Call +44 800 9755 164

Public tenders for electrical in Kuopio Finland

Find all Electrical tenders in the world.
Finding business opportunities has never been easier.

Results for electrical. Make a new search!

Electrical

Kuopion ev.lut. seurakuntayhtymä | Published December 11, 2014  -  Deadline February 15, 2015
cpvs
31700000

Kuopio ev. vices. seurakuntayhtymä request a quote for the Parish Union of ownership of churches, parish halls, cemeteries real estate and camp centers, electrical goods acquisition in accordance with the attached tender.

Electrical installation and maintenance services procurement

Kuopion ev.lut. seurakuntayhtymä | Published December 5, 2014  -  Deadline February 15, 2015
cpvs
50710000

Kuopio ev. vices. seurakuntayhtymä request a quote for the Parish Union of ownership of churches, parish halls, cemeteries real estate and camp centers, electrical installation and maintenance work in accordance with the attached tender.

Linnanpelto area Lvij-, electrical and iron-design

Niiralan Kulma Oy | Published April 1, 2015
Winner
AH Elens Oy/AH Talotekniikka
cpvs
71000000

Linnanpelto area of ​​the block to be unloaded four buildings to replace the envisaged new buildings of phase 1 lvij-, electrical and iron design.

Electrical installation work

Senaatti-kiinteistöt, Itä-Suomen alue | Published November 22, 2016
Winner
Sähkötoimisto Kenttälä Oy
cpvs
45310000

Institution Archives about 5 000 m² big central archive will be built.

The construction work carried out in the project management as a service, where the lots by reference to the agreements made in the name of the subscriber. Works tendered subcontracts. Construction of profit may be subject to changes during the implementation of the project.

This is the second announcement relates to electrical works.

Sähköurakka.

Nilsiän church home HVAC renovation of the electrical contract

Kuopion ev.lut. seurakuntayhtymä | Published March 10, 2017  -  Deadline March 27, 2017
cpvs
45310000

Will be renovated built in 1972 and 1982, extended the church home. estimated two-storey building repair work, the extent of 930 gross m2. The main remedies are the whole building integrated ventilation renovation, water and sewer line equipment renewal (excl. Ground-floor trunk sewer), replacement of water pipes, the bottom layer of the rainwater drainage changes in the courtyard, renovation of real estate thermal management devices, renovation of the property radiator network, replacement of electrical engineering as well as construction-room-less elevator and subsequent modifications and to the second floor. Both layers are made small changes in the state of the operation mode needs to happen. Construction form of a divided piece. Contractor construction engineering contractor for the meaning of the legislation and the main implementer. HEVAC and electrical work contracts carried out in the main contract of subordination to page-based contracts. The contract period is 32/2017 - 11/2018. The acquisition has been published prior notification 03.02.2017. Will be renovated built in 1972 and 1982, extended the church home. estimated two-storey building repair work, the extent of 930 gross m2. The main remedies are the whole building integrated ventilation renovation, water and sewer line equipment renewal (excl. Ground-floor trunk sewer), replacement of water pipes, the bottom layer of the rainwater drainage changes in the courtyard, renovation of real estate thermal management devices, renovation of the property radiator network, replacement of electrical engineering as well as construction-room-less elevator and subsequent modifications and to the second floor. Both layers are made small changes in the state of the operation mode needs to happen. Construction form of a divided piece. Contractor construction engineering contractor for the meaning of the legislation and the main implementer. HEVAC and electrical work contracts carried out in the main contract of subordination to page-based contracts. The contract period is 32/2017 - 11/2018. The acquisition has been published prior notification 03.02.2017.

Nilsiän church home HVAC renovation of the electrical contract

Kuopion ev.lut. seurakuntayhtymä | Published March 22, 2017  -  Deadline March 31, 2017
cpvs
45310000

Will be renovated built in 1972 and 1982, extended the church home. estimated two-storey building repair work, the extent of 930 gross m2. The main remedies are the whole building integrated ventilation renovation, water and sewer line equipment renewal (excl. Ground-floor trunk sewer), replacement of water pipes, the bottom layer of the rainwater drainage changes in the courtyard, renovation of real estate thermal management devices, renovation of the property radiator network, replacement of electrical engineering as well as construction-room-less elevator and subsequent modifications and to the second floor. Both layers are made small changes in the state of the operation mode needs to happen. Construction form of a divided piece. Contractor construction engineering contractor for the meaning of the legislation and the main implementer. HEVAC and electrical work contracts carried out in the main contract of subordination to page-based contracts. The contract period is 32/2017 - 11/2018. The acquisition has been published prior notification 03.02.2017. Will be renovated built in 1972 and 1982, extended the church home. estimated two-storey building repair work, the extent of 930 gross m2. The main remedies are the whole building integrated ventilation renovation, water and sewer line equipment renewal (excl. Ground-floor trunk sewer), replacement of water pipes, the bottom layer of the rainwater drainage changes in the courtyard, renovation of real estate thermal management devices, renovation of the property radiator network, replacement of electrical engineering as well as construction-room-less elevator and subsequent modifications and to the second floor. Both layers are made small changes in the state of the operation mode needs to happen. Construction form of a divided piece. Contractor construction engineering contractor for the meaning of the legislation and the main implementer. HEVAC and electrical work contracts carried out in the main contract of subordination to page-based contracts. The contract period is 32/2017 - 11/2018. The acquisition has been published prior notification 03.02.2017.

