja alapohjan tiiveyteen on kiinnitettävä erityistä huomiota. Kantavat rakenteet rajoittavat tilojen layout-suunnitelman tekoa, koska niitä ei voitane poistaa. LVISA-tekniikka uusitaan kaikilta osin. IV-koneelle rakennetaan uusi konehuone osaston katolle. Sisäpihan puolelle suunnitellaan uudisrakennuksena yhdyskäytävä. Kahvila Tuurimokka siirretään nykyisen leipomon kohtaan. Suunnittelija velvoitetaan tutustumaan kohteeseen ennen tarjouksen antamista. Näyttöpäivä on pe 10.2.2017 klo 14.00, paikka Pohjolankatu 12 pääaula, tai sopimuksen mukaan. Yhteyshenkilö on kiinteistöpalvelun esimies Pauli Lipponen puh. 0400-750714. Hankkeen aikataulu ja pohjapiirustukset ovat tarjouspyynnön liitteenä. Pyydämme sähkösuunnittelutarjoustanne Matkailu-, Ravitsemis- ja Talousalan sekä Elintarvikealan opetustilojen peruskorjauksesta. Suunnittelualueeseen kuuluu Pohjolankatu 12 A-osan 1. kerroksessa sijaitsevat opetuskeittiöt 1-4, leipomo ja kahvila Tuurimokka (n. 1000 m²) sekä kellarikerroksen varasto ja sosiaalitilat (n. 300 m²). Peruskorjauksessa on kiinnitettävä huomiota sisäilman laatuun. Ulkoseinien tiiviyteen ja alapohjan tiiveyteen on kiinnitettävä erityistä huomiota. Kantavat rakenteet rajoittavat tilojen layout-suunnitelman tekoa, koska niitä ei voitane poistaa. LVISA-tekniikka uusitaan kaikilta osin. IV-koneelle rakennetaan uusi konehuone osaston katolle. Sisäpihan puolelle suunnitellaan uudisrakennuksena yhdyskäytävä. Kahvila Tuurimokka siirretään nykyisen leipomon kohtaan. Suunnittelija velvoitetaan tutustumaan kohteeseen ennen tarjouksen antamista. Näyttöpäivä on pe 10.2.2017 klo 14.00, paikka Pohjolankatu 12 pääaula, tai sopimuksen mukaan. Yhteyshenkilö on kiinteistöpalvelun esimies Pauli Lipponen puh. 0400-750714. Hankkeen aikataulu ja pohjapiirustukset ovat tarjouspyynnön liitteenä.

Electricity supply for the period 2018-2019

Lappeenrannan teknillinen yliopisto | Published February 9, 2017  -  Deadline March 15, 2017
cpvs
09310000

Fixed-term 2-year contract flat rate electricity supply. Lappeenranta University of Technology invites tenders under the flat rate for electricity delivery on time delivery period. The number of seats is the use of five pieces, and the reality of the 12-month hourly use is presented in Appendix "LUT hour data 2015" the year 2015 for. The use of electrical energy is about 6 000 MWh per year. The offered delivery period is: 01.01.2018 - 31.12.2019 Temporary two-year contract flat rate electricity supply.

Electricity

Etelä-Karjalan Koulutuskuntayhtymä | Published February 24, 2017  -  Deadline March 27, 2017
cpvs
09310000

South Karelia Educational Group of electric energy supply, the details of which appear in more detail in the attached contract notice in the tender documents.

South Karelia Educational tendering PPA Group, which resulted in agreed upon the seller's margin and electricity contractual terms and conditions. The final billing of electric energy price will be determined within the framework of an agreement in accordance with the price of mortgages tasks.