Electrical Design of the apartment block to Kuopio

IS-Hankinta Oy | Published March 1, 2016  -  Deadline March 17, 2016
cpvs
71000000

The design includes a property-Kys Oy tasks of the future residential apartment building electrical design. Target is an 8-storey apartment building, which is linked to the case of the lowest layer 3 LPA plot the future of car parking garage. Parking Building the Tate-Design is not part of the mandate, but the technology of the accession of planning and coordination of the car deck technology, including the design of the content.

NOTE! Notification information can be found Tarjouspalvelu.fi -toimittajaportaalista. Also on offer / request to participate, the transmission is done in this way. Direct link to the notification of additional information can be found here Hilma-notification.

The electrical planning framework agreement 2017-2018

Kuopion kaupunki | Published November 2, 2016  -  Deadline November 29, 2016
cpvs
71320000

Status of Kuopio Centre for tenders for electrical design of the framework agreement for the years 2017-2018, as well as any option years 2019 and 2020. The Contract comprises TATE12 (RT 10-11129) the functions of the task list. Tasks include items from the main designer of a rule, the architectural designer. The extent of the design task and the content will be agreed on a project basis.

Properties of repairs / modifications, electrical and cabling Making

IS-Hankinta Oy | Published March 17, 2016
Winner
JOB Kiinteistötekniikka Oy
cpvs
71500000

Property repairs / modifications tasks in electrical and cabling work contract from 15.03.2016 with the temporary contract period.

NOTE! Notification information can be found Tarjouspalvelu.fi -toimittajaportaalista. Direct link to the notification of additional information can be found here Hilma-notification.

https://tarjouspalvelu.fi/ishankinta/?id=55982&tpk=753241d6-e542-4e30-bf00-423cce2e7334

Property repairs / modifications tasks and electrical cabling making.

IS-Hankinta Oy | Published March 19, 2016
Winner
JOB Kiinteistötekniikka Oy
cpvs
71500000

Property repairs / modifications tasks in electrical and cabling work contract from 15.03.2016 with the temporary contract period.

Note: Notice Additional information can be found Tarjouspalvelu.fi -toimittajaportaalista. Direct link to the notification of additional information can be found here Hilma declaration: https://tarjouspalvelu.fi/ishankinta/?id=55982&tpk=753241d6-e542-4e30-bf00-423cce2e7334

Linnanpelto area LVIJ-, ELECTRICAL and RAU-design

Niiralan Kulma Oy | Published January 9, 2015  -  Deadline February 23, 2015
cpvs
71000000

The project is located in Kuopio Linnanpelto range including a block of four. The area has confirmed the new town plan, which allows for new construction of residential buildings to be unloaded state. The purchasing process in question. new buildings lvij-, electrical and iron design. Tenders may be submitted for each design element of area separately or yhdistelmätarjouksena, the invitation to tender for more information. The design task is carried out in three stages, the designer selected the stock of the second and third stages of the design, the terms in the contract documents. The acquisition of the language is Finnish. Planners must master plans and the working language used in the Finnish language.

Properties of repairs / modifications of electrical and cabling work Making

IS-Hankinta Oy | Published December 17, 2015  -  Deadline January 27, 2016
cpvs
71500000

Properties in repair / modification tasks in electrical and cabling work contract from 03.15.2016 with the temporary contract period. NOTE! Ad information can be found Tarjouspalvelu.fi -toimittajaportaalista. Also on offer / request to participate, the transmission is done in this way. A direct link to the notification the additional information can be found here Hilma notification. https://tarjouspalvelu.fi/ishankinta/?id=48781&tpk=f2a9412d-afbf-490b-a8c1-ba183b03717a

Kaski Street 8-12, Kuopio, the renovation of the building, HEVAC and electrical works

Niiralan Kulma Oy | Published November 9, 2015  -  Deadline December 11, 2015
cpvs
45000000, 45330000, 45310000

Two blocks of flats peruskorjaus.Taloissa a total of 36 apartments, with a floor area 2195 m2 and a volume of 9240 m3. Implementation divided by the contract. The work is the main contract, which is subjected to HEVAC and electrical works.

Niiralankatu 8, Kuopio, renovation, construction, plumbing, IV, RAU and Electrical Works

Niiralan Kulma Oy | Published October 2, 2015  -  Deadline November 20, 2015
cpvs
45000000, 45310000, 45332000, 45331000

This is a block of flats in a complete overhaul. The project is implemented in two stages, phases overlap. The work is the main contract. LV, intravenous RAU and electrical works side-contracts, which are subjected to alistamissopimuksella the principal contract.

Niiralankatu 8, renovation, building, heating, plumbing, intravenous, electrical and building automation works

Niiralan Kulma Oy | Published December 22, 2015
Winner
A-Pipe Oy
cpvs
45000000, 45310000, 45332000, 45331000

Complete renovation of residential apartment building. The work is the main contract, which the LV, IV, RAU and electrical works are subjected to.

Correction Notice, electrical planning framework agreement 2017-2018

Kuopion kaupunki | Published November 14, 2016  -  Deadline November 29, 2016
cpvs
71320000

Undefined Correction Notice corrects the tender dossiers conflicts. An invitation to tender offer deadline is Tuesday 29.11.2016 at 9:00. Company to qualify for the previous year ending on turnover, which shall be at least EUR 0.2 million. Status of Kuopio Centre for tenders for electrical design of the framework agreement for the years 2017-2018, as well as any option years 2019 and 2020. The Contract comprises TATE12 (RT 10-11129) the functions of the task list. Tasks include items from the main designer of a rule, the architectural designer. The extent of the design task and the content will be agreed on a project basis. Notice of Correction corrects the tender dossiers conflicts. An invitation to tender offer deadline is Tuesday 29.11.2016 at 9:00. Company to qualify for the previous year ending on turnover, which shall be at least EUR 0.2 million. Status of Kuopio Centre for tenders for electrical design of the framework agreement for the years 2017-2018, as well as any option years 2019 and 2020. The Contract comprises TATE12 (RT 10-11129) the functions of the task list. Tasks include items from the main designer of a rule, the architectural designer. The extent of the design task and the content will be agreed on a project basis.

Linnanpelto area, Kuopio, New Buildings, Construction, LVA-, IV and electrical works

Niiralan Kulma Oy | Published January 8, 2016  -  Deadline February 26, 2016
cpvs
45000000, 45331000, 45330000, 45310000

The site consists of three new buildings with 97 apartments, car parking, as well as waste canopy. The project also includes three wooden apartment building on landing. Construction in stages. Embodiment is divided into contract with a building contractor acts as the main implementer. LVA-, IV and electrical works being undercut page-based contracts. Construction work take into account the adjacent buildings and their inhabitants, as well as the traffic.

Sulkavantie 5, terraced house in the works, HVAC works and electrical works

Siilinjärven Kotipolku Oy | Published March 14, 2016  -  Deadline April 27, 2016
cpvs
45000000, 45310000, 45330000

The target is to Siilinjärvi plot 1-4218-1 constructed, comprising two buildings townhouse project. The site is located at Sulkavantie 5, 71800 Siilinjärvi.

The new buildings are one-story residential townhouses, which will be 8 small apartments. Floor area of ​​approx. 345 m 2.

As a form of execution is divided into contract with the building contractor is the main contractor and HVAC and electrical contract works oppressed page contracts. The main contractor is able to offer the total contract HVAC their works.

South Siilinjärven resident of house / electric

Vuorelan Kunto ry | Published February 1, 2017  -  Deadline March 3, 2017
cpvs

The association for future multi-purpose / inhabitant of the house electrical accessories. The association for future multi-purpose / inhabitant of the house electrical accessories.

Nilsiän church home HVAC renovation works, HVAC works and electrical works

Kuopion ev.lut. seurakuntayhtymä | Published February 5, 2017
cpvs
45000000

The requirements in the contract documents will be renovated in accordance with the specified built in 1972 and 1982, extended the church home. estimated two-storey building repair work, the extent of 930 gross m2. The main remedies are the whole building integrated ventilation renovation, water and sewer line equipment renewal (excl. Ground-floor trunk sewer), replacement of water pipes, the bottom layer of the rainwater drainage changes in the courtyard, renovation of real estate thermal management devices, renovation of the property radiator network, replacement of electrical engineering as well as construction-room-less elevator and subsequent modifications and to the second floor. Both layers are made small changes in the state of the operation mode needs to happen. Construction form of a divided piece. Contractor construction engineering contractor for the meaning of the legislation and the main implementer. HEVAC and electrical work contracts carried out in the main contract of subordination to page-based contracts. Estimated contract period is 32/2017 - 11/2018. This is an advance notice about week 9/2017 chore calculation of the future building project, which includes the church Nilsiän home HVAC renovation. on the basis of the prior information notice can not register to provide project. The project later publication of a contract notice. All information provided is preliminary data, which may still be subject to change. The requirements in the contract documents in accordance with the specified