The electric energy supply

Etelä-Karjalan Koulutuskuntayhtymä | Published February 23, 2017  -  Deadline March 27, 2017
cpvs
09310000

The requirements in the contract documents in accordance with the determined South Karelia Educational PPA division tendering, which resulted in agreed upon the seller's margin and electricity contractual terms and conditions. The final billing of electric energy price will be determined within the framework of an agreement in accordance with the price of mortgages tasks. South Karelia Educational Group of electric energy supply, the details of which appear in more detail in the attached contract notice in the tender documents. The requirements in the contract documents in accordance with the specified

Lappeenranta Housing Services Ltd / Orion Street 5 Renovation

Lappeenrannan Asuntopalvelu Oy | Published February 3, 2017  -  Deadline March 2, 2017
cpvs

The project consists of Lappeenranta Housing Services Ltd's single five-story two-step residential apartment building renovation aluetöineen Lappeenranta Skinnarila district, at Orion Street 5. In addition, the house has a basement above ground, which is also located two flats. The property has 42 residential units with a total living area of ​​1878 m2. The basement floor is irtainvarastot, VSS mode, saunas pesutiloineen, laundry room, drying room, storage rooms and technical rooms. The estimated construction start date in May 2017 and the length of the period is 1 year. Urakkatarjoukset are invited to the following: - works, - HVAC works, - electrical contract. The building contractor is the main contractor of the project (project supervisor). HEVAC and electricity contracts are subject to the page contracts. The developer's contract with the contractor may subcontract parts of the contract subcontracted remains, first accepted as eligible sub-contractor construction contractor. The developer will not accept this further subcontract concatenation. The project consists of Lappeenranta Housing Services Ltd's single five-story two-step residential apartment building renovation aluetöineen Lappeenranta Skinnarila district, at Orion Street 5. In addition, the house has a basement above ground, which is also located two flats. The property has 42 residential units with a total living area of ​​1878 m2. The basement floor is irtainvarastot, VSS mode, saunas pesutiloineen, laundry room, drying room, storage rooms and technical rooms. The estimated construction start date in May 2017 and the length of the period is 1 year. Urakkatarjoukset are invited to the following: - works, - HVAC works, - electrical contract. The building contractor is the main contractor of the project (project supervisor). HEVAC and electricity contracts are subject to the page contracts. The developer's contract with the contractor may subcontract parts of the contract subcontracted remains, first accepted as eligible sub-contractor construction contractor. The developer will not accept this further subcontract concatenation.

Lappeenranta Housing Services Ltd / Orion Street 5 Renovation

Lappeenrannan Asuntopalvelu Oy | Published February 6, 2017
cpvs

The project consists of Lappeenranta Housing Services Ltd's single five-story two-step residential apartment building renovation aluetöineen Lappeenranta Skinnarila district, at Orion Street 5. In addition, the house has a basement above ground, which is also located two flats. The property has 42 residential units with a total living area of ​​1878 m2. The basement floor is irtainvarastot, VSS mode, saunas pesutiloineen, laundry room, drying room, storage rooms and technical rooms. The estimated construction start date in May 2017 and the length of the period is 1 year. Urakkatarjoukset are invited to the following: - works, - HVAC works, - electrical contract. The building contractor is the main contractor of the project (project supervisor). HEVAC and electricity contracts are subject to the page contracts. The developer's contract with the contractor may subcontract parts of the contract subcontracted remains, first accepted as eligible sub-contractor construction contractor. The developer will not accept this further subcontract concatenation. The project consists of Lappeenranta Housing Services Ltd's single five-story two-step residential apartment building renovation aluetöineen Lappeenranta Skinnarila district, at Orion Street 5. In addition, the house has a basement above ground, which is also located two flats. The property has 42 residential units with a total living area of ​​1878 m2. The basement floor is irtainvarastot, VSS mode, saunas pesutiloineen, laundry room, drying room, storage rooms and technical rooms. The estimated construction start date in May 2017 and the length of the period is 1 year. Urakkatarjoukset are invited to the following: - works, - HVAC works, - electrical contract. The building contractor is the main contractor of the project (project supervisor). HEVAC and electricity contracts are subject to the page contracts. The developer's contract with the contractor may subcontract parts of the contract subcontracted remains, first accepted as eligible sub-contractor construction contractor. The developer will not accept this further subcontract concatenation.
  • 1